Loading...
HomeSearchMy WebLinkAbout1999-07-29 WC Dept of Hwy Sketch Plan1999-09-10 EAW1999-09-21 Wetland Permit Application Package2000-01-24 Archaeological Survey2000-01-24 Phase I Archoeological report2000-02-08 Lot-by-Lot Grading2000-02-09 Erosion Control Plan2000-05-17 Expand acreage grading permit2000-05-17 Grading Permit Expansion Area2000-06-01 Specs for Sanitary Sewer, Watermain, Storm Sewer2000-06-05 Minutes of Pre Con Meeting Utilities2000-06-08 Proposal for Sanitary Sewer, Watermain2000-06-14 Elk River Concrete2000-06-14 Elk River Concrete Transmittal2000-06-14 Schedule, Proposal Form2000-07-10 WC Dept of Hwy Plan Review2000-08-01 Dept of Hwys Permit 0035, 00362000-08-02 2 Access permits2000-08-15 WCDofH- Permit No. 0035 and 00362000-09-18 Excavation Obseration & Const Materials Testing2000-09-22 Report of Field Compaction Tests2001-06-19 Punch List2001-06-22 Notice of Storm Water Permit Coverage2001-06-28 Culvert2001-07-02 EG Rud re: Lot 30, Block 32001-07-12 Wetland Water Elevation2001-07-30 Culvert Motion to Pass Requested2001-11-09 Notice of Decision, Permit2001-11-09 Notice of Wetland Conservation Decision2001-12-26 MN Pipe & Equip Submittal2002-05-02 Punch List2003-10-07 2 MPCA Permits, 1 SWPPP2004-09-16 Ltr Authorization to Commence Work2004-09-20 Mitigation Letter2004-09-22 Wetland Mitigation2004-10-15 Wetland Restoration2004-10-25 Progress Meeting Minutes2004-11-30 Wetland Mitigation2005 Wetland Monitoring Report2005-02-23 Wetland Replacement Order2005-03-02 Punch List2005-04-20 Punch List2005-04-27 Wetland Restoration Order2005-05-07 Invoices for Jan/Feb 20052005-05-17 TEP Response to Restoration Order2005-05-20 Response to Notice of Default2005-05-23 Response to Restoration Order2005-06-15 Summary of Wetland Issues to Residents2005-06-23 Erosion Contrrol Fence Review2005-07-15 Engineering Wetland Status Reviews2005-08 Wetland Mailing2005-08-01 Status of Wetland Reviews2005-08-15 Pedestrian Trail Construction2005-08-24 Restoration Order2005-08-30 Fill in Wetland2005-09-01 Yard Restoration2005-09-20 EstimateTrail Paving2005-09-23 Summary of Wetland Issues to Residents2005-10-05 Sod Review2005-10-31 Sidewalk Repairs2005-10-31 Sidewalk Repairs/Turf Restoration2005-12-06 Final Construction Punch List2005-12-06 Final List of Construction Items2006-04-17 Ltr Re 2006 County Ditch No 9 Flood Study2006-04-17 2006 County Ditch No 9 Flood Study2006-05-30 Restore Yard Damage2006-05-30 Restoring Yard Damage2006-06-21 Invoice for Sod Replacement2006-06-23 Variance Granted for WetlandNo Date Edina Correction IssuesNo Date Mitigation As-BuiltNo Date WSWCD Wetland Replacement Plan