Loading...
2002-05-15 Future Street AssessmentAdW AAMW A&ASEH 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717 TO: Linda Goeb City Administrator Albertville, Minnesota FROM: Peter J. Carlson, P.E. City Engineer DATE: May 15, 2002 MEMORANDUM 320.229.4300 800.572.0617 320.229.4301 FAX RE: Albertville Business Park Future Street Assessment to Lot 3, Block 1, Albertville Business Park Albertville, Minnesota SEH No. A-ALBEV 0116.00 14 The original plans for the above project show the extension of 67'h Street to the west line of Lot 3, Block 1, Albertville Business Park. On 5/7/02 a TEP (Technical Evaluation Panel) meeting was convened to discuss project wetland impacts. As a condition of granting the necessary wetland permit, the TEP recommended the termination of 671h Street approximately 190 feet east of its present location. This action would protect an existing wetland area under this phase of the project. The developer has agreed to make this change. See the attached revised plan sheet. Consequently, the street assessment for Lot 3, Block 1, Albertville Business Park will be incomplete at the conclusion of this phase of the project. Thus, the remaining street assessment in the amount of approximately $30,000 would be levied against said lot in a future phase of the project. sh/mh Attachment c: John Darkenwald, Darkenwald Real Estate (w/attachment) Mike Couri, City Attorney (w/attachment) Cindy Sherman, Northwest Associated Consultants (w/attachment) Scott Hedlund, SEH (w/attachment) Michele Caron, RLK Kuusisto (w/attachment) wAalbev\01 l acoaW51502-city-m.doc Short Elliott Hendrickson Inc. Your Trusted Resource Equal Opportunity Employer '• I '•�\��� ""4:�`\`, \ DRAINAGE AND UTILITY -EASEMENT ; �`%.._--- .____ tC""""-•` _. Y,._ __-- —Y _ u -i, —T —r C'k T* RUSTf' J'v1-R :JW' -*1 A TO say;?/ *r WETLAND LIMIT PRomer 9.0r�,rff-[J� eVL 25' BUFFER \-. `/ I M GAmi IT /RODEIN�/ FENCETO BE REMOVED WITHIN-alTS OF CONSTRUCTION '�,�.NAtiNMy�l►Tf� I `�/ .,.._._._. ��'tBY OTHERS FR6r-E 20' ORAINAGE AND UPUTY EASMENT \ �; iLLE SE EES�T 29 F(jjR L jfATEM/WN NOTEfiL IE�S BUSIN 8.0 FG / ,IPA LOT 3 i H 'tRADINq TO BE PERFORMED 6b`FGUNDER SE ABATE CONTRACT SEE -SHEET PERTAINING' /.r �•` .l ,I /TO HWY. 94 LOOP FO(2 �`• / / / '/ I 1 ' CONTINUATION OF WATERMAIN. \ I \ /• / /// \ 3.\ .I( �.�"� � � /• / // 'mil ('�C� r� .-,., \ ��' ' ` Gc NOTES . ��� \ `� - \� � _ > .. > , �; :r x,�,' �x �`>%5�• I � \ .< . AFTER ALBERTVILLE BUSINESS PARK CONTRACTOR HAS TURNED ROADWAY SUBCRADE AND ROW GRADING OVER TO THIS CONTRACT, CONTRACTOR MAIL COORDINATE WITH ALBERIIVILLE BUSINESS PARK CONTRACTOR TO ALLOW CONCURRENT WORK/ACCESS. O CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES AND TOPOGRAPHIC FEATURES, SUCH AS EXISTING STORM SEWER INVERTS AT PROPOSED CONNECTIONS, PRIOR TO THE START OF SITE GRADING. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM THE PLANS. xl k t1j`r' CONTRACTOR IS TO CONTACT 'GOPHER STATE ONE CALL' FOR UTILITY LOCATIONS (651-454-0002) 48 HOURS PRIOR TO EXCAVATION/CONSTRUCTION. l l i.YX L 2A i STE GRADING OPERATIONS SHALL BE COMPLETED BY OTHERS AS PART OF THE ALBERTVILLE BUSINESS PARK PROJECT. THE ROADWAY SHALL BE GRADED AND PREPARED TO SUBGRADE ELEVATIONS BY OTHERS. USEABLE MATERIAL TO BE USED FOR BACKFILL OF CURB AND GUTTER WILL BE STOCKPILED IN THE RIGHT OF WAY BY OTHERS. ALL EROSION CONTROL MEASURES MUST BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING OPERATIONS AND BE MAINTAINED UNTIL ALL AREAS ALTERED ON THE SITE HAVE BEEN RESTORED. CONTRACTOR SHALL COORDINATE WITH ALBERTVILLE BUSINESS EXISTING TOPOGRAPHY PROVIDED BY JOHN OLIVER & AS' PARK CONTRACTOR TO MAINTAIN CONTINUOUS EROSION CONTROL THROUGH ROADWAY TURNOVER PHASE. ALL DIMENSIONS SHOWN ARE TO BACK OF CURB UNLESS EROSION CONTROL MEASURES SHALL INCLUDE HAY BALES AROUND CATCH BASINS, SILT FENCE ALONG DRAINAGE OUTFALL SOILS SHALL BE PROCESSED TO MEET MOISTURE CONTEN AREAS, AND TEMPORARY ROCK CONSTRUCTION ENTRANCES AT LOCATIONS TO BE DETERMINED BY THE CONTRACTOR AND REPORT DATED JUNE 25, 2001. PREPARED BY GME CON`. APPROVED BY THE CITY. STOCKPILE EXCESS USEABLE MATERIAL, IF ANY, ON ADJ! ALL CONSTRUCTION ENTRANCES SHALL BE SURFACED WITH CRUSHED ROCK ACROSS FULL WIDTH FROM ENTRANCE POINT TO 50 CONTRACTOR TO MINIMIZE DISTURBANCE TO EXISTING WE' FEET INTO CONSTRUCTION ZONE. REFER TO DETAIL. TOPSOIL SHALL BE STRIPPED AND STOCKPILED BY OTHERS, CONTRACTOR SHALL RE -SPREAD AND COMPACT TOPSOIL TO ALL 2 ROWS OF SOD SHALL BE PLACED BEHIND ALL CURB A DISTURBED AREAS NOT TO BE PAVED WITHIN THE RIGHT OF WAY. TOPSOIL SHALL BE RE -SPREAD WITHIN THE PONDS AND CONTRACTOR TO UTILIZE EXISTING SILT FENCE REMAINING MITIGATION AREAS BY OTHERS. CONTACT ENGINEER TO VERIFY VALIDITY OF EXISTING SIL' DESIGNER: SJB CHECKED BY: MJC APPROVED BY: DESIGN TEAM ^ ®yyy �_ , \ se�atn, nr. D y,pea. yjeye, ��pr: i`. ® enoes ,ce�a� Y�la�-,ao,,ri \1�-*ems euo mw. C4ol. or. • eotr. µoo • tmoetmte, tw. eeeee 1 troraby certify that thla plop was p me or under my d&eat wp-,U(on a a 'MyIkeReed Profeceimd En Inver la the St e o Ntms o MI son aron DA LIC. NO._ NO. BY DATE REVISIONS