Loading...
2002-06-24 Elevation DiscrepancyAdi =5EH MEMORANDUM 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717 320.229.4300 800.572.0617 320.229.4301 FAX TO: Michele Caron, RLK-Kuusisto LTD FROM: Scott D. Hedlund, P.E. DATE: June 24, 2002 RE: Albertville Business Park - Albertville, MN SEH No. A-ALBEV 0116.00 14 During construction operations on the City Project (2002 NW Commercial Park Improvements — SEH No. A-ALBEV 0113.00), SEH surveyors discovered a 0.5-foot elevation discrepancy between like points staked by RLK- Kuusisto survey crews and SEH survey crews; the relative elevation of points staked by RLK are 0.5-foot higher than those staked by SEH. After further investigation it was determined that the RLK-Kuusisto Project (Albertville Business Park) was designed and staked using benchmarks from the NGVD 29 vertical datum. The official City benchmarks are taken from the NAVD 88 vertical datum. Rather than require the redesign and restaking of the Albertville Business Park project using the NAVD 88 datum and per the request of RLK-Kuusisto, the City will accept a field modification to the road grade between stations 18+50 and 20+50 and a field modification of the sanitary sewer grade between SANMH-33 and SANMH-34, in order to transition each to the City Project at Station 21+00. Note, the full structural street section shown on the plans is still required in the street grade transition area, and the modified pipe grade shall be no less than the planned grade. Despite the City's willingness to accommodate RLK-Kuusisto in this datum discrepancy, the City will require that all record drawing elevations be per the City datum (NAVD 88). sh c: Pete Carlson, SEH Mike Czech, SEH Linda Goeb, City of Albertville \\ ehsc3\=v\a1bev\0113\corA061902-m-r1k.doc Short Elliott Hendrickson Inc. Your Trusted Resource Equal Opportunity Employer