2003-02-20 A & B SAC & WAC=SEN
1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717
TO: Jon Sutherland
City Building Official
Albertville, Minnesota
FROM: Peter J. Carlson, PE
City Engineer
DATE: February 20, 2003
MEMORANDUM
320.229.4300 800.572.0617 320.229.4301 FAX
RE: Albertville CrosG1�i1 Center
BiWdings "A- & `B"
Albertville, Minnesota
SEH No. A-ALBEV 0301.00 D58
The comments in my December 30, 2002 review memo have been incorporated. Please verify
with the Fire Department their concurrence regarding location of fire hydrants and post
indicating valves.
I calculated sanitary sewer, water main, and storm sewer charges for this property as follows:
Total Lot Size
Total Impervious Lot Area
Percentage Impervious
The charges are as follows:
Building "A"
Storm Water Utility Connection Charge
Quarterly Storm Sewer Utility Charge
Sanitary Sewer Access Charge (SAC)
Water Access Charge (WAC)
77,820 SF = 1.79 Acres
63,020 SF = 1.45 Acres
81.0%
$470.83
$19.77
A
W '*� -
$79,800 *
$38,000 *
* The SAC and WAC charges were computed assuming a seating capacity of 159
people and following Met Council guidelines of 1 unit per 8 seats for a full
service restaurant. I
60
o
Short Elliott Hendrickson Inc. 0 Your Trusted Resource 0 Equal Opportunity Employer
j,��Date Received: C;2 t q
712. jL4 ber'tvi e CITY OF ALBERTVILLE Date Notified:
s Town 13ving. eig aey tNs.
BUILDING PERMIT Date Paid:
P.O. Box 9 PNnwrr• ('7=3) h0-7_minr; Check #/Cash:
AL.BERTVILLE, MN 55301 Permit No.' 6AQ
_
7
Contractor License Nu I) Date SubmittelL BUILDING PERMIT FEES
e
Site Address 5� j Permit
Legal Desch 'on Surcharge Z -7 s i
Addition: & Lot: f Block: Plan Check Z. of 0
P.I.D. : 'e-45-,,:,nd A ild)7 Penalty
Owner (Name) / j�At'dress l C Phone #-.('mchde fteaceft) Engineering
9 "gyres Site
Architect (Name} Phone#: (mdude area code) Fire place
Plumbing
Builder (Name] (Addressl7#3 -' ��Phone#(nududeareacode) S&W
Mechanical'56FANM
Water Meter
Type of Work JeWAC
New Construction tg Addition ❑ Garage 0 Deck ❑ SAC
Finish Waternish Basement ❑ Stied ❑ Fireplace ❑ Alterations ❑ Other
Re-roofing/Siding ❑ Other(list) SiAa0z.1 Other
Size of Structure j Total square Footage � TOTAL J OZ
Length
Width First Floor
Height Second -Poor — CODE ANALYSIS
Type of Count[ -'
Completion Date Estimated Va4e Use of Bldg.
Occupancy Grp
Occupancy Load
The undersigned hereby agrees that, in case such permit is granted, that all work which Zoning District
shall be done and all materials which shall be used shall comply with the plans and
specifications therefore herewith submitted and with all the ordipAnces of said City of =
Albertville applicable thereto. ` h) i') f oti,-e,
Fire Sprinklers Required
Yes No
Applicant's Signature Applicant's Printed Name
SPECIAL APPROVALS
Approved By Building Official <W/ MEN Date
Date Copied Approved
SPECIAL CONDITIONS & COMMENTS:? x"'
- Zonin
�l"h is r .tiM fi__.4t be'g4iei, is =brs 4-e, Inki A r, mPnf' cf Fire Dept
•1 t ! Health Dept
Public Works
S -t— o County
City Engineer 11
rn 1' orhYh-eu:ejmx y Jg A700.3 . Other
Jon Sutherland
From:
Jane Amoldy[albertvillecityof@earthlink.net]
Sent:
Wednesday, February 19, 2003 1:43 PM
To:
Jon Sutherland; Pete Carlson
Subject:
Spectator's possible seating capacity
Hi Pete and Jon,
Nancy from Shingobee builders just called regarding Spectators. She is not
certain who will be submitting the permit for the interior finish of
Spectators if it will be them or someone else, however, she counted how many
seats there should be. On the inside she counted 159 seats (include chairs
and stools) and on the patio outside she counted 64 seats. I know you had a
question earlier regarding this, so I thought I would pass this information
on to you.
Jane
1
2/19/03
Nancy from Shingobee Builders called to let us know the possible seating capacity for
Spectator's.
Patio: 64 seats
Inside: 159 seats including stools/chairs
The permit will be coming for the inside finish she wasn't sure what company would be
doing the funs gs m�'—