Loading...
2003-02-20 A & B SAC & WAC=SEN 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717 TO: Jon Sutherland City Building Official Albertville, Minnesota FROM: Peter J. Carlson, PE City Engineer DATE: February 20, 2003 MEMORANDUM 320.229.4300 800.572.0617 320.229.4301 FAX RE: Albertville CrosG1�i1 Center BiWdings "A- & `B" Albertville, Minnesota SEH No. A-ALBEV 0301.00 D58 The comments in my December 30, 2002 review memo have been incorporated. Please verify with the Fire Department their concurrence regarding location of fire hydrants and post indicating valves. I calculated sanitary sewer, water main, and storm sewer charges for this property as follows: Total Lot Size Total Impervious Lot Area Percentage Impervious The charges are as follows: Building "A" Storm Water Utility Connection Charge Quarterly Storm Sewer Utility Charge Sanitary Sewer Access Charge (SAC) Water Access Charge (WAC) 77,820 SF = 1.79 Acres 63,020 SF = 1.45 Acres 81.0% $470.83 $19.77 A W '*� - $79,800 * $38,000 * * The SAC and WAC charges were computed assuming a seating capacity of 159 people and following Met Council guidelines of 1 unit per 8 seats for a full service restaurant. I 60 o Short Elliott Hendrickson Inc. 0 Your Trusted Resource 0 Equal Opportunity Employer j,��Date Received: C;2 t q 712. jL4 ber'tvi e CITY OF ALBERTVILLE Date Notified: s Town 13ving. eig aey tNs. BUILDING PERMIT Date Paid: P.O. Box 9 PNnwrr• ('7=3) h0-7_minr; Check #/Cash: AL.BERTVILLE, MN 55301 Permit No.' 6AQ _ 7 Contractor License Nu I) Date SubmittelL BUILDING PERMIT FEES e Site Address 5� j Permit Legal Desch 'on Surcharge Z -7 s i Addition: & Lot: f Block: Plan Check Z. of 0 P.I.D. : 'e-45-,,:,nd A ild)7 Penalty Owner (Name) / j�At'dress l C Phone #-.('mchde fteaceft) Engineering 9 "gyres Site Architect (Name} Phone#: (mdude area code) Fire place Plumbing Builder (Name] (Addressl7#3 -' ��Phone#(nududeareacode) S&W Mechanical'56FANM Water Meter Type of Work JeWAC New Construction tg Addition ❑ Garage 0 Deck ❑ SAC Finish Waternish Basement ❑ Stied ❑ Fireplace ❑ Alterations ❑ Other Re-roofing/Siding ❑ Other(list) SiAa0z.1 Other Size of Structure j Total square Footage � TOTAL J OZ Length Width First Floor Height Second -Poor — CODE ANALYSIS Type of Count[ -' Completion Date Estimated Va4e Use of Bldg. Occupancy Grp Occupancy Load The undersigned hereby agrees that, in case such permit is granted, that all work which Zoning District shall be done and all materials which shall be used shall comply with the plans and specifications therefore herewith submitted and with all the ordipAnces of said City of = Albertville applicable thereto. ` h) i') f oti,-e, Fire Sprinklers Required Yes No Applicant's Signature Applicant's Printed Name SPECIAL APPROVALS Approved By Building Official <W/ MEN Date Date Copied Approved SPECIAL CONDITIONS & COMMENTS:? x"' - Zonin �l"h is r .tiM fi__.4t be'g4iei, is =brs 4-e, Inki A r, mPnf' cf Fire Dept •1 t ! Health Dept Public Works S -t— o County City Engineer 11 rn 1' orhYh-eu:ejmx y Jg A700.3 . Other Jon Sutherland From: Jane Amoldy[albertvillecityof@earthlink.net] Sent: Wednesday, February 19, 2003 1:43 PM To: Jon Sutherland; Pete Carlson Subject: Spectator's possible seating capacity Hi Pete and Jon, Nancy from Shingobee builders just called regarding Spectators. She is not certain who will be submitting the permit for the interior finish of Spectators if it will be them or someone else, however, she counted how many seats there should be. On the inside she counted 159 seats (include chairs and stools) and on the patio outside she counted 64 seats. I know you had a question earlier regarding this, so I thought I would pass this information on to you. Jane 1 2/19/03 Nancy from Shingobee Builders called to let us know the possible seating capacity for Spectator's. Patio: 64 seats Inside: 159 seats including stools/chairs The permit will be coming for the inside finish she wasn't sure what company would be doing the funs gs m�'—