2003-09-18 Untreated Storm Water Pumped=SEN
September 18, 2003
Jim Brown
Project Manager
1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717 320.229.4300 320.229.4301 FAX
architecture engineering environmental transportation
Cascade H Land Company, LLC
555 3rd Street N.W.
Elk River, MN 55330
Dear Jim:
RE: Albertville, Minnesota
2002 Albertville Crossing - Phase 2
SEH No. A-ALBEV 0208.01 14
In August 2002, Twin Pines Excavating, the grading contractor for the above referenced project,
pumped untreated storm water from the site detention pond into the City storm sewer, which
eventually discharges into a storm water pond located just east of Lachman Avenue.
Discharging untreated storm water into the City's detention pond has damaged that pond by
prematurely filling it with silt and debris. This is in violation of your Developers Agreement with
the City of Albertville. Per the Developer's Agreement, you are required to clean out the pond to
it's preconstruction condition within the next 30 days. If the work is not completed within 30 days,
the City will complete the work and deduct the cost from the project surety.
Please call me if you have any questions.
Si ely,
Peter J. Car son, PE
Albertville City Engineer
djg
c: Linda Goeb, City of Albertville
Mike Couri, City Attorney
Russ Bly, SEH
uAa\a1beA020801\corr\1-brown cascade-091803.doc
Short Elliott Hendrickson Inc. Your Trusted Resource Equal Opportunity Employer