Loading...
2002-04-25 Final Site Grading.�5EN 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717 TO: Linda Goeb City Administrator Albertville, Minnesota FROM: Peter J. Carlson, P.E. City Engineer MEMORANDUM 320.229.4300 800.572.0617 320.229.4301 FAX DATE: April 25, 2002 RE: Albertville Crossing Final Site Grading and Utility Construction Plan and Specifications Review and Plat Review Albertville,- Minnesota SEH No. A-ALBEV0208.01 14 I reviewed the construction plans dated 4/19/02 and specifications dated 4/18/02 for the above referenced project. The plans are approved. Revise the plat to include a 25-foot permanent drainage and utility easement along the north line of Outlot C. mdh/sh c: Scott Hedlund, SEH Mike Czech, SEH Cindy Sherman, Northwest Associated Consultants Mike Couri, City Attorney Todd McLouth, John Oliver & Assoc. Aalbec�9208. 021,cer\042502-city-m. doc Short Elliott Hendrickson Inc. • Offices located throughout the Upper Midwest • Equal Opportunity Employer We help you plan, design, and achieve.