2004-07-15 Punch ListPUNCH LIST OWNER City of Albertville DATE OF CURRENT ISSUE CONTRACTOR LaTour Construction DATE OF ORIGINAL ISSUE SEH NO. A-ALBEV 0113.00 SUBSTANTIAL COMPLETION OWNER NO. N/A PROJECT Albertville Commercial Park FINAL COMPLETION 07/15/04 07/03/03, 12/11/03 Below is a list of items which must be completed or corrected prior to final acceptance of the subject project. A completion of these items does not in any way relieve the Contractor of the responsibility to complete the project in accordance with all Contract Documents. Item Date Date No. Item Reviewed Comments Accepted 1 Manhole 43 cone not set down all the way. 07/03/03 10/02/03 2 The l' section below the cone on manhole 45 is 07/03/03 12/08/03 cracked in 3 different locations. 10/03/03 3 Manhole 46 — the first 4' section below the cone has 07/03/03 10/03/03 a 1' x 1' area at the top that is broken out with the gasket exposed. 4 Station 30+100 to 35+00 — the bluds need to have 07/03/03 10/03/03 some additional topsoil added due to settling along with leveling and reseeded. 5 Any areas where vegetation has taken hold, 07/03/03 07/15/04 especially through RLK's portion, the silt fence has 10/03/03 to be taken down. Remove all remnants of silt fence 12/09/03 between mitigation areas and wetlands. Contact field inspector. 6 Fine grading and seeding is needed at Station 1+00 07/03/03 12/09/03 behind the mall where the 12" water main tie-in took 10/03/03 lace this spring. 12/09/03 7 Pond 2 — the east berm had never been completely 07/03/03 10/03/03 established. Tie-in with proposed work to fill in some low areas. Contact field inspector. 8 All hydrant flags are missing though the RLK's 07/03/03 10/03/03 portion of the Commercial Park. 9 Hydrant on Keystone Avenue had been hit, busting 07/03/03 07/15/04 the south 2" nozzle and leaning the hydrant to the 10/03/03 north. Repair needed. Contact field inspector. 12/09/03 10 Dress up bluds Station 35+00 to 43+00 and north 07/03/03 10/03/03 side only Station 43+00 to 47+00. Hydrant at Lot 3, southeast corner has settlement around and construction garbage. Reseed areas that need leveling or have no initial germination. Item Date Date No. Item Reviewed Comments Accepted 11 CSAH 19 west ditch along the entire length of 07/03/03 10/03/03 project needs work: 10/03/03 -North of 67"' is holding water -South of 67`h is silted in from CR 19 slope and Slumberland's slope. -Seeding has not taken hold and erosion control along wetland has failed. -Sodding is required along CR 19 through Otsego Tool's property. Contact field inspector. 12 Need valve extensions on all valves. West of 67th cul 07/03/03 10/03/03 de sac are missing. 13 Hydrant at Station 14+50 on 67 tb Street is missing its 07/03/03 10/03/03 cap chains. 14 Lower valve box at CSAH 19 and 67`'' Street. 07/03/03 10/03/03 10/03/03 15 Clean all manholes and valve boxes for easy access 07/03/03 10/03/03 after binder course. PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIME) OF THE AGREEMENT. REMARKS: Issued By: Title: djg c: Pete Carlson SEH Jim Schulz, SEH Bob Moberg, SEH Russ Bly, SEH Larry Kruse, City of Albertville John Middendorf, City of Albertville LaTour Construction U:W\ALBEV1011300WEMPUNCHLIST.DOC PUNCH LIST OWNER City of Albertville DATE OF CURRENT ISSUE CONTRACTOR LaTour Construction DATE OF ORIGINAL ISSUE SEH NO. OWNER NO PROJECT A-ALBEV 0113.00 N/A Albertville Commercial Park SUBSTANTIAL COMPLETION FINAL COMPLETION 07/15/04 07/03/03, 12/11/03 _ Below is a list of items which must be completed or corrected prior to final acceptance of the subject project. A completion of these items does not in any way relieve the Contractor of the responsibility to complete the project in accordance with all Contract Documents. Item Date Date No. Item Reviewed Comments Accepted 1 Manhole 43 cone not set down all the way. 07/03/03 10/02/03 2 The 1' section below the cone on manhole 45 is 07/03/03 12/08/03 cracked in 3 different locations. 10/03/03 3 Manhole 46 — the first 4' section below the cone has 07/03/03 10/03/03 a 1' x 1' area at the top that is broken out with the gasket exposed. 4 Station 30+100 to 35+00 — the bluds need to have 07/03/03 10/03/03 some additional topsoil added due to settling along with leveling and reseeded. 5 Any areas where vegetation has taken hold, 07/03/03 07/15/04 especially through RLK's portion, the silt fence has 10/03/03 to be taken down. Remove all remnants of silt fence 12/09/03 between mitigation areas and wetlands. Contact field inspector. 6 Fine grading and seeding is needed at Station 1+00 07/03/03 12/09/03 behind the mall where the 12" water main tie-in took 10/03/03 lace this spring, 12/09/03 7 Pond 2 — the east berm had never been completely 07/03/03 10/03/03 established. Tie-in with proposed work to fill in some low areas. Contact field inspector. 8 All hydrant flags are missing though the RLK's 07/03/03 10/03/03 portion of the Commercial Park. 9 Hydrant on Keystone Avenue had been hit, busting 07/03/03 07/15/04 the south 2" nozzle and leaning the hydrant to the 10/03/03 north. Repair needed. Contact field inspector. 12/09/03 10 Dress up bluds Station 35+00 to 43+00 and north 07/03/03 10/03/03 side only Station 43+00 to 47+00. Hydrant at Lot 3, southeast corner has settlement around and construction garbage. Reseed areas that need levelin or have no initial germination. Item Date Date No. Item Reviewed Comments Accepted 11 CSAH 19 west ditch along the entire length of 07/03/03 10/03/03 project needs work: 10/03/03 -North of 67 h is holding water -South of 6Th is silted in from CR 19 slope and Slumberland's slope. -Seeding has not taken hold and erosion control along wetland has failed. -Sodding is required along CR 19 through Otsego Tool's property. Contact field inspector. 12 Need valve extensions on all valves. West of 67h cul 07/03/03 10/03/03 de sac are missing. 13 Hydrant at Station 14+50 on 67`h Street is missing its 07/03/03 10/03/03 cap chains. 14 Lower valve box at CSAH 19 and 67`h Street. 07/03/03 10/03/03 10/03/03 15 Clean all manholes and valve boxes for easy access 07/03/03 10/03/03 after binder course. PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIME) OF THE AGREEMENT. 'ou_:. Issued By: Title: djg c: Pete Carlson SEH Jim Schulz, SEH Bob Moberg, SEH Russ Bly, SEH Larry Kruse, City of Albertville John Middendorf, City of Albertville LaTour Construction U:W\ALBEV\011300\SPECS\PUNCHLIST. DOC