2003-07-03 Punch ListOWNER CONTRACTOR SEH NO. OWNER NO. PROJECT PUNCH LIST City of Albertville DATE OF CURRENT ISSUE LaTour Construction DATE OF ORIGINAL ISSUE A-ALBEV 0113.00 SUBSTANTIAL COMPLETION FINAL COMPLETION Albertville Commercial Park 07/03/03 07/03/03 Below is a list of items which must be completed or corrected prior to final acceptance of the subject project. A completion of these items does not in any way relieve the Contractor of the responsibility to complete the project in accordance with all Contract Documents. Item Date Date No. Item Reviewed Comments Accepted 1 Manhole 43 cone not set down all the way. 07/03/03 2 The 1' section below the cone on manhole 45 is cracked in 3 07/03/03 different locations. 3 Manhole 46 — the first 4' section below the cone has a 1' x F area 07/03/03 at the top that is broken out with the gasket exposed. 4 Station 30+100 to 35+00 — the bluds need to have some additional 07/03/03 topsoil added due to settling along with leveling and reseeded. Any areas where vegetation has taken hold, especially through 5 RLK's portion, the silt fence has to be taken down. Remove all 07/03/03 remnants of silt fence between mitigation areas and wetlands. Contact field inspector. 6 Fine grading and seeding is needed at Station 1+00 behind the mall 07/03/03 where the 12" water main tie-in took place this spring. Pond 2 — the east berm had never been completely established. Tie- 7 in with proposed work to fill in some low areas. Contact field 07/03/03 inspector. 8 All hydrant flags are missing though the RLK's portion of the 07/03/03 Commercial Park. Hydrant on Keystone Avenue had been hit, busting the south 2" 9 nozzle and leaning the hydrant to the north. Repair needed. Contact 07/03/03 field inspector. Dress up bluds Station 35+00 to 43+00 and north side only Station 10 43+00 to 47+00. Hydrant at Lot 3, southeast comer has settlement 07/03/03 around and construction garbage. Reseed areas that need leveling or have no initial germination CSAH 19 west ditch along the entire length of project needs work: -North of 67d is holding water 11 -South of 67d is silted in from CR 19 slope and Slumberland's 07/03/03 slope. -Seeding has not taken hold and erosion control along wetland has failed. Item Date Date No. Item Reviewed Comments Accepted -Sodding is required along CR 19 through Otsego Tool's property. Contact field inspector. Need valve extensions on all valves. West of 67d' cul de sac are 12 07/03/03 missin . 13 Hydrant at Station 14+50 on 67 h Street is missing its cap chains. 07/03/03 14 Lower valve box at CSAH 19 and 67d Street. 07/03/03 15 Clean all manholes and valve boxes for easy access after binder 07/03/03 course. PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIME) OF THE AGREEMENT. REMARKS: Issued By: Title: Mdh/tjw c: Pete Carlson SEH LaTour Construction Mike Czech, SEH Linda Goeb, City of Albertville Tim Guimont, City of Albertville X:"EVILBE V\01 I MPECSTUNCEUST. DOC PUNCH LIST OWNER City of Albertville DATE OF CURRENT ISSUE CONTRACTOR LaTour Construction DATE OF ORIGINAL ISSUE SEH NO. A-ALBEV 0113.00 SUBSTANTIAL COMPLETION FINAL COMPLETION PROJECT Albertville Commercial Park 07/03/03 07/03/03 Below is a list of items which must be completed or corrected prior to final acceptance of the subject project. A completion of these items does not in any way relieve the Contractor of the responsibility to complete the project in accordance with all Contract Documents. Item Date Date No. Item Reviewed Comments Accepted 1 Manhole 43 cone not set down all the way. 07/03/03 2 The l' section below the cone on manhole 45 is cracked in 3 07/03/03 different locations. Manhole 46 — the first 4' section below the cone has a l' x 1' area 3 at the top that is broken out with the gasket exposed. 07/03/03 4 Station 30+100 to 35+00 — the bluds need to have some additional 07/03/03 topsoil added due to settling along with leveling and reseeded. Any areas where vegetation has taken hold, especially through 5 RLK's portion, the silt fence has to be taken down. Remove all 07/03/03 remnants of silt fence between mitigation areas and wetlands. Contact field inspector. 6 Fine grading and seeding is needed at Station 1+00 behind the mall where the 12" water main tie-in took place this spring. 07/03/03 Pond 2 — the east berm had never been completely established. Tie- 7 in with proposed work to fill in some low areas. Contact field 07/03/03 inspector. 8 All hydrant flags are missing though the RLK's portion of the 07/03/03 Commercial Park. Hydrant on Keystone Avenue had been hit, busting the south 2" 9 nozzle and leaning the hydrant to the north. Repair needed. Contact 07/03/03 field inspector. Dress up bluds Station 35+00 to 43+00 and north side only Station 10 43+00 to 47+00. Hydrant at Lot 3, southeast corner has settlement 07/03/03 around and construction garbage. Reseed areas that need leveling or have no initial germination CSAH 19 west ditch along the entire length of project needs work: -North of 67 b is holding water 11 -South of 670' is silted in from CR 19 slope and Slumberland's 07/03/03 slope. -Seeding has not taken hold and erosion control along wetland has failed. Item Date Date No. Item Reviewed Comments Accepted -Sodding is required along CR 19 through Otsego Tool's property. Contact field inspector. Need valve extensions on all valves. West of 67`h cul de sac are 12 07/03/03 missin . 13 Hydrant at Station 14+50 on 67'h Street is missing its cap chains. 07/03/03 14 Lower valve box at CSAH 19 and 67 h Street. 07/03/03 15 Clean all manholes and valve boxes for easy access after binder 07/03/03 course. PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIME) OF THE AGREEMENT. REMARKS: Mdh/tjw c: Pete Carlson SEH Mike Czech, SEH Linda Goeb, City of Albertville Tim Guimont, City of Albertville X:XAE\ALBEVU11 I MSPECSTUNCHLIST.DOC Issued By: Title: LaTour Construction Item Date Date No. Item Reviewed Comments Accepted 14 Manholes 2 & 6 need work on adjustment rings. Lack of grout or rough. 07/03/03 15 All manhole inverts and benches can be cleaned. 07/03/03 16 Manhole 6 is leaking. 07/03/03 Televise the sewer main — may require further cleaning after 17 07/03/03 review. 18 All catch basin rings need to be grouted. 07/03/03 19 Some storm sewer lines are filled with gravel, etc. Cleaning required. Contact field inspector. 07/03/03 20 Wear course. All iron raised with casting cover adjustment rings only. 07/03/03 PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIME) OF THE AGREEMENT. 1991uG1.11 Mdh/tjw c: Pete Carlson SEH Mike Czech, SEH Linda Goeb, City of Albertville Tim Guimont, City of Albertville Don Jensen, Woodside Northridge, LLC. W:\ALBEV\0213\SPECS\PUNCHLIST-082802.DOC Issued By: Title: Meyer-Rohlin Inc. LaTour Construction OWNER CONTRACTOR SEH NO. OWNER NO. PROJECT PUNCH LIST City of Albertville (Kenco) DATE OF CURRENT ISSUE 07/03/03 LaTour Construction DATE OF ORIGINAL ISSUE 08/28/02 A-ALBEV 0213.00 SUBSTANTIAL COMPLETION FINAL COMPLETION 2002 Cedar Creek South 5`h Addition Below is a list of items which must be completed or corrected prior to final acceptance of the subject project. A completion of these items does not in any way relieve the Contractor of the responsibility to complete the project in accordance with all Contract Documents. Any questions call Russel Bly at 651.308.5462. Item Date Date No. Item Reviewed Comments Accepted 1 Hydrants need hydrant flags and wires tied 08/28/02 Hydrant at end of culdesac needs raising to grade and gate valve 2 located 08/28/02 Sanitary sewer has water in it beginning at MH2 — needs 3 pumping 08/28/02 Sanitary sewer needs flushing and cleaning 4 08/28/02 5 Catch basin 3 — mud needed around rings 08/28/02 Catch basin 2 — same 6 Hydrants need touch-up paint 08/28/02 7 Need extension rods in all valve boxes. 08/28/02 CBI needs mudd around rings. 8 08/28/02 1" step needs repair in MH2 9 08/28/02 Items Added 07/03/03 10 Hydrant 4 requires a 6" extension for grade. 07/03/03 Need valve rod extensions for all valves and raise valve boxes 11 for h drants 1 &2 for access. 07/03/03 12 Clean all manholes and valve box covers for easy access. Pick 07/03/03 holes. 13 Locate detection wire for hydrants 1 & 2. 07/03/03 Item Date Date No. Item Reviewed Comments Accepted 14 Manholes 2 & 6 need work on adjustment rings. Lack of grout 07/03/03 or rough. 15 All manhole inverts and benches can be cleaned. 07/03/03 16 Manhole 6 is leaking. 07/03/03 17 ` Televise the sewer main — may require further cleaning after 07/03/03 review. 18 All catch basin rings need to be grouted. 07/03/03 19 Some storm sewer lines are filled with gravel, etc. Cleaning 07/03/03 required. Contact field inspector. 20 Wear course. All iron raised with casting cover adjustment rings 07/03/03 only. PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIME) OF THE AGREEMENT. REMARKS: Mdh/tjw c: Pete Carlson SEH Mike Czech, SEH Linda Goeb, City of Albertville Tim Guimont, City of Albertville Don Jensen, Woodside Northridge, LLC. W: W LBE V \0213\SPECSNPUNCHLIST-082802. DOC Issued By: Title: Meyer-Rohlin Inc. LaTour Construction OWNER CONTRACTOR SEH NO. OWNER NO. PROJECT PUNCH LIST City of Albertville (Keno) DATE OF CURRENT ISSUE LaTour Construction DATE OF ORIGINAL ISSUE A-ALBEV 0213.00 SUBSTANTIAL COMPLETION FINAL COMPLETION 2002 Cedar Creek South 5`h Addition 07/03/03 08/28/02 Below is a list of items which must be completed or corrected prior to final acceptance of the subject project. A completion of these items does not in any way relieve the Contractor of the responsibility to complete the project in accordance with all Contract Documents. Any questions call Russel Bly at 651.308.5462. Item Date Date No. Item Reviewed Comments Accepted 1 Hydrants need hydrant flags and wires tied 08/28/02 Hydrant at end of culdesac needs raising to grade and gate valve 2 located 08/28/02 Sanitary sewer has water in it beginning at MH2 — needs 3 pumping 08/28/02 4 Sanitary sewer needs flushing and cleaning 08/28/02 5 Catch basin 3 — mud needed around rings Catch basin 2 — same 08/28/02 6 Hydrants need touch-up paint 08/28/02 7 Need extension rods in all valve boxes. 08/28/02 8 CBi needs mudd around rings. 08/28/02 9 ls` step needs repair in MH2 08/28/02 Items Added 07/03/03 10 Hydrant 4 requires a 6" extension for grade. 07/03/03 11 Need valve rod extensions for all valves and raise valve boxes for hydrants 1 &2 for access. 07/03/03 12 Clean all manholes and valve box covers for easy access. Pick holes. 07/03/03 13 Locate detection wire for hydrants 1 & 2. 07/03/03