Loading...
1988-03-03 Assessments :> ... '" MEYER-ROHLIN, INC. ENGINEERS-LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn. 55313 Phone 612.682-1781 March 3, 1988 City of Albertville c/o Maureen Andrews, Administrator Box 131 Albertville, MN 55301 Re: 1987-1 Improvement Project, Albertville, MN Barthel Manor 2nd Addition Assessments Honorable Mayor & City Council: We are currently preparing the assessments for Barthel Manor 2nd Addition. The assessments will cover sewer, water, and storm sewer. We have included draft assessments. With the City's approval, we will proceed with the assessment preparation using the methodology explained here. Assessments would be based on: 1. Lots 2, 3 and 4 of Block 10, Barthel Industrial Park would be assessed for the cost of the sanitary sewer from the lift station to Barthel Drive (shown on the map) . These assessments will be based on a cost-per-acre basis. Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor . , page 2 2. Lot 4, Block 10, Barthel Industrial Park would be assessed for the watermain on Barthel Drive. It would be treated as three equivalent residential lots. 3. The park would be treated as one residential lot. 4. Property 014404 would be treated as four residential lots. 5. Properties 014402, 014403, and 014401 would not be assessed. 6. Lot 3, Block 9, Barthel Industrial Park would be treated as one residential lot. 7. Lot 6, Block 8, Barthel Industrial Park would not be assessed. 8. Lots 7, 8 and 9, Block 8, Barthel Industrial Park would be assessed. 9. The residential lots and equivalent residential lots will pay for the remainder of the costs (after the cost of the sanitary sewer in the industrial area is deducted) on an equal basis. 10. The total project cost is $250,000. This is the amount of the bonds. This amount would be assessed. , , page 3 Using the above methodology, we have made the following calculations: Cost of Sanitary Sewer in Industrial Area Cost of Sanitary Sewer in Residential Area Sewer Services Watermain Water Services Storm Sewer 22,767.47 86,252.31 8,357.58 95,124.30 8,742.33 28,756.08 250,000.07 Industrial Assessments - Sanitary Sewer Lot 2, Block 10 3.21 acre Lot 3, Block 10 2.95 acre Lot 4, Block 10 4.99 acre 11.15 acre Lot 2: 3.21 x 22,767.47 11.15 Lot 3: 2.95 x 22,767.47 11.15 Lot 4: 4.99 x 22,767.47 11.15 = 6554.58 = 6023.68 = 10,189.21 Industrial Assessments - Watermain 3 95,124.30 x 30 Lot 4: = 9,512.43 page 4 Total Assessments - Industrial Area Lot 2, Block 10 6554.58 Lot 3, Block 10 6,023.68 Lot 4, Block 10* 19,701.64 *This lot is in a low area and it may not be possible to completely develop it. Residential Area - per lot Watermain 95,124.30 30 = 3170.81 Water Service 8,742.33 27 = 323.79 Sanitary Sewer 86,252.31 27 = 3194.53 Sewer Service 8,357.58 27 = 309.54 Storm Sewer 28,756.08 27 = 1065.04 Total Assessment 8,063.71 Assessment for property 014404: 4 x 8,063.71 = 32,254.84 If you have any questions, do not hesitate to call. Sincerely, MEYER-ROHLIN, INC. c:u~ Bob Sullentrop Professional Engineer sl File: 870l-C