Environmental Assessment Worksheet (EA W)
NOTE TO PREPARERS
This worksheet is to be completed by the Responsible Governmental Unit (RGU) or its agents. The project proposer must supply
any reasonably accessible data necessary for the worksheet, but is not to complete the final worksheet i1:self. If a complete answer
does not fit in the space allotted, attach additional sheets as necessary.
For assistance with this worksheet contact the Minnesota Environmental Quality Board (EQB) at (612) 296-8253 or (toll-free)
1-800-652-9747 (ask operator for the EQB environmental review program) or consult "HAW Guidelines," a booklet available from the EQB.
NOTE TO REVIEWERS
Comments must be submitted to the RGU (see item 3) during the SO-day comment period following notice of the' EA W in the EQB
Monitor. (Contact the RGU or the EQB to learn when the comment period ends.) Comments should address the accuracy and
completeness of the information, potential impacts that may warrant further investigation, and the need for an EIS. If the EA W has
been prepared for the seoping of an EIS (see item 4), comments should address the accuracy and completeness of the information
and suggest issues for investigation in the EIS. .
1. ProJectTltle Cedar Creek
2. Proposer Pilot Lan~. Development
Cnntact person Donald Jensen'
Address 13736 NE Johnson Street
Ham Lake, MN 55304
612-757-4052
3. RGU
City of Albertville
.
Garrison Hale
City Administrator
5975 Main Ave. NE
Albertville, MN 55301
612-497-3384
) ,
Contact person
and title
Address
Phone
Phone
4. Reason for EAW Preparatlon
o EIS seoping IX! mandatory EA W 0 citizen petition tJ RGU discretion 0 Proposer volunteered
If EAW or EIS is mandatory give EQB rule category number(s) 4410 .4300 Susp 19
5. ProJect Locatlon
1/4 goo 1/4 Section ~ I)
County Wriqht
Attach copies of each of the following to the EA W:
a. a county map showing the genera1location of the project; .
b. copyCies) of USGS 7.s minute, 1:24,000 scale map (photocopy is OK) indicating the project boundaries;
C. a site plan showing all significant project and natural features.
d. land use plan e wetlandm~t~g~tion..plan
6. Description Give a complete description of Ute proposea projeCt and ancillary facilities (attach additional sheets as necessary).
Emphasize construction and operation methods and features that will cause physical manipulation of the environment or
produce wastes. Indicate the timing and duration of construction activities.
Township
121 Range 24 & NW~ 2-120-24
CitylTwp Albertville
.,'
See attached
Provide a 50 or fewer word abstract for use in EQB Monitor notice:
1
. "J. ,.
. 7.
ProJect Magnltu~. Data
Total Project Area (acres)
Number of Residential Units
Unattached 1 7 1
271.4
or Length (miles)
Attached 74
Commercial / Industrial / Institutional Building Area (gross floor space)
Total 8000 square feet;
Indicate area of specific uses:
Office qolf clubhouse
Retail
Warehouse
L~~fudwrtri& maintenance building
Other Commercial (specify)
Building Height(s) two-st.ory C] llhhOlJAP
8. Permits and Approvals RequIred List all known local, state, and federal permits, approvals, and funding required:
Unit of Government Type of Application Status
Wright Soil & Water District Wetland Mitigation Permit To be acquired
Dept. Natural Resources Wetland Mitigation Permit To be acquired
Army Corps of Engineers Wetland Mitigation Permit To be acquired
MN Pollution Control Agency Gen. Stormwater Discharge Permit "
MN Pollution Control Agency San~tary Sewer Extension Permit "
Joint Powers Water Board Watermain Extensibn "
MN Dept. of Health Watermain Extension "
City of Albertville Final Plat "
Wright County Final Plat "
City of Albertville Street & utility Improve. Proj. "
9. Land Use Describe current and recent past land llse and development on the site and on adjacent lands. Discuss the
compatibility of the project with adjacent and nearby land uses; indicate whether any potential conflicts involve enviIomnental
. matters. Identify any potential envU'onmental ~ due to past land uses, such as soil contamination or abandoned storage
tanks. :
Manufacturing
Other Industrial
Institutional
Agrlc:ultura.I
See attached
.of
10. Cover Types Estimate the acreage of the site with each of the following cover types before and after development (before and
after totals should be equal): !
Urban/Suburban Lawn
Landscaping
Impervious Surface
Other (describe) 0 .'
Agricultural Ditches 3.5 0
Golf Course Landscape 0 107.6
11. FIsh, WIldlife, and Ecologically SensItive R8$Our~s TOT AL = 2 71 .4 271 .4
a. Describe fish and wildlife resources on or near the site and discuss how they would be affected by the project. Describe any
measures to be taken to minimize or avoid adverse impacts.
Types 2 to 8 Wetlands
Wooded/Forest
Brush/Grassland
Cropland
Before
36.0
23.0
A 7
196.2
After
39.4
] q _ 0
? 7
Before
o
4.0
After
89.4
13.3
Q
See attached
b. Are there any state-listed endangered, threatened, or specla1-<:oncern species; rare plant communities; colonial waterbird
nesting colonies; native prairie or other rare habitat; or other sensitive ecological resources on or near the site? 0 Yes I8l No
If yes, describe the resource and how it would be affected by the project. Indicate if a site survey of the resources was
conducted. Describe measures to be taken to minimize or avoid adverse impacts.
See attached
2
'.
12. Physlcsllmpacts on Water R880urcaa Will the project involve the physical or hydrologic alteration (dredging, filling, stream diversion,
outfall structure, c!fidng, Impoundment) of any surface water (lake, pond, wetland, s!:ream. draiz).age ditcl\)? 2. Yes 0 No
If yes, identify the water resource to be affected and describe: the alteration, including the construction process; volumes of
dredged or fill material; area affected; length of stream diversion; water surface area affected; timing and extent of fluctuations
in water surface elevations; spoils disposal sites; and proposed mitigation measures to minimize impact~.
See attached
13. Water Use
a. Will the project involve the installation or abandonment of any wells? IliI Yej;: D No
For abandoned wells give the location and Unique well number. For new wells, or other previously unpermitted wells, give
the location and purpose of the well and the Unique well number (if known).
See attached
b. Will the project require an appropriation of ground or surface water (including dewatering)? ex Yes 0 No
If yes, indica~ the source, quantity, duration, purpose of the appropriation, and DNR water appropriation permit number of
any existing appropriation. Discuss the impact of the appropriation on ground water levels.
Se,e attached
C. Will the project require connection to a public water supply? C.i Yes 0 No
If yes, identify the supply, the DNR water appropriation permit number of the supply, and tl}e quantity to be used.
See attached
14. Water-related Land Use Management Districts Does any part of the project site involve a shoreland zoning district:. a delineated 1CJO.year
flood plain, or a state or federally designated wild or scenic: river land use district? 0 Yes m No
If yes, identify the district and ~s the compatibility of the project with the land use restrictions of the district.
...;'
15. Water Surface Use Will the project change the number or type of watercraft: on any water body? 0 Yes ~ No
If yes, indicate the current and projected watercraft usage and discuss any potential overcrowding or conflicts with other users
or fish and wildlife resources.
16. Solis Approximate depth (in feet) to:
Ground water: minimum 0 average 10-15 Bedrock: minimum N/A average N/A
Describe the soils on the site, giving SCS classifications, if known. (SCS interpretations and soil boring logs need !!.Q! be attached.)
Dundas and Ames Silt Loams
Hayden "Loams
Nessel Silt Loams
Glencoe Silty Clay Loams
Cordova and Webster Silty Clay Loams
17. Erosion and SedImentation Give the acreage to be graded or excavated and the cubic yards of soil to be moved:
acres 224.5; cubicyards 250,000 .
Describe any steep slopes or highly erodible soils and identify them on the site map.
Describe the erosion and sedimentation measures to be used during ,and after construction of the project.
See attached
3
19. Water Quallty'~ Surface Wa_ Runoff
a. Compare the quantity and quality of site runoff before and after the project. Describe methods to be used to manage and/or
treat runoff.
See attached
b. Identify the route(s) and receiving water bodies for runoff from the site. Estimate the impact of the runoff on the quality of
the receiving waters. (If the runoff'1lWY affrd a lake consult MEA W GuideIi7lt:S" about whether a nutrient budget anilysis is needed.)
See attached
19. Water Quality. WastllWaters.
a. Describe sources, quantities, and composition (except for normal domestic sewage) of all sanitary and industrial wastewaters
produced or treated at the site.
See attached
b. Describe any waste treatment methods to be used and give estimates of composition after treatment, or if the project
inyolves on-site sewage systems, discuss the suitability of the site conditions for such systems. Identify receiving waters
(ii1.cluding groUi.ldwater) and estimate the impact of the~arge cn,the qQality of the receiving waters. (If the disduZrge .
'1IWY affect a lake consult ":cAW Guidelines" about whether a nutrient bud~ fbflZlysis is ~.)
See attached
C. If wastes will be disch.arged into a sewer system or pretreatment system, identify the system and discuss the ability of the
system to accept the volume and composition of the wastes. Identify any improvements which will be necessary.
See attached'
20. Ground Water - Potential for Contamination
a. Approximate depth (in feet) to ground water: 0 minimum; 1 0 -15 average.
b. Descnbe any of the following site hazards to ground water and also identify them on the site map: sinkholes; shallow
limestone formations/karst conditions; soils with high infiltration rates; abandoned or unused wells. Describe measures to
avoid or minimize environmental problems due to any of these hazards...,
See attached
C. Identify any toxic or hazardous materials to be used or present on the project site and identify measures to be used to
prevent them from contaminating ground water.
See attached
21. Solid Wastes; Hazardous Wastes; Storage Tanks
a. Describe the types~ amounts, and compositions of solid or hazardous wastes to be generated, including animal manures,
sludges and ashes; Identify the method and location of disposal. For projects generating municipal solid waste indicate if
there will be a source separation plan; list type(s) and how the project will be modified to allow recycling.
See attached
b. Indicate the number, location, size, and use of any above or below ground tanks to be used for storage of petroleum
products or other materials (except water).
See attached
,f
22. Traffic Parking spaces added 160 Existing spaces (if project involves expansion) 0 Estimated total Average
Daily Traffic (ADD generated 2 /44 Estimated maximum peak hour traffic generated (if known) and its timing: .
. For each affected road indicate the ADT and the directional distribution of traffic with and without the project.
Provide an estimate of the impact on traffic congestion on the affected roads and describe any traffic improvements which will
be necessary.
The ADT estimate was achieved by assuming 10 trips per household per
day: 245 lots x 10 trips + 12% = 2744
Parking spaces noted above are proposed at the golf course clubhouse
facility.
23. VehIcle-related aIr emissions Provide an estimate of the effect of the project's traffic generation on air quality, including carbon
monoxide levels. Diseuss the effect of traffic improvements or other mitigation measures on air quality impacts. (If the project
involves 500 or more parking spaces, consult "EA W Guidelint:sN about whether a detailed air quality analysis is needed.)
See attached
24. Stationary source air emissions Will the project involve any stationary sources of air emissions (such as boilers or exhaust
stacks)? 0 Yes ~ No
If yes, deseribe the sources, quantities, and composition of the emissions; the proposed air pollution coi\trol devices; the'
quantities and compQsition of the emissions after treatmentj and the effects on air quality.
,25. Will the:project generate dust, odors, or noise during Construction and/or operation? ~ Yes' 0 No
If yes, deseribe the. sources, characteristics, duration, and quantities or intensity, and any proposed measures to mitigate adverse
impacts.. Also identify the locations of sensitive receptors in the vicinity and estimate the impacts on these receptors.
See attached
26. Are any of the following resources on or in proximity to the site: '."
a. archeological, historical, or architectural resources? 0 Yes KI No
b. prime or unique farmlands? 0 Yes UNo
c. designated .parks, recreation area~r trails? 0 Yes UNo
d. scenic views and vistas? 0 Yes "EJ'No
e. other u!1.ique resources? 0 Yes KI No
If any items are answered Yes, describe the resource and identify any impacts on the resource due to the project. Describe
any measures to be taken to minimize or avoid adverse impacts.
27. Will the project create adverse visual impacts? (Examples include: glare frum intense lightsj lights '17isi'ble in wilderness areasj and large
visible plumes from cooling towers or exluzust stacks.) 0 Yes KJ No
If yes, explain.
28. Compatibility with plans Is the project subject to an adopted local comprehensive land use plan or any other applicable land u~ water,
or resource management plan of an local, regional, state, or federal agency? ag~es 0 No
If yes, identify the applicable planes), discuss the compatibility of the project with the provisions of the plan(s), and explain how
any confli~s between the project and the planes) will be resolved. If no, explain.
See attached
5
. "
'. -
29. Impact on Infrastructure and Public Services Will new or expanded utilities, roads, other infrastructure, or public services be
required to, serve the project? ~ Yes 0 No
If yes, describe the new or additional infrastructure /services needed. (Any infrastructure that is a "cannected action" with respect
to the project must be assessed in this EA Wi see MEA W Guidelintis" for ddaiIs.)
See attached
30. Related Developments; Cumulative Impacts
a. Are future stages of this development planned or likely? 0 Yes jQ{No
If yes, briefly describe future stages, their timing, and plans for environmental review.
b. Is this project a subsequent stage of an earlier project? 0 Yes D9 No
If yes, briefly describe the past development, its timing, and any past environmental review.
C. Is other development anticipated on adjacent lands or outlots? IX! Yes 0 No
If yes, briefly describe the development and its relationship to the present project.
d. If a,b, or c were marked Yes, discuss any cumulative environmental impacts resulting from this project and the other
development.
See attached
31. Other Potential Envlronmenlallmpacts If the project may cause any adverse environmental impacts which were not addressed by
items 1 to 28, identify and discuss them here, along with any proposed mitigation.
Impacts have been addressed
32. SUMMARY OF ISSUES (This section need not be completed if the EA W is being done for E1S seepingi instetzd, address relevant issues in the
draft Seeping Decision dOCll7TZ1%t which must aa:ompany the EAW.) List any impacts and issues identified above that may require
further investigation before the project is commenced. Discuss any alternatives or mitigative measures that have been or may
be considered for these impacts and issues, including those that have been or may be ordered ~ permit conditions.
Further investigation of issues identified above before the p~oject
is commenced is not deemed necessary.
\
CERTIFICATIONS BY THE RGU
notice in the EOB Monitor}
A.
(al/3 certifications must ~e signed for EOB acceptance of the E4W for publication of
I ,hereby c~t the information ~.1a..ed in ~ocument is accurate and complete to the best of my knowledge.
Signature ~ ;;:2. ..~ .'
B. I hereby certify that the project described in this EA W is the complete project and there are no other projects, project stages, or
project components, other than those deseribed in this document, which are related to the project as "connected actions" or
"phased actio~s defi~ed, respec~7~les, pts. 4410.0200, subp. 9b and subp. 60..
Slgnature~q'<jl"""'" ..:::a.. ~
C. I .hereby certifY.~pies of the c!;om let~ 'seipg~t to all points on the official EQB EAW distribution list.
Slgnature....~/lA-, ----; ,&.4_ . 9,
Titleofsigner (;-/1 ;/-PIUI' ISO,f-/'OrK Date .s~~)~ / Y7 ,
6
Mbnesou Envir.,....menul Qudity B03rd. Re"';,sed June 1990.
6. DESCRIPTION
This Project consists of developing an 18-hole golf course and residential property on a 271.4
acre parcel of property in the city of Albertville, Minnesota (the "Project"). A portion of the golf
course crosses the city corporate limits of Albertville and St. Michael (see map C).
Cedar Creek Golf Course will be an 18-hole goJf course. The golf course will be an 18-hole, par
71, regulation length golf course. The golf course will play from 5,000 yards from the front tees
to 6,200 yards from the back tees. The golf course will include a full-length practice range with .,
20-25 tee stations and a large practice putting green.
The golf course has been designed to include wetlands areas, ponds, sand bunkers and
mounding that will provide scenic, challenging and memorable golf holes. Multiple tees, large
irrigated tees, greens and fairways will insure a playable golf course that appeals to all levels of
golfers. The golf course will feature golf holes that have variety in length and challenge. It is
anticipated that because of its close proximity to the high school (1.5 miles) an improved golf
program at the high school would be possible.
The clubhouse and parking lot will be centrally located on the golf course with access off
County Road 118. The first and tenth tees, ninth and eighteenth greens, and the practice tee
and practice green will all be in close proximity to the clubhouse/parking lot.
The residential development of the project is proposed as a Planned Unit Development (PUD)
and strives to achieve a lot size of 15,000 square feet in the single family lots, which is
consistent with the zoning of the property. A total of 159 lots are over 15,000 square feet; 11
lots are less than 15,000 square feet; and the average lot size is approximately 16,700 square
feet. The PUD consists of 170 single family lots and 74 townhome units for a combined total
of 244 dwelling units. A total of 113 dwelling units are provided with golf course frontage and
another 47 dwelling units are provided with frontage to proposed park land.
The City of Albertville is included in the Joint Powers Water Board System, along with the cities
of Hanover and St. Michael. Domestic water and fire protection service will be provided to the
Project by the Joint Powers Water Board System. -::
In 1993, Albertville upgraded its municipal wastewater treatment facility, and the wastewater
from the Project will be treated at the upgraded facility through an extension of Albertville's
sanitary sewer collection system. A sanitary sewer main line installed through the Project will
be designed to accommodate the wastewater flow from adjacent properties that are expected
to be developed in the future and for which sanitary sewer service will be required. It is
estimated that approximately 200 acres to the south of the Project will ultimately be serviced
with sanitary sewer from the main lines within the Project. The timing, extent, and type of
residential development of the land area to the south of the Project is not known. However, the
utilities within the project will be designed so that subsequent extensions to the south can be
accomplished.
Construction activities for developing the Project include typical earthwork operations as
necessary for grading of streets, installation of piping for extension of the municipal water and
sanitary sewer systems, and minor earthwork operations for the development. MPCA approved
erosion control methods, such as silt fencing, will be used to mitigate potential erosior.! onto
adjacent properties or into drainage ways or wetlands. .
The timing and duration of the construction is not established. The proposer desires to
commence development of the area as expeditiously as possible. The rate of development of
the Project is dependent upon timing of approvals as well as the rate at which housing is
needed.
9. LAND USE
The majority of the existing land use is agriculture, with portions of the property existing as
wetlands. The estimated acreage of cover types before and after development are identified in
the following section. Adjacent land uses include residential and agricultural. The City
Approved Land Use Plan is attached as Map D.
The proposed development is adjacent to a recently constructed residential development within
the city of Albertville, Parkside Third Addition. The project is compatible with adjacent and
nearby land uses which consists of recent residential expansions of the city of Albertville.
Because adjacent land uses are consistent with the proposed Project, no environmentally
negative impacts are anticipated.
The majority of the 200, a'cres to the, south of the Project are also primarily agricultural with
portions of the property existing as wetlands. Future residential development of the acreage to
the south of the Project is compatible with adjacent and nearby land uses because it abuts the
northerly boundary of the City of St. Michael which currently consists of agriculture and .
residential developments. Also, the Albertville-St. Michael High School is located east of the
future residential development south of the Project. Thus, existing land uses are compatible
with the Project and surrounding areas. The rate of future development is unknown.
There are no known past land uses that would contribute, to present environmental concerns in
the Project.
.,.(
11. FISH, WILDLIFE, AND ECOLOGICALL Y SENSITIVE RESOURCES
Attached is the DNR review of ecologically sensitive resources provided for the Project EAW.
No known occurrences of rare species or natural features were found within a one mile radius of
the Project. Therefore, no conflicts are anticipated for this Project, as the total boundary of the
project is within the one mile radius.
There are no fish resources on or near the site that could be affected by the Project.
The existing land area of the Project will be developed to include only those areas that are
currently used for agricultural purposes. Wetland areas impacted by the Project will be
mitigated on site. The project proposes "wetland replacement" such that a total of
approximately 1.0 acres of wetland credits will be banked by the project proposer. This area
will be used for mitigation in future projects, if any.
...'
.
.
Minnesota Department of Natural Resources
500 Lafayette Road
51. Paul. Minnesota 55155-40_
May 27, 1997
Scott Dahlke
Professional Engineer
Meyer-Roblin, Inc.
1111 Hwy. 25 N.
Buffalo, MN 55313
Re: Cedar Creek North Residential Development, T121N, R24W, Section '35, Wright
County
Dear Mr. Dahlke:
The Minnesota Natural Heritage database has been reviewed to determine if any rare
plant or animal species or other significant natural features are known to occur within an
approximate one-mile radius of the above referenced project. Based on this review, there are
no known occurrences of rare species or natural features in the area searched.
The Natural Heritage database is maintained by the Natural Heritage Program and the
Nongame Wildlife Program, units within the Section of Ecological Services, Department of
Natural Resources. It is the most complete source of data on Minnesota's rare, endang~red, or
otherwise significant plant and animal species, plant communities, and other natural features,
and is used in fostering better understanding and protection of these rare features.
The information in the database is drawn from many parts of Minne,sota, and is
constantly being updated, but it is not based on a comprehensive survey of the state.
Therefore, there are currently many significant natural features present in the state which are
not represented by the database. We are in the process of addressing this via the Minnesota
County Biological Survey (MCBS), a county-by-county inventory of rare natural features,
which is now underway. Because survey work is in progress for Wright County, our
information about natural communities judged to be significant by our program is quite good
for that county. The MCBS survey work for rare and endangered animals and plants is less
comprehensive; it is therefore possible that occurrences of these features exist in the project
area for which we have no records. Because there has not been an on-site survey of the
biological resources of the project area, it is possible that ecologically significant features exist
for which we have no record.
DNR Information: 612-296-6157. 1-800-766-6000 . TTY: 612-296-5484, 1-800-657-3929
An E4ual Opporluni!)' Employer
Who Values Diversity
ft Prinl~c.l on R\..'"Cyd~d Pill\~r ClHll:lining. a
~~ Minimum of IU% Pusl-CunsUI11.:r Waste
Thank you for consulting us on this matter, and for your interest in minimizing impacts
on Minnesota1s rare resources. Please be aware that review by the Natural Heritage and
Nongame Research Program focuses only on rare natural features. It does not constitute
review or approval by the Department of Natural Resources as a whole. An invoice for the
work completed is enclosed. You are being billed for map and computer search and staff
scientist review.
Sincerely,
~8.~
Ellen B. Heneghan
End~gered Species Environmental Review Coordinator
Natural Heritage and Ntmgame Research Program '
612/296-8279, FAX 612/296-1811
es #970695
.,'
12. PHYSICAL IMPACTS ON WA TER RESOURCES
Physical or hydrologic alteration of surface waters outside the Project area will not occur.
Development of the residential area within the Project will be consistent with the existing
wetlands and wetland regulations. A combined total of 2,96 acres of the Type II wetland is
proposed to be filled with material native to the Project. Minor relocation of portions of existing
drainage ways within the Project area will be performed to conform with overall platting and
stormwater and water quality controls. Wetland replacement is proposed on the Project site
which is in accordance with current wetland mitigation laws. See attached Map E for the
Wetland Mitigation Plan.
Stormwater detentionlwater quality ponds will be constructed that will control storm water
outflow rates and that will be designed in accordance with applicable stormwater quality
criteria. -. The' location and size of these .facilities and the' overall, stormwater, control for the
Project will be discussed in the Water Quality-Surface Water Runoff section to the
Environmental Assessment Worksheet.
..."
, ,
13. WA TER USE
a. A well is proposed to be installed as part of the golf course maintenance facilities. The well
would function as a secondary irrigation water source only when surface water sources do not
provide adequate resources for the goJf course irrigation system. The well is proposed to be a
4" cased well with sand screen point. A well permit has not been obtained; therefore, a unique
well number is not known. The well is not proposed for domestic use.
b. Appropriation of ground or surface waters is proposed to be used only as irrigation water for
the maintenance of the golf course landscaping. An irrigation pond is proposed to be
constructed that would receive surface water from water quality ponds associated with the
Project as the main source of irrigation water. A well is proposed, as noted above, to function
as a secondary source of irrigation water and would be used only when the supply of water in
the irrigation pond is not maintail)ed by surface flows. A total of 9.5 acres of w~ter ponding is
proposed as part of the project which will promote ground water recharge. Therefore, the
appropriation of ground and surface water for irrigation purposes should not adversely affect
groundwater conditions.
Appropriation of ground or surface Waters is not anticipated during construction. The sole
exception is if minimal dewatering of perched water is required for installation of the ~sanitary
sewer collection system. The determination of whether any dewatering is even needed, or to
the extent it may be needed, is dependent on whether water bearing seams: are encquntered
during installation of the utilities. Dewatering during construction, if any, should not affect
groundwater conditions, but will only affect perched water during the period of construction.
c. The Project will receive water for domestic and fire protection purposes from the Joint
Powers Water System for Albertville, St. Michael and Hanover. The DNR Water Appropriate is
Permit Number for the supply 146359 and 455787. Estimated daily water consumption for the
Project upon its completion is approximately 65,900 gallons per day using an av.erage of 2.7
persons per residential unit and a flow rate of 1 00 gallons per capita p~r day for water
consumption. :
17. EROSION AND SEDIMENTATION
Grading of streets, lots, and golf course within the Project will be performed. Grading outside of
street rights-of-way will be performed as necessary, in order to develop lots and building pad
elevations consistent with drainage design criteria. The developer's intent is to perform as little
grading as possible for the Project and to perform only that grading which is necessary for home
construction, golf course design, and drainage purposes.
Erosion control by the use of silt fences will be used to preclude erosion into downstream water
ways or wetland areas. The Project does not contain steep slopes that will require additional
erosion control measures. All erosion control during construction will be performed in
accordance with the City and MPCA's requirements that include the measures identified above.
Detention/water quality ponds will be in place during and after construction that will serve as
detention ponds for stormwater purposes as well as sedimentation basins for stormwater runoff
prior to stormwater entering the existing wetlands and County Ditch No.9. The: sedimentation
basins and stormwater runoff will be further discussed in the following section.
_..f
18. WATER QUALITY - SURFACE WATER RUNOFF
a & b. The quantity. of runoff from the developed Project will not increase the rate of discharge
to downstream water courses nor will the quality of stormwater be adversely affected. This
estimate is based on standard runoff parameters for the soil cover conditions that presently
exist on the property, and the soil cover conditions and impervious areas that are expected to
exist at the time the"Project is fully completed. The quality of stormwater runoff is expected to
improve during and after construction due to the installation of detention/water quality ponds.
The stormwater for a majority of the Project will ultimately discharge into County Ditch No. 9
(see Map "C") that is located on the east edge of the Project and flows to the south. Water
from County Ditch No.9 eventually flows to the Crow River. Stormwater from the Project will
enter detention/water quality ponds prior to being discharged at controlled rates to County Ditch
No.9. The design of detention/water quality ponds proposes to reduce the rate of discharge to
one-half the pre-development discharge rate. Typical designs reduce the discharge rate to equal
the pre-development discharge rate. The Project design calls for larger ponds to be constructed
to achieve the' one-half predevelopment discharge rate. Tllis is proposed as part of the project
in an effort to aid in reducing drainage problems downstream associated with County Ditch No.
9. None of the storm water from the Project is discharged into lakes or protected streams of
high water quality.
The rate of stormwater discharge to County Ditch No. 9 will be controlled by the
detention/water quality ponds that will store runoff during storm events and then release
stormwater at contrqlled rates. Thus, the rate of flow of stormwater to County Ditch No. 9 will
not be increased as a result of the Project. Stormwater from the Project enters the
detention/water quality ponds through storm sewer piping and overland flow.
The northerly portion of Cedar Creek (approximately 27 acres) adjacent to County Road 37
drains to the north ttlrough county and state highway ditches, as well as natural drainage ways
to School Lake. The majority ,of this area of Cedar Creek is proposed as outlots and designated
for multi-family residential development by the City Land Use Plan. Storm water discharge for
this area will be aqdressed at the time of development of the outlots. The timing of this
potential development and how it may be staged is not known.
Regarding storm water quality, the Project will not degrade stormwater quality when compared
to existing conditions. At the present time, a substantial percentage of the existing area is
utilized for crops and agricultural purposes. As such, runoff from the existing agricultural
property contains typical nutrients such as phosphorous and nitrogen that exist in fertilizers and
agricultural waste. Runoff from the existing property also contains silt from erosion of crop
land. Runoff from the completed Project may contain some nutrients from lawn fertilizers, such
as those used on residential lawns and golf course landscaping, and contain some soil that may
wash off streets into the storm sewer system. The detention/wC!ter quality ponds in the Project
will, however, provide a mechanism for sedimentation of soils at:)d other foreign materials prior
to the storm water flowing into County Ditch No.9. Thus, settleable solids should be reduced
by construction of the Project. A majority of the stormwater from the Project will be routed
through a number of ponds incorporated into the golf course design which will provide
additional treatment and detention benefits. Therefore, the long term quality of stormwater
runoff to County DitchNo. 9 is expected to be improved.
19. WA TER QUALITY - WASTEWA TERS
a. The residential area of the Project will generate approximately 73,220 gallons of domestic
wastewater per day based on an average of 3.2 persons per residential living unit and a flow
rate of 100 gallons per capita per day. The wastewater generated by the Project will not
include any industrial contributions. The developable land to the south is expected to generate
similar residential flows once developed.
b. & c. Albertville upgraded and expanded its wastewater treatment facility in 1993. All
necessary hearings were conducted and permits and approvals obtained from the MPCA for the
upgrade and expansion of the Albertville wastewater treatment system. The wastewater
treatment facility, as it currently exists, consists of a pond system that provides secondary
treatment prior to tertiary treatment to remove phosphorous before discharge to Mud Lake. The
organic treatment capability of the facility can be expanded by incorporation of air, if needed,
into the pond treatment system. The existing wastewater treatment facility is designed to
treat 315,000 gallons per day with a CBOD loading pf 368 pounds per d~y. The wastewater
treatment facility averages approximately '184,000 gallons per day (gpd), using available flow
.. 'data, over a 12-month time period (April 1996 - April 1997). Higher than average flows
occurred during May and June, averaging 200,000 gpd. Therefore, excess capacity of
approximately 115;000 gpd currently exists throughout the year without any modification to
the existing wastewater treatment facility. The attached sheet details a breakdown of flow
quantities using existing flow quantities, approved residential plats, and proposed residential
plats. Phasing of the proposed residential plats is considered in calculating potential flow
quantities. An upgrade of the waste water treatment facility may be required to provide for
residential development proposed for 1999 construction.
The wastewater treatment facility is designed in such a manner that it can easily be modified to
treat significantly higher flows and organic loadings. It is estimated that the wastewater
treatment facility can be increased to treat an average daily flow of 1,373,000 gallons per day
with a CBOD loading of 2,380 pounds per day, with modifications to meet higher standards.
These designs are on file with the MPCA for the original treatment facility permit. Thus,
Albertville's wastewater treatment facility has the capability to be easily modified for f~ture
wastewater flows and loadings from areas outside the Project.
19. WA TER QUALITY - WASTEWA TERS {Continued}
Albertville Sanitary Sewer Flow Review:
Existing average daily flow (4/96 - 4/97)
Existing maximum flow (6/96)
184,000 gpd
200,000 gpd
Potential flow from platted-unconstructed residential units using 100 gallons per person.
(approximate unconstructed units as of 4/97) SF = Single Family MF = Multi Family
Recorded Plat
Parkside 3rd Add.
Parkside 4th Add.
Fairfield
Cottages of Albertville
Unconstructed
Units
85 SF
17 SF
21 SF
80 MF
Persons
Per Unit
3.2
3.2
3.2
2.0
Flow
27,200 gpd
5,400 gpd
5,400 gpd
16,000 gpd
, .
55,360 gpd
Platted-unconstructed flow =
Total platted-unconstructed and existing maximum flow = 255,360 gpd
Potential flow from proposed plat residential units using 100 gallons per person.
Proposed plats are the Project (Cedar Creek) and Center Oaks. Phase-year denotes the phase
number and proposed year for start of construction. Full absorption is typically 25 dwelling
units per project per year. Both developments are proposed to be constructed in phases. The
table below denotes a total of proposed units for each phase.
Proposed Persons Summation
Phase-Year -Units Per Unit Flow of Total Flow
1-1 998 110 SF 3.2 35,200 290;560
11-1999 48 MF 2.5 1 2,000 302,560
77 SF 3.2 24,640 327,200
111-2000 69 SF 3.2 22,080 349,280
IV-2001 26 MF 2.5 6,500 355,780
23 SF 3.2 7,360 363,140
Summary:
Sanitary sewer flow may reach design capacity of Wastewater Treatment Facility in 1999. An
upgrade of the Wastewater Treatment Facility may be required during the 1999 phase year.
Conclusion is that Phase II and Phase III plats may have limitations imposed by the city in regard
to number of occupancy permits allowed until actual flow data is verified to allow more
connections or additional capacity measures are under construction at the Wastewater
Treatment Facility.
20. GROUNDWA TER-POTENTlAL FOR CONTAMINA TION
b. The potential for groundwater contamination is not a concern. The property to be developed
does not contain any known special geologic/land form features that would be of a special
concern regarding potential groundwater contamination. Further, the development is residential
and will be totally serviced by Albertville's municipal wastewater collection system.
c. Because the Project is residential, no toxic or hazardous materials will be generated from the
Project.
_..f
21. SOLID WASTE! HAZARDOUS WASTEI STORAGE TANKS
a. Because the Project is a residential development, no hazardous wastes will be generated
from the Project. Municipal waste will be generated from the Project and this waste will be
collected and either disposed of or recycled in accordance with requirements the City of
Albertville has for garbage pick-up and recycling.
Construction of the Project will generate waste that is typical of residential home construction.
Solid waste from these construction activities will be disposed of in accordance with applicable
requirements. Licensed demolition landfill facilities are available in the area for disposal of
construction materials.
b. Petroleum products may be stored in the golf course maintenance facility for the servicing of
maintenance equipment. It is anticipated that product storage will be above ground and
accessible ~o golf course maintenance workers only. ,
During construction of the Project, it is expected that mobile fuel tanks will be on the property
for the purpose of providing fuel for construction equipment. No permanent above- or below-
ground tanks, other than noted above, are expected to exist after construction of the Project.
.,.f
23. VEHICLE-RELA TED AIR EMISSIONS
Based on the traffic data obtained from Question No. 22, and the fact tHat there is no reason to
expect traffic congestion due to the Project, the Project will not cause any significant decrease
in air quality due to vehicle-related air emissions.
...r
25. DUST/ ODORS/ NOISE
During construction of the Project, dust may be generated as a result of grading, utility
installation and street construction. The significance of any dust will be minimal and can be
mitigated by the use of water trucks, if needed, during construction of the streets. Once the
streets are paved, dust should not be a factor. The City requires that the streets be paved prior
to occupancy; therefore, dust generation should not be an issue after street paving is complete.
Further, park acreage and open areas are directly adjacent to the project and provide buffer
areas during construction.
Strong or potential odors will not exist during construction or after project completion.
Noise generation will be typical of that for grading, utility installation, street construction, and
home building. Major noise sources such as blasting will not occur. Especially sensitive
receptors such as hospitals, etc., are not located in the vicinity of the Project.
...,
28. COMPATIBILITY WITH PLANS
The residential portion of the Project is in conformance with the City Comprehensive Land Use
Plan, dated June 17, 1996. The Jand use designated for this property is low density residential.
There is no conflict between the proposed Project and the City Comprehensive Plan for the
residential portion. The golf course will be considered a commercial operation and as such will
require a Comprehensive Plan and Zoning Map amendment.
..,'
29. IMPACT ON INFRASTRUCTURE AND PUBLIC SERVICES
As stated in prior sections, sanitary sewer and water utilities will be extended to serve the
Project. The sanitary sewer servicing the Project will be designed to accommodate acreage in
Albertville that is located south of the Project.
County Road 11 8 is proposed to be upgraded by Wright County. The existing road is a two
lane paved rural section road with granular shoulders. The road is proposed to be upgraded to
County State Aid Highway requirements and would be a two lane paved rural section road with
paved shoulders. The proposed upgrade will include: Regrading of the road, minor elevation and
alignment adjustments, increase the structural section, and provide 8 foot paved shoulders on
both sides of the road. Right turn lanes are proposed to be added where necessary as
determined by the Wright County Higl}way Department. The road upgrade is included as part of
the Wright County Highway Department5-Year Transportation Improvement Plan. Constru.c'tion
is estimated to begin on the road upgrade in 1999.
The road upgrade is not considered a "connected action" with respect to the Project. The road
upgrade is proposed to proceed regardless of the Project development schedule or phasing.
..J
30. RELA TED DEVELOPMENT/ CUMULA T1VE IMPACTS
a. It is anticipated that the area to the south of the Project that is located in Albertville
(approximately 200 acres) will someday be developed for residential use. The timing of this
potential development and how it may be staged is not known. The potential for development
of this area is being considered at this time so that utility extensions into the Project can be
designed to accommodate future development.
b. This Project is not a subsequent phase of an earlier project.
c. Development of adjacent land along the southeast border, Center Oaks, is proposed to be a
single-family residential development. Center Oaks is proposed as a Planned Unit Development
(PUD) and strives to achieve a lot size of 15,000 square feet for single family lots, which is
consistent with the zoning of the property. A total of 1 08 lots are over 1 5,000 square feet; 5
lots are less than "15,000 square feet; and the average lot size is 16, 739 square feet. As it is
adjacent to the Cedar Creek Golf Course, Center Oaks will have 17 dwelling units with golf
course frontage. Another 12 dwelling units are provided with frontage to proposed park land
within the Center Oaks development. An outlot of the Center Oaks project is proposed to be
incorporated into the golf course design as area for the fairway and green of Hole 12. Center
Oaks i~ proposed to be developed by others and an EA W has been prepared and sent out for
review in August 1997.
Development of bordering land to the northeast, Fairfield, is proposed to be a single-family
residential development. Fairfield is proposed with a minimum lot size of 15,000 square feet,
which is consistent with the zoning of the property. The development is proposed to have both
single-family residential units and multiple-family residential units. Utilities to serve the
development are proposed to be extended from existing developments to the east. Phase I of
the development is being constructed in 1 997 (see map C).
..'
Three outlots are proposed on the north portion of Cedar Creek. The city Land Use Plan has
designated the area of the outlots to be used for multi-family residential development.
Property adjacent to the north of Cedar Creek, along County Road 37, is designated for
industrial development. Multi-family development of the outlots of Cedar Creek will provide a
transition zone from the industrial area to single-family residential development. The timing of
this potential development and how it may be staged is not known.
d. Future development of other areas will be required to meet all city standards in place at the
time of development. Because the remaining area to the south in Albertville is relatively small,
cumulative environmental impact of this Project and all future development to the south, even if
full residential development occurs, is negligible. The existing utilities have the capacity to
accommodate future development, and a: major county highway runs adjacent to the property
which may provide access. Future devel,opment in Albertville to the south of the Project will
simply abut against the northerly city limits of St. Michael, which currently consists of
residential development.
..
t
WRIGHT COUNTY
MINNESOTA
~~
~
4-~'1'
.S5--(6
>-
...
;Z
::>
o
u
o
u
Z
!!
;:::
...f
""'...-:r.:c2S......::=;
,R~ew,
11.21.,
CARVER
II
R.n.. ,
COUNTY i
Me LEOD
MIDLAND ATLAS COMPANY, INC.
MILSANK. SOUTH DAKOTA
~~. 19\10" KidIMoI At'" """""". lne.
Map A
ST. MICHAEL QUADRANGLE
MINNESOTA
7.5 MINUTE SERIES (TOPo.ORAPHIC)
NW/4 ROCKFORD 15' QUADRANOLE
'45
I
I'~",
I,r"
....-
.... .:.~;-~~~'
o
"".
.-/f'Q.'
II
.11
11
::0
",,:,
. ~~
T S lIE
..;::.............
"'-~
~
,-
'~o
.'. ". 1
".
I ........
I "
I '.
, ,~
" co
,-,.
o
1975
. '
"
",
'--..
,";0
, c
f'\
n
''1l
"
"
,
~!!! II
Ill/IIi !i 11
4 it 13
n---l '"
~I 'li~o I ;' r ~~'
;rmJ ,,~-:- ~ ~
II I~;-'i I <
--J fY - #,1 rr-; 1.I.l ~
Lf El · J.: "-.> '-.J
(~i~)\ f j!1l1~ "';;r~ ;,~'
\ ' . .~ .. I - - ....,hH . .,Id. ,7," "(:., "o! tJ.Ii P r
. t' --I .' ' ;;;;".Jt/,' .
\, ~._ ;'_..'F..,' , ~,:.k 'py R" ' "" '-"
, ,."" -' ' '" <-I::' '.'" "!'! ')>' ',\P',"
,_-::::'~,<\ ..., \.......... ~l "<...'k.)
__I" :..J. I ).'<...1 I I- : W;'J.: ~j ,-" -' "
r- ' ~- 4 .,,, '.. ' ..
. _ \ ",j-"":..J', 'sU'" ~i ' ..
/I ~ \' ~'>I!' 'I.'::K'\~' ·
0: \7 I-l. \ ,,- . .
J. ,. . ,~~flD''''''' "- ~, r
.. ' t \ ,(Ny ...,~(, . ~~ -"~ -
'-' ' , ='/K:,~ ,~'j- ~.-
_ '" _ .., ' >-.' 'If:< >i:Ef.F." ' .~ " 0""
~~@j . - "',.....,
r ~ -I "..' ='-~ ,c,' "
. ")I J(;....'" .,;;' ~:",,'" - "" ' , '
_ U' V'." ' ',.", ~.. ~/-~ .
," ", '. . y ': .F~'" ~ ."'" ~ ., .~,
-J:J\t~~--" ": X;' '1~ rr;~"~" .YJ l!~ ,,a;:; lJ. \ ~
~O "f'- ~,C :. ',. :' :;, , '';'' '':;, '~. ,~'II ~~j "" ,.1\
_: (;I,," '. "" "I< 80,,""0 ,~' ;;:;' ",' \
, A '->.L.LI. ~ ~ . .' . ;11~~ 'I "/ All '
" ':_ .,,_~,,~ ' " ,,,,y V 1" ,,'/-J ·
:-II ~.~~. "." ,,\' :;1 1<<:,10/ 'u..../- -4 '
'. ' ~.,_. "I"J~' ,,"- " ·
,_/ ';1" ~l" "'0/,'1. 6" (! /.---- \
I/~~'__" d k 'iElll/ n-''''' ~(.....rom '''''''-
I' ': ',' t. ....f!{JiV / ,>" '-lL. t.:i. ~,,~ '
I . ~ I ,~~ -/ l' v,' _...L ,-,,';(C~:U "
',\ ~""1'7117:' \.\~,I' ,.) ~, ,If' ,/ · % J ""',' ,..,;~,;\ \
, . ....>> ' , N/ J f ~' '\ \"" ·
'..., ,,' d: W )'~{ '-;' ~ ~" '''''';';':':/\ ,II
,___,," ~ h. :.. .... I ~ ......... V..." \1:
........ ," /' ' ,,'
(:t I .. ;/ I \.: ,-", 'I'
\U,. I ~".! ;. 1'1. I -^ -,-----,/ .1
<:;...)......., ; .. t f" .. .. ·
I \ ....., ~
I t n
0'93~J..Q 4--1
' - ":ili>'f'I";)~W
..1-5>
~
q:
~'
ffi
J..:
CI) "-
01
~ i
~
&
~
Q
()
I
~
t
lit
~
<C
.~
Co.
~
()
\5
Ijj
~
G
1-
). "
:t
~
iil
~~h
~~I~
i~!~
~~IE ~
~~ I
-,.- --] ""
.......
..J
I
U
a.'
~
..~'
PROPOSED LAND USE PLAN (adopted 17 June 1996)
0 Agricultural' Rural ~ Industrial . I'.' Primary Street
...[J Low Density Residential [ill Public & Semi-Public Aligrlments
'. Shared
~ ~ Park & Open Space Private Drives
... ,," Medium Density Residential
....1.
. High Density Residential' 5J Future Park & Open Space
G Commercial D Lakes & Wetlands
..'
, .'
G
~
~ g
f- ~
G ~
If
a!
~
~
J tu
tu
~~ .J
4
g
~ ~I ~
IlJ
V1~ If
~I <i
c
il
~ L
,
N~
o 1000 2000
~
SCALE IN FEET
CITY OF ALBERTVILLE
MAY 1996
COMPREHENSIVE PLAN
DEVELOPMENT FRAMEWORK
Map 0
~
oq::
~ 'b
~ ~
~, ~
~ ~
~ o~
~. (.) ~
::e lA..~
-,..l C "-
~ & c~ I
'lP (!) III I
" \.. '" C)
~ i1i~
~ ~~
t.... Q:
~ ~
~ ~
~ u
\.)
~
~
-^.
Iii
~ I
.
!I
II I
,~ H II i
~ RU II~: RI~ . ~ ,"
i:! ~bf ~: ~ iij:ii~u
~
p~ loll !!I!
!. IOUl
i I~ I~ Ii ~ml
).
~
~
~t
0", ~'"
J-,'" I'"
~h "l ~!!il it ~
Q:Olll ~v;~ si :.1: ~
i~!h ill! 111l.dlf~ li jiml!
l:l~!~ !t:~~~ I ~
~'l~ ~K ~ ~
. r' t '1, ~ · ,
~~ ~
;11111
! ~! U!!
I ill!!l n !I!l
i I n H ~~ig
I ~ Uijill~
i I II ~
nnn Ig
....~ ~
,
h
. it:
~li
1:1
I
J ;1 ~ .11,1
ill U l!i.
III ~
~
~
~ ; mmiiiiiii ~ ............ I 1- I
~ I..mmrm I.
.. ' .
~ . innl
~ t..,.n
~ ; """"'" i dll! II i
9 ~~l~'iii ~ii~iiij,~ u- Illg I
mmmi'iin mm..=",,~R ~~III II I
.....1
m
-'lill\:'lI\:111
~Q 5PS
I.