2001-11-08 Punch List r PUNCH LIST OWNER City of Albertville CONTRACTOR C.W. Houle, Inc. SEH NO. OWNER NO. PROJECT A-ALBEV 0102.00 N/A DATE OF CURRENT ISSUE DATE OF ORIGINAL ISSUE SUBSTANTIAL COMPLETION FINAL COMPLETION 11/08/01 11/08/01 2000 Cedar Creek North 3rd Addition, Albertville, MN Below is a list of items which must be completed or corrected prior to final acceptance of the subject project. A completion of these items does not in any way relieve the Contractor of the responsibility to complete the project in accordance with all Contract Documents. Item Date Date No. Item Reviewed Comments Accepted I Manhole # I bottom section joint leaks. 2 All manhole casting covers must be self- sealing. 3 Clean all casting seats to assure cover seal. Existing manhole tied into, and 4 manholes I & 2 have castings too high for snowplow. All hydrants need to have factory red 5 paint touchup and the detection wire affixed to the hydrant flag bolt. Wear course adjustment next year for 6 castings to be done only by the use of "CHEATER RINGS" CB adjustment rings need to be grouted 7 and drain holes for street draining prior paving must be grouted up. 8" GV box on stub must be raised 8 through blacktop for access prior to wear course. 9 10 11 PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIME) OF THE AGREEMENT. ,. r REMARKS: Issued By: Mike Czech Title: RPR mdh c: Pete Carlson,SEH Scott Hedlund,SEH Mike Czech, SEH Linda Goeb, City of Albertville Tim Guimont, City of Albertville \\SEHSC3\SCCV\ALBEV\O J 02\SPECS\PUNCH.DOC Don Jensen, Pilot Land Dev., Inc. Jon Wilczek, Meyer-Rohlin, Inc. 2