I have reviewed the above referenced plan and have the following comments:
Drawings
1. All 12-inch valves shall be butterfly valves. Revise Drawing accordingly.
2. The sanitary sewer manholes not in the centerline of a street, shall be located such that the
manhole is not in the vehicle wheel path.
3. Sheet 2: Move MH 19 10 feet south to avoid conflict with the storm sewer.
4. Sheet 3: Move MH 12 easterly approximately 5 feet to avoid conflict with the storm sewer.
5. Sheet 3: Redesign water main alignment on Karston Drive to eliminate the 45 degree bends.
6. Sheet 4: Eliminate gate valve at the temporary hydrant on 62nd Street.
7. Sheet 4: Eliminate gate valve at Station 14+05 on Karston Drive. This gate valve should be
installed in a future phase.
8. Sheet 4: Relocate services for Lot 2, Block 3 on Karston A venue to avoid conflict with the
catch basins.
9. Sheet 5: Redesign water main at intersection of Karston Avenue and 61st Street. As
proposed, the headloss through the fittings is una~ceptable.
An Affirmative Action,
Equal Opportunity Employer
,.
David Lund
June 10, 1998
Page 2
10. Sheet 5: Add a note to remind contractor the water main on 61st Street will be pressure
tested.
11. Sheet 6: Install storm sewer at approximately Station 7+15 on Karston Avenue on the lot line
west of Karston Avenue.
12. Sheet 6: A catch basin will be required in the northwest comer of the intersection of Karston
Avenue and 63rd Street. Relocate catch basin 16 to the radius of the same intersection.
Revise storm sewer from CB16 to CB 15 to RCP.
13. Sheet 7: A second catch basin will be required adjacent to CB 11.
14. Sheet 9: Reduce vertical curve at Station 38+74 to 50 feet.
15. Insulate all water main and water services that cross storm sewer.
16. Revise pavement section to the City's standard section for poor soils.
17. Indicate pedestrian trail on Drawing. Pedestrian ramps are required at all street crossings.
Locate catch basins at the PC of a radius.
Specifications
1. Name the City of Albertville and SEH as additional insured on the Contractors liability
msurance.
2. Modify Class 5 gradation specification as follows:
Sieve Size
1"
3/4"
3/8"
No.4
No. 10
No. 40
No. 200
Percent Passing
100
85-93
50-83
35-73
20-60
10-35
5-8
Please call me if you have any questions.
djg
c: Linda Goeb, City of Albertville
Mike Couri, City Attorney
Liz Stockman, City Planner
Scott Dahlke, Meyer-Rohlin, Inc.
J:\albcv\9806\corr\jn I 0.-98. wpd