Loading...
1998-06-10 Final Street and Utility Plan Review " ....saJ MEMORANDUM 113 S. FIFTH AVENUE, P.O. BOX 1717, ST. CLOUD, MN 56302-1717 320252-4740 800572-0617 320251-8760 FAX TO: David Lund City Administrator Albertville, Minnesota FROM: Peter J. Carlson, P.E. City Engineer DATE: June 10, 1998 RE: Final Street and Utility Plan Review Cedar Creek North Albertville, Minnesota SEH No. A-ALBEV 9806.00 I have reviewed the above referenced plan and have the following comments: Drawings 1. All 12-inch valves shall be butterfly valves. Revise Drawing accordingly. 2. The sanitary sewer manholes not in the centerline of a street, shall be located such that the manhole is not in the vehicle wheel path. 3. Sheet 2: Move MH 19 10 feet south to avoid conflict with the storm sewer. 4. Sheet 3: Move MH 12 easterly approximately 5 feet to avoid conflict with the storm sewer. 5. Sheet 3: Redesign water main alignment on Karston Drive to eliminate the 45 degree bends. 6. Sheet 4: Eliminate gate valve at the temporary hydrant on 62nd Street. 7. Sheet 4: Eliminate gate valve at Station 14+05 on Karston Drive. This gate valve should be installed in a future phase. 8. Sheet 4: Relocate services for Lot 2, Block 3 on Karston A venue to avoid conflict with the catch basins. 9. Sheet 5: Redesign water main at intersection of Karston Avenue and 61st Street. As proposed, the headloss through the fittings is una~ceptable. An Affirmative Action, Equal Opportunity Employer ,. David Lund June 10, 1998 Page 2 10. Sheet 5: Add a note to remind contractor the water main on 61st Street will be pressure tested. 11. Sheet 6: Install storm sewer at approximately Station 7+15 on Karston Avenue on the lot line west of Karston Avenue. 12. Sheet 6: A catch basin will be required in the northwest comer of the intersection of Karston Avenue and 63rd Street. Relocate catch basin 16 to the radius of the same intersection. Revise storm sewer from CB16 to CB 15 to RCP. 13. Sheet 7: A second catch basin will be required adjacent to CB 11. 14. Sheet 9: Reduce vertical curve at Station 38+74 to 50 feet. 15. Insulate all water main and water services that cross storm sewer. 16. Revise pavement section to the City's standard section for poor soils. 17. Indicate pedestrian trail on Drawing. Pedestrian ramps are required at all street crossings. Locate catch basins at the PC of a radius. Specifications 1. Name the City of Albertville and SEH as additional insured on the Contractors liability msurance. 2. Modify Class 5 gradation specification as follows: Sieve Size 1" 3/4" 3/8" No.4 No. 10 No. 40 No. 200 Percent Passing 100 85-93 50-83 35-73 20-60 10-35 5-8 Please call me if you have any questions. djg c: Linda Goeb, City of Albertville Mike Couri, City Attorney Liz Stockman, City Planner Scott Dahlke, Meyer-Rohlin, Inc. J:\albcv\9806\corr\jn I 0.-98. wpd