2009-02-26 Bid/Imholte ConcreteFeb 28 09 09:19a William Holthaus 7636826583 p.1
• EE9C=X.TC>N 8L M � N K , tVG•
Consulting Engineers & Surveyors
7533 Sunwood Drive NW, Suite 206 • Ramsey, MN 55303
Phone (763) 433-2851 - Fox (763) A27-0833
www.6olton-menk.com
BID FOR WORK TO BE PERFORMED
ALBERT VILLAS 6TH ADDITION SIDEWALK IMPROVMENTS
CITY OF ALBERTVILLE, MINNESOTA
BMI PROJECT NO-: R13.100766
.'r �1�
BIDDER agrees to perform all of the work described in the CONTRACT DOCUMENTS for the following unit prices:
NOTE: BIDS shall include sales tax and all applicable taxes and fees.
BIDDER must fill in unit prices in numerals, make extension for each item, and total.
ITEM
NO.
"T1
1 REMOVE CURB & GUTTER
2 REMOVE CONCRETE WALK
3 CONCRETE CURB & GUTTER, DES. B618
4 S' CONCRETE WALK
APPROX.
QUANT. UNIT
UNIT
AMOUNT
200 LF 71iiD l X 6-00• 00
1.625 SF iZ� Dc 26a5 01
200 LF % _ p : 00 3r Goo, E> Q
1,625 SF 0 20 Iaso Q Q
TOTAL AMOUNT DID: $ ry��
NOTES:
1) EXACT QUANTITIES TO BE DETERMINED IN THE FIELD.
2) BITUMINOUS PATCHING INCIDENTAL TO CURB AND GUTTER
3) BACKFILLING INCIDENTAL
4) SUSGRADE PREPARATION INCIDENTAL
5) ALL CONSTRUCTION SHALL COMPLY WITH CITY STANDARDS AND 2005 EDITION OF MNDOT SPECIFICATION
6) ALL WORK SHALL BE COMPLETED WITHIN TWO (2) WEEKS OF COMMENCEMENT
7) ALL WORK SHALL BE COMPLETED BY JULY 1, 2D09
8) BID SHALL REMAIN SUBJECT TO ACCEPTANCE FOR A MINIMUM OF 60 DAYS
Bid by.
By: p1tF/�h.��2(Q
(Signature and Title) - (Date) ~�
DESIGNING FOR A BETTER TOMORROW
Bolton & Menk is an actual opportunity employer.
FEB 28,2009 08:35A 7636826583 page 1