Loading...
2009-09-11 Concrete Test ResultsYt B AU N NTE TEC Letter of Transmittal Client: Bolton & Menk, Inc. Braun Intertec Project No: BL-09-03832 Transmittal No: 1 Date: September 11, 2009 Braun Intertec Corporation 1520 24th Avenue North St. Cloud, MN 56303 To: Adam Nafstad Bolton & Menk, Inc. 7533 Sunwood Drive Phone: 507-625-4171 Suite 206 Ramsey, MN 55303 Fax: 5076254177 Re: Castle Road Curb and Gutter, Albertvillas 6th, Albertville, MN This Transmittal is being Sent: For your approval As requested _X For your records For review Information Sent Copies Reference Numbers Comments/Clarification Concrete Tests 1 1 Transmittal List Information Sent Adam Nafstad, Bolton & Menk, Inc. Concrete Tests (1) Sent By: Laurie A Larsen Phone: (320) 253-9940 Re". &"Q 04 0 Providing engineering and environmental solutions since 1957 v BRAUN INTERTEC Compressive Strength of Concrete Cylinder Report Date: 9/8/09 LIMS WO #: 90091 l7 Test Method: ASTM C39, 4x8 Cylinder Client: Adam Nafstad Project: BL-09-03832 Bolton & Menk, Inc. Castle Road Curb and Gutter 7533 Sunwood Drive Albertvillas 6th Suite 206 Albertville, MN 55301 Ramsey, MN 55303 Field Test Conditions and Results ASTM C31* Set Number: I Mix Design: 3A32 Date Cast: 09/01/09 Supplier: Knife River Time Cast: 4:12 pm Specified Air (%): 6.5 +/- 1.5 Date Received: 09/02/09 Specified Strength (psi): 4,000 Measured Slump (in.): (ASTM C143) 3 Truck Number: 1462 Measured Air (%): (ASTM C231) 7.0 Ticket Number: 1536115 Concrete Temp. (°F): (ASTM C 1064) 76 Cylinders per Set: Cylinders Cast By: 4 Rodman, Scott W Air Temp. (°F): 75 Liquid Added On Site: None Placement Location: Paving, Curb & Gutter, Kassel Rd misc curb and gutter, and sidewalk replacement Sample Location/Notes: sidewalk north end of road Compression Test Results Field Lab Cure Test Age Max. Load Cylinder Diameter Cylinder Area Strength Fracture Capping Remarks Break Cure Sample No. Date (days) (days) (days) (pounds) (in.) (sq. in.) (psi) Type Method ** Code(s) l-1 9/8/09 1 6 7 40,480 4.01 12.63 3,210 2 N B2 * Concrete sampled in accordance with ASTM C172 **Capping Method: N = ASTM C1231, Unbonded Caps S = ASTM C617, Sulfur Caps Break Remarks: B2 The 7 day test result projects that the specified strength will likely be met at 28 days according to a typical age -strength relationship. Types of Fracture TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6 ver 1.3c Page 1 of 1 rz_<, Elstrom, Perry I approve the document Sep 08 2009