Loading...
2005-09-20 EstimateTrail Paving Larry Kruse From: Sent: To: Subject: Bob Moberg [bmoberg@sehinc.com] Tuesday, September 20,20052:31 PM Larry Kruse Albert Villas Trail Paving Larry, My estimate for design and construction engineering services related to the trail between Swamp Lake and Kassel Avenue is as follows: 1. Topographic Survey = $2900 2. Geotechnical Exploration & Laboratory Testing= $7500 3. Plans, Specs, Geotechnical Recommendations, Quantities, Estimate & Administration = $15,700 4. Wetland Delineation, Reporting & Permitting = $4800 5. Bidding = $1500 6. Construction Observation & Administration = $14,800 Total cost of all services identified is $47,200. Keep in mind that if there are wetland impacts identified, the TEP panel will require a solid explanation as to why the wetlands can't be avoided. In this case, that could be quite difficult. If the wetland impacts are allowed, either mitigation or banking would be required and would have an additional cost for the mitigation work or the banking acquisition. 1