October 18, 2000
WRIGHT COUNTY
DEPARTMENT OF HIGHWAYS
Wright County Public Works Building
1901 Highway 25 North
Bufj`alo, Minnesota 55313
Jct. T.H. 25 and C.R. 138
Telephone: (763) 682-7383
FAX.• (763) 682-7313
Mr Robert Morse
JMJ Properties, Inc.
107 Sinclair Drive
Muskegon, MI 49441
Re: Access Permit No. 0057 Service Access for Outlet Malls at Albertville
Dear Mr Morse:
WAYNE A. FINGALSON, P.E.
Highway Engineer
(763)682-7388
VIRGIL G. HAWHINS, P.E.
Assistant Highway Engineer
(763)682-7387
RICHARD E. MARQUETTE
Right of Way Agent
(763)682-7386
Our department is in receipt of your Driveway Permit Application and permit fee for the
proposed construction of an outbound service access on the northerly edge of the outlet mall
property fronting on County State Aid Highway NO. 19 in Albertville, Minnesota.
I had an opportunity to do a field inspection of the location today and offer the following
comments. The site plan submitted with the permit is in conformance with our requirements in
regards to location and dimensioning, however, it should be approved by City of Albertville
officials as well. The following items are not on the plan and need to be addressed:
1. Sign types and locations on the plans do not match the required types and locations stated in
Virgil Hawkins letter dated 9-5-00. Please revise the plan to conform to the conditions in the
letter. (Copy attached).
2. In an effort to eliminate the tendency for outbound traffic to try and turn left onto CSAH 19,
the center concrete median needs to be extended northward a minimum of 50 feet. This work
could be included with the traffic signal placement at the main mall access if the City of
Albertville can include it in their project. A letter should be addressed to Virgil Hawkins,
Assistant County Engineer in this regards. If the site contractor completes the median extension
work, a $5,000 surety bond or Letter of Credit will be required as part of the permit approval. If
the median work is completed with the traffic signal project, the bonding requirements can be
part of that project.
Equal Opportunity / Ajjirmatiue Action Employer
Pg 2 Morse Letter
10-18-00
3. The existing 15" diameter x 58 foot metal culvert under the existing construction access
should be removed and replaced with an 18" diameter x 60 foot Reinforced Concrete culvert with
tied sections and 12" of aggregate or rock bedding. This roadway will receive many heavy trucks
and will require a heavy duty culvert to withstand the traffic.
If these items can be added to the plans or agreed upon in a letter, the permit can be approved and
forwarded in a timely fashion. Please contact me at 763-682-7386 or Mr Hawkins at 763-682-
7387 with any questions or require further information.
Sincerely,
~'..u~r..--mod ~ ~~-~•~.~
Richard Marquette
Engineering Assistant
Wright County Highway Department
Enclosure; Virgil Hawkins Letter, dated 9-5-00
pc: Wayne Fingalson, Wright County Engineer
Virgil Hawkins, Assistant County Engineer
Jason McMillen, Stahl Construction Co.
Linda Goeb, Administrator, City of Albertville
Pete Carlson, SEH (St Cloud)
Todd McLouth, John Oliver & Associates