Loading...
2000-10-18 WC Dept of Hwy Access Permiti O JNT Y ~~ v ~Z i Z ~ m ~6 ~ O 7 dy X855 October 18, 2000 WRIGHT COUNTY DEPARTMENT OF HIGHWAYS Wright County Public Works Building 1901 Highway 25 North Bufj`alo, Minnesota 55313 Jct. T.H. 25 and C.R. 138 Telephone: (763) 682-7383 FAX.• (763) 682-7313 Mr Robert Morse JMJ Properties, Inc. 107 Sinclair Drive Muskegon, MI 49441 Re: Access Permit No. 0057 Service Access for Outlet Malls at Albertville Dear Mr Morse: WAYNE A. FINGALSON, P.E. Highway Engineer (763)682-7388 VIRGIL G. HAWHINS, P.E. Assistant Highway Engineer (763)682-7387 RICHARD E. MARQUETTE Right of Way Agent (763)682-7386 Our department is in receipt of your Driveway Permit Application and permit fee for the proposed construction of an outbound service access on the northerly edge of the outlet mall property fronting on County State Aid Highway NO. 19 in Albertville, Minnesota. I had an opportunity to do a field inspection of the location today and offer the following comments. The site plan submitted with the permit is in conformance with our requirements in regards to location and dimensioning, however, it should be approved by City of Albertville officials as well. The following items are not on the plan and need to be addressed: 1. Sign types and locations on the plans do not match the required types and locations stated in Virgil Hawkins letter dated 9-5-00. Please revise the plan to conform to the conditions in the letter. (Copy attached). 2. In an effort to eliminate the tendency for outbound traffic to try and turn left onto CSAH 19, the center concrete median needs to be extended northward a minimum of 50 feet. This work could be included with the traffic signal placement at the main mall access if the City of Albertville can include it in their project. A letter should be addressed to Virgil Hawkins, Assistant County Engineer in this regards. If the site contractor completes the median extension work, a $5,000 surety bond or Letter of Credit will be required as part of the permit approval. If the median work is completed with the traffic signal project, the bonding requirements can be part of that project. Equal Opportunity / Ajjirmatiue Action Employer Pg 2 Morse Letter 10-18-00 3. The existing 15" diameter x 58 foot metal culvert under the existing construction access should be removed and replaced with an 18" diameter x 60 foot Reinforced Concrete culvert with tied sections and 12" of aggregate or rock bedding. This roadway will receive many heavy trucks and will require a heavy duty culvert to withstand the traffic. If these items can be added to the plans or agreed upon in a letter, the permit can be approved and forwarded in a timely fashion. Please contact me at 763-682-7386 or Mr Hawkins at 763-682- 7387 with any questions or require further information. Sincerely, ~'..u~r..--mod ~ ~~-~•~.~ Richard Marquette Engineering Assistant Wright County Highway Department Enclosure; Virgil Hawkins Letter, dated 9-5-00 pc: Wayne Fingalson, Wright County Engineer Virgil Hawkins, Assistant County Engineer Jason McMillen, Stahl Construction Co. Linda Goeb, Administrator, City of Albertville Pete Carlson, SEH (St Cloud) Todd McLouth, John Oliver & Associates File