Loading...
2004-11-05 Utility Access Fees11/15/2004 09:27 7534972059 4 SEH MEMORa.NDUM TO: Jon Sutherland Albertville Building Official FROM: Bob Moberg, PE Aroject ll~anager DATE: November 5, 2004 RE: Mooney 2°~ Addition -Lot 1, Block 1 Multi-Tenant Building - I ] 008 61 ~` Street Utility Access Fees Albertville, Minnesota SEH No. A-ALBEVO501.00 D73 THUG rJ.: I have reviewed the floor plan and revised grading and utility plans submitted with the building permit application for the subject project. Design calculations for the proposed retaining wall must account for water pressure on the parking lot side of the wall or else a drainage system must be installed behirxd the wall to prevent the buildup of water pressure on the wall. The site plans are approved once the issue for the retainipg wall has been resolved. Thc- number of base SAC aiad WAC units for the building is calculated as follows: 6 SF of retail space / 3000 SF' per SAC unit = 3.91 SAC units _--- I o?0 3 • ~s s ~ ~~ T e calculated AC an AC fees aze $ 6 and ~~respectively. The fees zziay be iriereased or decreased once actual building use is determined and individual tenant Spares are filled. ~~97~ qzZ~ Storm sewer charges aze calculated as follows: Total Lot Size Impervious Surface Lot Type Connection Charge Quarterly Charge 63,057 SF = 1.45 Acres Greater than 66% Commercial / 1Zetsil $1101.13 $46?4 /Quarter Please call me at 651.490.2147 ifyou have questions. C: Larry' Kruse, City Administrator Chris Catlin, Howard R. Green Tina Lannes, City of Albertville nm x:~dNlb.~~n5n t oird?z~w~hrrtand ~ i as+s~ anc L~b~ /S~ --- Short Elllolt Hsnd~lckxon Inc., 3535 Vedneie Center Orlve. St. Paul. MN 551 1 0-5 1 9A SEM Is an equal opportunity employer ~ www.sYhinc.com ~ 651.x90 2000 ~ B00 J25.2055 ~ B51 t90.2i40 fax ~~ SEH MEMORANDUM TO: Jon Sutherland Albertville Building Official FROM: ~ Bob Moberg, PE Project Manager DATE: November 5, 2004 RE: Mooney 2°d Addition -Lot 1, Block 1 Multi-Tenant Building - 11008 61St Street Utility Access Fees Albertville, Minnesota SEH No. A-ALBEVO501.00 D73 I have reviewed the floor plan and revised grading and utility plans submitted with the building permit application for the subject project. Design calculations for the proposed retaining wall must account for water pressure on the parking lot side of the wall or else a drainage system must be installed behind the wall to prevent the buildup of water pressure on the wall. The site plans are approved once the issue for the retaining wall has been resolved. The number of base SAC and WAC units for the building is calculated as follows: 11,726 SF of retail space / 3000 SF per SAC unit = 3.91 SAC units The calculated SAC and WAC fees are $17,986 and $9775, respectively. The fees may be increased or decreased once actual building use is determined and individual tenant spaces are filled. Storm sewer charges are calculated as follows: Total Lot Size Impervious Surface Lot Type Connection Charge Quarterly Charge 63,057 SF = 1.45 Acres Greater than 66% Commercial /Retail $1101.13 $46.24 /Quarter Please call me at 651.490.2147 if you have questions. C: Larry Kruse, City Administrator Chris Catlin, Howard R. Green Tina Lannes, City of Albertville nm x:\ae\albev\050100\d73\sutherlmmd] 10504.doc Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-5196 SEH is an equal opportunity employer ~ www.sehinc.com ~ 651.490.2000 ~ 800.325.2055 ~ 651.490.2150 fax