Loading...
1999-04-17 Street and Utility Plan Review 04/19/99 16:29 FAX 320 253 1002 SEH.RCM ST CLOUD -;. ALBERTVILLE 14l 001 MEMORANDU.M 605 Franklin Avenue NE, P.O, Box 5it St. Cloud, MN 56302.0051 320.253.1000 aOO,346.6~l3B 320.253. ~.OI FAX ~r(): Linda Goeb City Adlninistrator ..~lbertvi11e, Minnesota FROM: Peter J. Carlson~ P .E. City Engineer DA TE: .April17, 1999 RE: Street and Utility Plan Review Cedar Creek South 3rd Addition Albertville, Minnesota SEHNo. A,.l\.LBE'V9909.00 I have revie~led the above referenced utility plan and have the following comments: 1. On Sheet 3, the sanitary sewer manholes shall be located in the center of the street. 2. On Sheet 3, the location ofMH 2 should be revised to provide 'more separation with the proposed storm sewer. 3. On Sheet 6, additiona.l drain tile is required. The drain tile should be installed 50 feet in each direction from a low point catch basin and 25 feet from the upstream direction of a mid-point catch basin. 4. Barricades are required at the end of Karstoll Court NE and Karston Circle NE. 5. On Sheet 8 the proposed bituminous trail should be 5 feet from the back of the. curb. Please call me if you have any questions, <:: J\..1ike Couri, Cit)' Attorney Liz Stockman, City Planner Sc,ott Dahlke, ~A:eyer-Rohlin, Inc. Mike Czech, SEH G:\OFF\PER3\C ARLSONI,CfJDAR3.WPD Short Elliott Hendrickson Inc. Offices located throughout the Upper Midwest ~Ve help you plan, design,. and achieve Equal Opportu n ity Employer ~5~t~:tClll i.~ l. S ~~~:r~I\'->'<~;'1.~"'.4;i3'~J': 605 Franklin Avenue NE, P.O. Box 51, St. Cloud, MN 56302-0051 320.253.1000 800.346.6138 320.253.1002 FAX TO: Linda Goeb City Administrator Albertville, Minnesota FROM: Peter J. Carlson, P .E. City Engineer DATE: April 19, 1999 RE: Street and Utility Plan Review Cedar Creek South 3rd Addition Albertville, Minnesota SEH No. A-ALBEV 9909.00 I reviewed the above referenced utility plan and have the following comments: 1. Sheet 3: Locate sanitary sewer manholes in the center of the street. 2. Sheet 3: Revise location of MH to provide more separation with the proposed storm sewer. 3. Sheet 6: Additional drain tile is required. The drain tile should be installed 50 feet in each direction from a low point catch basin and 25 feet from the upstream direction of a mid-point catch basin. 4. Barricades are required at the end of Karston Court NE and Karston Circle NE. 5. Sheet 8 the proposed bituminous trail should be 5 feet from the back of the curb. Please call if you have any questions. c: Mike Couri, City Attorney Liz Stockman, City Planner Scott Dahlke, Meyer-Rohlin, Inc. Mike Czech, SEH G:\albev\9909\corr\ap 19a-99.wpd Short Elliott Hendrickson Inc. Offices located throughout the Upper Midwest We help you plan, design, and achieve Equal Opportunity Employer