1999-04-17 Street and Utility Plan Review
04/19/99 16:29 FAX 320 253 1002
SEH.RCM ST CLOUD
-;. ALBERTVILLE
14l 001
MEMORANDU.M
605 Franklin Avenue NE, P.O, Box 5it St. Cloud, MN 56302.0051
320.253.1000
aOO,346.6~l3B
320.253. ~.OI FAX
~r():
Linda Goeb
City Adlninistrator
..~lbertvi11e, Minnesota
FROM:
Peter J. Carlson~ P .E.
City Engineer
DA TE:
.April17, 1999
RE:
Street and Utility Plan Review
Cedar Creek South 3rd Addition
Albertville, Minnesota
SEHNo. A,.l\.LBE'V9909.00
I have revie~led the above referenced utility plan and have the following comments:
1. On Sheet 3, the sanitary sewer manholes shall be located in the center of the street.
2. On Sheet 3, the location ofMH 2 should be revised to provide 'more separation with the proposed
storm sewer.
3. On Sheet 6, additiona.l drain tile is required. The drain tile should be installed 50 feet in each
direction from a low point catch basin and 25 feet from the upstream direction of a mid-point
catch basin.
4. Barricades are required at the end of Karstoll Court NE and Karston Circle NE.
5. On Sheet 8 the proposed bituminous trail should be 5 feet from the back of the. curb.
Please call me if you have any questions,
<:: J\..1ike Couri, Cit)' Attorney
Liz Stockman, City Planner
Sc,ott Dahlke, ~A:eyer-Rohlin, Inc.
Mike Czech, SEH
G:\OFF\PER3\C ARLSONI,CfJDAR3.WPD
Short Elliott Hendrickson Inc.
Offices located throughout the Upper Midwest
~Ve help you plan, design,. and achieve
Equal Opportu n ity Employer
~5~t~:tClll
i.~ l. S
~~~:r~I\'->'<~;'1.~"'.4;i3'~J':
605 Franklin Avenue NE, P.O. Box 51, St. Cloud, MN 56302-0051
320.253.1000
800.346.6138
320.253.1002 FAX
TO:
Linda Goeb
City Administrator
Albertville, Minnesota
FROM:
Peter J. Carlson, P .E.
City Engineer
DATE:
April 19, 1999
RE:
Street and Utility Plan Review
Cedar Creek South 3rd Addition
Albertville, Minnesota
SEH No. A-ALBEV 9909.00
I reviewed the above referenced utility plan and have the following comments:
1. Sheet 3: Locate sanitary sewer manholes in the center of the street.
2. Sheet 3: Revise location of MH to provide more separation with the proposed storm sewer.
3. Sheet 6: Additional drain tile is required. The drain tile should be installed 50 feet in each direction
from a low point catch basin and 25 feet from the upstream direction of a mid-point catch basin.
4. Barricades are required at the end of Karston Court NE and Karston Circle NE.
5. Sheet 8 the proposed bituminous trail should be 5 feet from the back of the curb.
Please call if you have any questions.
c: Mike Couri, City Attorney
Liz Stockman, City Planner
Scott Dahlke, Meyer-Rohlin, Inc.
Mike Czech, SEH
G:\albev\9909\corr\ap 19a-99.wpd
Short Elliott Hendrickson Inc.
Offices located throughout the Upper Midwest
We help you plan, design, and achieve
Equal Opportunity Employer