2004-10-25 Progress Meeting Minutes
City of Albertville & Edina Development Project Meeting
September 21, 2004
Name
)0; 3() 11+1
~t?7
a \.J c-K be', O.t:"l~
~-f~~ ~f hcv\
1301> lfoh:2rJ
K Wi" :Bj)
~~::J
~~ ~tV'\ \<;.c...\
~~rO~ K~~
Attendance
Comp~y
C,~
MEcA/~ t//f/~
\(U<:.d-l-.. OJ.,. 0
56'U
~el-f
~(2f1
2e;v>? i?e II /
J:.b. 1(vd.f-Sa>f4-> 1VlC.
t>~ ~~'h-ee'1'"j
KuecC/.e ~
gEt!
p~~/[q. 4-{3t.,~
P/~NHlf C",61Hf,,,/"
Phone
IsJr;2... 9'1" -<13/3
320 3~at?6'8
3~o -.39'3 -'6W!:xd
32/).z;zC;, f32L)
(05'1- lf9()- 2/t.I7
6~/- 3")~ - 5/.16;J.
7y'5-323 -,?pf'6
?b5-7&-5'..~
7b 3 -78'5"- IOLf"S
lI{J..)o - .3 '7' t5' -d t:? 8"6
~5 / .-7& S ::2<'15 f-
(;~<}I- 2C} 1- ~1~O
", 7 ""1" -~hJl
~
SEH
Progress Meeting Minutes
Subject:
Albert Villas
Albertville, Minnesota
Date of Meeting: October 25, 2004
Project Manager: Robert L. Moberg, PE
St. Paul, MN
Time of Meeting: 11 :00 A.M.
SEH No.:
A-ALBEV0212.00
Location:
Albertville City Hall
Attendees:
Larry Kruse, Albertville; Doug Muyres, Edina Development; Chuck Geislinger,
Kuechle Underground; Todd Udvig, Russ Bly, Bob Moberg, SEH
Minutes by:
Robert L. Moberg, PE
The following items were discussed at the above-referenced meeting:
I. Public Improvement Construction Punchlists
A. First Addition - punchlist work is completed.
B. 2nd Addition - punchlist work is completed.
C. 3rd Addition - curb repair and sidewalk replacement work to be finished.
D. 4th Addition - curb repair and sidewalk replacement work to be finished, as well as placement
of wear course and storm sewer cleanup.
E. Lift Station - spare parts kit has not been delivered to City, handle on cabinet door is broken.
F. 6th Addition - curb repair, sidewalk replacement, and wear course paving are to be finished.
G. Bituminous Trail- Trail to cSAH 18 to be graded and paved.
II. Storm Water Pond
A. Edina Development is questioning their responsibility for rectifying the pond issue. The
preference is to raise the pond bottom with fill material rather than reconstruct all of the storm
sewer outlets.
B. ITT has taken a sample of the fill material at the outlet mall site. Gradation results are
pending.
III. Wetland Mitigation Areas
A. Area 1M - according to Edina Development, footprint will not be modified, as property
owner is asking for too much money for additional land.
1. Property owner of Lot 7 is requesting compensation for removal of sod and irrigation
system.
2. Area has not been staked, according to Todd.
Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-5196
SEH is an equal opportunity employer I www.sehinc.com I 651.490.2000 I 800.325.2055 I 651.490.2150 fax
'"
Progress Meeting Minutes
Albert Villas, Albertville, MN
SEH No. A-ALBEV0212.00
October 25, 2004
Page 2
B. Area 2M - has been staked. Pete Carlson to meet with owner of Lot 14 when work is
scheduled.
C. Area 3M - has been partially staked.
D. Area 4M - has been staked. Owner of Lot 26 is not happy with proposed grading and wants to
be notified when work is scheduled.
E. Area 5M - has been staked. Shed to be moved by property owner. Owners of Lots 28 and 29
have indicated they will oppose the work.
F. Schedule - Edina Development to order work on areas 3M and 1M ASAP. Areas 2M, 4M and
5M to wait until freeze-up. Russ Bly to notify Doug Muyres when frost levels are sufficient to
minimize onsite damage during excavation operations of Areas 2M, 4M and 5M.
IV. Other
A. Doug Muyres to schedule and coordinate a meeting with his consultants and Todd Udvig to
discuss modifying depths of proposed excavations.
B. Doug Muyres requested the next meeting not be scheduled until Edina has made progress.