June 19, 2006
Mr. Alan R. Brixius
Northwest Associated Consultants
4800 Olson Memorial Highway
Suite 202
Golden Valley, Minnesota 55422
Larkin Hoffman Daly & Lindgren Ltd
1500 Wells Fargo Plaza
7900 Xerxes Avenue South
Minneapolis, Minnesota 55431-1194
GENERAL: 952-835-38U0
FAx: 952-896-3333
wES: www larldnhoffman.com
DELIVERED
VIA EMAIL AND
U.S MAIL
Re: Phil Morris-Written Narrative in Connection with Pending Application
for Approval of a Planned Unit Development Conditional Use Permit
and Preliminary Plat for Albertville Marketplace
Our File No. 29,264-00
Dear Alan:
This letter-memorandum constitutes the written narrative required by the City of Albertville
("City") ordinances to be submitted in connection with Phil Moms' (the "Applicant") pending
application for approval of a planned unit development conditional use permit ("PUD CUP") and
a preliminary plat ("Application") for Albertville Mazketplace ("Project"). The Project is located
on an undeveloped pazcel of land in the southeast quadrant of County Road 37 and I-94 ("Project
Site").
The following consultants have been retained by the Applicant to provide assistance in
connection with the Application:
Developer
Boulder Properties, Inc.
681 East Lake Street, Suite 262
Wayzata, MN 55391
Phone: (952) 476-4036
Fax: (952-476-7293
Email: dandan(a~boulderprop.com (Contact:
27
George Daniels)
E~(~I~BIT 1
Mr. Alan R. Brixius
June 19, 2006
Page 2
Planner/Engineer/Survey
Westwood Professional Services, Inc.
7699 Anagram Drive
Eden Prairie, MN 55344
Phone: (952) 937-5150
Fax: (952) 937-5822
Email: dale.beckmann ,westwoodps.com (Contact: Dale Beckmann}
shari.ahrensnwestwoodps.com (Contact: Shari Ahrens)
Architect
Weber Architects and Planners
2280 Watertown Road
Long Lake, MN 55356
Phone: (952) 476-4434
Fax: (952-476-5863
Email: nw~u,weberarchitects.com (Contact: Neil Weber)
Landscape Architect
Westwood Professional Services, Inc.
7699 Anagram Drive
Eden Prairie, MN 55344
Phone: (952) 937-SI50
Fax: (952} 937-5822
Contact: Dazen M. Laberee
Consulting Traffic Engineer
Westwood Professional Services, Inc.
7699 Anagram Drive
Eden Prairie, MN 55344
Phone: (952) 937-5150
Fax: (952) 937-5822
Email: allan.klugman(a,westwoodps.com (Contact: Allan Klugman)
HISTORY OF PREVIOUS COMMERCIAL DEVELOPMENT
PROPOSALS FOR THE PROJECT SITE
The Applicant purchased the Project Site about sixteen (16) years ago with the objective of
developing it for planned commercial uses consistent with the City's land use planning goals and
zoning and subdivision requirements. T'he Applicant and his representatives have been working
in good faith with City staff for over three years on various commercial development proposals.
In 2003, the Applicant and Boulder Properties proposed a planned unit development ("PUD")
28
Mr. Alan R Brixius
June 19, 2006
Page 3
commercial development of the Project Site consisting of automobile convenience, sit-down
restaurant, hotel and retail commercial uses. On August 18, 2003, the City Council approved
Boulder Properties' proposed PUD concept plan. Boulder Properties did not, however, request
City approval of a PUD CUP or a preliminary plat for the proposal.
In 2004, the Applicant and Christian Commercial brought a revised PUD concept plan to the
City for consideration. This plan included automobile convenience, fast food restaurant, office,
retail, and sit-down restaurant uses. In June 2004, Christian Commercial's revised PUD concept
plan was reviewed by the Planning Commission and City Council, but no action was taken. In
August 2004, SEH performed a traffic study of Christian Commercial's revised PUD concept
plan and further input was also received from Wright County ("County"}.
In early April, 2005, the Appficant's representatives contacted the City to request placement on
the May 3 City Development Review Committee ("DRC") agenda for the purpose of reviewing a
modified PUD development plan. On May 2, 2005, the City Council adopted Ordinance No.
2005-02, an interim ordinance establishing a moratorium on the platting of property and the
issuance of planned unit development/conditional use permit, or a planned unit development
rezoning on property within 250 feet of the entrance and exit ramps from Wright County
highways abutting Interstate 94 within the City. At the May 3, 2005 DRC meeting, City staff
informed the Applicant's representatives that Ordinance 2005-02 applied to the Project Site and
prevented the Applicant's intended application to the City for approval of a PUD CUP for
commercial development for a period of one year after the effective date of the interim
ordinance.
During the pendency of the moratorium, the Applicant assembled a new development team for
the Project, now known as Albertville Marketplace. As discussed in greater detail in a
subsequent section of this letter-memorandum, the Applicant obtained City approval of a
Minnesota Wetland Conservation Act ("WCA") wetland boundary determination and an
incidental wetland exemption for the Project Site. The Applicant's development team met
several times with City staff to obtain comments on preliminary Project development plans. On
June 13, 2006, the Applicant submitted the Application for approval of a PUD CUP and
preliminary plat for Albertville Mazketplace.
COMPREHENSIVE PLAN AND ZONING REQUIREMENTS APPLICABLE
TO THE PROPOSED PROJECT ON THE PROJECT SITE
The Project Site is designated for commercial use in the City of Albertville Comprehensive Plan
("Comprehensive Plan"). Recommendations in the Comprehensive Plan for this azea of the City
include "commercial development which is highway oriented and portrays high quality in design
and construction." The proposed Project is consistent with the Comprehensive Plan
recommendations.
29
Mr. Alan R. Brixius
June 19, 2006
Page 4
The Project Site is zoned B-3 Highway Commercial District. The purpose of the B-3 District is
to provide for "the establishment of motor vehicle oriented or dependent high intensity
commercial and service activities: ' Retail business, service business, office, personal services,
restaurant and financial institution uses are among the permitted uses in the B-3 District. A
commercial planned development is a conditional use in the B-3 District. Other uses allowed by
conditional use permit in the B-3 District include motor fuel sales, car washes, and drive-through
service lanes accessory to a B-3 permitted or conditional use. All proposed Project uses are
either permitted (retail, bank, or restaurant), or conditional (automotive convenience store with
motor fuel sales and car wash, and accessory drive-through to retail business and bank) in the
existing B-3 zoning district.
EXISTING CHARACTERISTICS OF THE PROJECT SITE
The Project Site is an unplatted, vacant parcel of land consisting of 11.97 gross acres. It is
bordered on the north by County Road 37, on the east by the Church of St. Albert Cemetery and
undeveloped upland and wetland, and on the south and west by undeveloped land and Interstate
94. The existing characteristics of the Project Site are shown on the Existing Conditions Plan
submitted as part of the Application. Although the property is undeveloped, it has been
disturbed by agricultural cultivation. It includes a small wooded area and about 4.67 acres of
wetland in the south and central portions of the Project Site.
In June 2005, Peterson Environmental Consulting, Inc. ("PEC"), subsequently acquired by the
Applicant's current consultant, Westwood Professional Services, delineated a 4.47 acre wetland
in the south portion of the Project Site. PEC also identified a 0.2 acre artificially created wetland
in the central portion of the site which qualifies for the Minnesota Wetland Conservation Act
("WCA") incidental wetland exemption. The City, as local government unit ("LGU") under the
WCA convened a technical evaluation panel ("TEP' to conduct a wetland delineation field
review on July 29, 2005. In response to TEP comments, PEC submitted additional
supplementary information to the City in October 2005. On November 16, 2005, the TEP
recommended approval of the wetland delineation and the WCA incidental wetland exemption.
On December 5, 2005, the Albertville City Council approved the wetland boundary
determination and the requested WCA incidental wetland exemption as recommended by the
TEP.
The U. S. Army Corps of Engineers ("Corps") regulates wetlands on the Project Site under
Section 404 of the Clean Water Act ("CWA"). On March 6, 2006, the Corps approved the
wetland delineation previously approved by the City Council in December 2005. The Corps
retains jurisdiction of the 0.2 acre artificially created wetland, Wetland A, in the central portion
of the Project Site, because the CWMP does not include an automatic, incidental wetland
exemption. The Corps has indicated, however, that it will be flexible in sequencing analysis and
in the required compensatory wetland mitigation ratio because of the "apparent reduced quality
of Wetland A" (March 6, 2006 correspondence from Robert J. Whiting, Chief, Regulatory
Branch to Larkin Hoffman Daly & Lindgren, Ltd.).
30
Mr. Alan R. Brixius
June 19, 2006
Page 5
The submitted Project development plans require total fill of Wetland A. This activity is exempt
from WCA regulation, but will still require issuance of a Corps permit. Based on discussion
with Corps staff, the Applicant proposes to purchase available wetland credits from the state
wetland bank to satisfy CWA wetland mitigation requirements.
DESCRIPTION OF THE PROPOSED PROJECT ON THE PROJECT SITE
Proposed Uses
Albertville Marketplace is a 30,140 square foot commercial planned development serving the
daily convenience shopping, personal service, eating, banking and motor fuel needs of azea
residents and. motorists on the surrounding roadways. Proposed uses include retail business, sit-
down restaurant, bank, and automotive convenience store. 214 parking spaces aze proposed,
including 12 accessible parking spaces at the automotive fuel dispensers. Eight proof of parking
spaces are also provided on the automobile convenience store lot adjacent to the entry roadway.
This complies fully with Zoning Ordinance provisions which require a total of 201 surface
parking spaces for the overall Project.
Real estate agreements and appropriate association documents will provide cross-access and
pazking linking the Project uses and will also provide for common maintenance of internal roads,
parking areas, landscape plantings, lighting and signage.
Site Planning
Several physical and regulatory constraints significantly affect Project layout and site planning.
As recommended by the County, the site driveway is located adjacent to the east property line to
create the maximum possible intersection spacing. The site access drive will contain two lanes
of outbound approach and will provide for a future inbound eastbound right-turn lane and an
inbound westbound left-turn lane. The northerly 75 feet of the Project Site will be dedicated to
the County for additional right-of--way to accommodate future County Road 37 improvements.
In addition, Outlot B shown on the submitted preliminary plat will contain a 34-foot wide access
road built to City standards and specifications. This street exceeds the requirements for the
proposed Project and is being designed to accommodate the future public street extension
westerly from McKenzie Avenue along the southerly boundary of the adjacent cemetery,
connecting to the access drive. The roadway encompassed within Outlot B will be maintained
by the development until such time as it is dedicated to the City for a public street. Project site
planning is further limited by the City's request for dedication of about O.I 5 acre of land on the
southeast corner of the developed site (Outlot C) for construction of a municipal sanitary sewer
lift station to serve properties to the east, as well as the proposed Project.
31
Mr. Alan R. Brixius
June 19, 2006
Page 6
In keeping with the marketplace village development concept, the proposed Project includes five
relatively small commercial buildings on four lots oriented toward the interior landscaped road
with excellent views from adjacent Interstate 94. The Project meets all B-3 setback and
dimensional requirements. No variances are proposed. About 63% of the total gross project site
acreage will be open space, including the 4.47 acre preserved wetland on Outlot A. 67.4% of
the buildable azea of the development is impervious surface; this is significantly less than the
maximum 80% impervious surface allowed in the B-3 zoning district.
Building Design and Exterior Materials
All of the commercial land uses in the proposed Project will have unifying and complementary
shapes, forms and design. As shown on the submitted Preliminary Elevations Plan, architectural
interest will be achieved by varying roof heights and use of awnings and sunscreens at individual
entries. The primary exterior materials will be brick, EIFS (stucco) and rock face block. Pre-
finished metal flashing will be used for fascia materials. The predominant exterior color palette
for the brick and EIFS will be earth tone neutrals, with colored accents utilized for the awnings,
sunscreens and pre-finished metal flashing. A colored perspective and exterior materials board
will be available at the Planning Commission and City Council meetings.
Eternal and Internal Vehicular Circulation and Traffic Operations
The Application includes an analysis of Project traffic generation and traffic circulation
characteristics prepared by the Applicant's consulting traffic engineers, Westwood Professional
Services, Inc., dated June 12, 2006 ("Westwood Traffic Analysis"). The Westwood Traffic
Analysis documents the average daily and p.m. peak hour traffic generated by the proposed
Project and compares it to traffic generated by Christian Commercial's 2004 PUD concept plan
that was reviewed by the County and SEH. The Westwood Traffic Analysis documents that the
proposed Albertville Marketplace generates about 800 fewer daily trips and about 40 fewer p.m.
peak hour trips than the 2004 PUD concept plan. Westwood therefore concludes that the traffic
analyses and fmdings from the County and City 2004 traffic studies remain valid. The
Westwood Traffic Analysis also notes that the location and conceptual design of the Project's
proposed site driveway complies with the County's 2004 traffic study recommendations.
The Project site layout has been refined to respond to City staff comments. Modifications were
made to address initial City concerns regarding the operation and stacking of the drive-through
site elements and internal truck circulation. The two retail uses, Buildings A and B, both include
a drive-through element on the west side of the building and acounter-clockwise circulation
pattern. A separation median island and appropriate signage will be located between Buildings
A and B to further delineate the location and routing of each drive-through window. The
Westwood Traffic Analysis finds that the drive-through stacking for Buildings A and B meets
the Zoning Ordinance requirement of 120 feet of stacking distance for each drive-through use.
The Westwood Traffic Analysis also finds that the automobile convenience store car wash and
32
Mr. Alan R. Brixius
June 19, 2006
Page 7
the two drive-through lanes on the south side of Building E, the proposed bank, fully comply
with the 120-foot stacking requirement.
The Westwood Traffic Analysis includes two figures which depict movement of trucks through
the Project Site using the Auto Turn program. These figures show that drive aisles, island
locations, and corner radii on the Project Site will accommodate a WB-50 semi-track. In
addition, the automobile convenience store will accommodate the larger WB-67 tanker trucks
that may need to access the fueling tanks. Westwood finds that "[w]ith the layout as designed,
trucks will be readily able to navigate and circulate through all areas of the site to reach locations
requiring service."
Proposed Landscape Framework Plan
The submitted Application includes a Preliminary Landscape Plan to demonstrate the
Applicant's intent to provide high quality screening and landscaping for Albertville Marketplace.
Overstory and ornamental trees will be planted along the County Road 37 north frontage. Shrubs
and overstory trees will be located along either side of the access road with evergreen plantings
interspersed along the east property line to screen the Project from the adjacent cemetery.
Shrubs, such as dogwood, viburnum, and juniper, will be planted along the west perimeter to
soften the retaining wall, screen pazking azeas and provide an overall attractive visual image.
Over 300 perennials, and 3,180 squaze feet of rain gazdens will be installed to create an attractive
visual environment. On-site irrigation designed by a landscape contractor will also be provided.
Grading and Drainage
Site prepazation and grading will consist of removal of existing topsoil, import of suitable soils
for building pads and parking lots, and construction of a 2 to 4 foot high retaining wall along the
west boundary and south portion of the developed Project Site. The submitted stormwater
management plan greatly improves water quality in the existing wetland, as compared to current
conditions. Presently, untreated stormwater runoff from the cultivated field flows overland in a
southerly direction and discharges directly into the existing wetland. Post-Project development
stormwater runoff will be treated prior to discharging to the wetland.
Generally, stormwater runoff from the building and parking lots will be directed to infiltration
basins and stormwater catch basin structures located within the pazking areas. Stormwater will
then flow south through a series of stormwater pipes and through an overland swale to an on-site
stonmwater treatment pond, ultimately discharging to the existing wetland. A large portion of the
stormwater runoff from the proposed pazking area between Buildings A, B and C will be directed
to one of two infiltration basins. The basins will infiltrate a specified volume of stonmwater, thus
reducing overall runoff volume. In addition, stormwater runoff from the westerly portion of the
Project Site will be directed south into a swale azea located along the north border of the wetland,
prior to discharging into the on-site detention pond. The swale area will also be designed to
33
Mr. Alan R. Brixius
June 19, 2006
Page 8
retain a specified volume of stormwater to further promote infiltration and runoff volume
reduction.
Stormwater runoff from the easterly portion of the Project Site will be directed to catch basin
structures and will flow south via storm sewer to the on-site stormwater treatment pond.
Consistent with City design standards, this stormwater pond will control the discharge rate to
that of existing conditions and will also provide water quality treatment.
Utilities
Currently, public sanitary sewer and water are stubbed to an area north of the northwest comer of
the Project Site. In order to serve the proposed Project, the public water main will be extended
south and east through the Project Site to provide service to the proposed buildings and hydrants.
The water main system will be looped as directed by the City engineer. The water main will be
stubbed-out to the easterly property line north of the wetland for future extension to serve
properties to the east.
As shown on the submitted Project plans, the City proposes to construct a sanitary sewer lift
station on 0.15 acre of land dedicated to the City in the southeast corner of the developed Project
Site. A force main will direct the sewer north and then west through the property and will then
connect to the existing public sanitary sewer system. The sanitary sewer line will be extended to
the east property line for future extension of the public sewer system.
Sanitary sewer service for Buildings C, D and E will be directed east and south to the proposed
public lift station. Sanitary sewer service for Buildings A and B will be duected north and will
connect to the existing sanitary sewer manhole.
Lighting and Signage
The submitted Application includes a Lighting and Photometric Plan which documents
compliance with City ordinance requirements. The Application also includes specification
sheets for the proposed American Series lighting. The American Series blends contemporary
architectural styling with advanced optics for superior performance in area and site lighting. The
flat lens, vertical lamp is Dark Sky certified to restrict light trespass, and glare and light pollution
for neighborhood-friendly outdoor lighting. The American Series features a decorative reveal
with computerized precision machinery. High efficiency photometric performance allows the
use of fewer fixtures and poles with wider spacings, thereby providing significant energy cost
savings.
The submitted Application also includes a preliminary signage plan. Proposed signage will meet
City code requirements. No variances are necessary. Proposed Project signage includes. two 30-
foot tall pylon signs along the west property line identifying the retail business and sit-down
34
Mr. Alan R. Brixius
June 19, 2006
Page 9
restaurant uses; a project entrance monument sign at the southwest corner of County Road 37
and the site access drive; an automobile convenience store monument at the intersection of the
site access drive and the east-west internal road; a monument sign identifying the financial
institution; and wall signage as shown on the submitted Preliminary Elevation Drawing. The
materials and colors of the monument signs will coordinate with and complement the building
materials and colors.
COMPLIANCE WITH FINDINGS FOR APPROVAL
OF PLANNED UNIT DEVELOPMENT CONDITIONAL USE PERMIT
Section 400.2(f) of the City of Albertville Zoning Ordinance enumerates the findings that the
Planning Commission and City Council must make to approve a conditional use permit for a
planned development. They aze:
(1) The proposed action has been considered in relation to the speciftc policies and
provisions of and has found to be consistent with the oj~cial City comprehensive
plan.
The Project is consistent with the commercial land use designation in the
Comprehensive Plan. The proposed Project is consistent with the Comprehensive
Plan recommendation that the Project Site include "commercial development
which is highway oriented and portrays high quality in design and construction."
(2) The proposed use is or will be compatible with present and future land uses of the
area.
With the exception of the cemetery to the east of the Project Site, the property to
the south and east is planned and zoned for future commercial development. The
Project is compatible with those future planned land uses. Additionally, the width
of the proposed site access road is oversized to meet City public road standards,
thereby accommodating future extension of a public street westerly from
McKenzie Avenue along the southern boundary of the adjacent cemetery,
connecting to the access drive. Dedication of Outlot C to the City will
accommodate construction of a public sanitary sewer lift station which will serve
planned development of properties to the east, as well as the proposed Project.
As recommended by City staff, special attention was paid to the type and location
of plantings along the east property boundary to visually separate the proposed
Project from the adjacent cemetery. Evergreen plantings, interspersed with
overstory trees, will provide yeaz-round screening and an attractive visual
environment.
(3) The proposed use conforms with all performance standards contained in the
zoning ordinance.
35
Mr. Alan R. Brixius
June 19, 2006
Page 10
The Project complies with the B-3 setback and dimensional requirements and all
other applicable Zoning Ordinance performance standazds. No variances are
required for the proposed Project.
(4) The proposed use will not tend to nor actually depreciate the area in which it is
proposed.
The proposed Project will serve the convenience shopping, personal service,
eating and automotive fuel needs of azea residents and businesses and motorists
on the surrounding highways. It will provide increased property tax revenue and
planned commercial land use consistent with the Comprehensive Plan. The
Project will have no adverse impact on property values.
(5) The proposed use can be accommodated with existing public services and will not
overburden the City service capacity.
As described throughout this letter-memorandum, existing and planned municipal
services have adequate capacity to accommodate the proposed Project. The
submitted development plans accommodate City construction of a public sanitary
sewer life station at the southeast corner of the development site. The public
water main will be stubbed-out to the easterly property line north of the existing
wetland for future extension to service properties to the east.
(6) Traj~c generated by the proposed use is within capabilities of streets serving the
property.
The existing and planned roadway system has adequate capacity to accommodate
traffic generated by the proposed Project on the Project Site. As described in the
Westwood Traffic Analysis, daily and p.m. peak hour trips generated by the
Project are less than daily and p.m. peak hour trips generated by Christian
Commercial's PUD concept plan reviewed by the County and the City's
consulting traffic engineer in 2004. Traffic volumes projected by the proposed
Project aze consistent with year 2040 traffic volumes in the Northeast Wright
County Sub-Area Transportation Study. The northerly 75 feet of the Project Site
will be dedicated to the County for future right-of--way for planned improvements
to County Road 37. Turn lanes and geometrics at the intersection of County Road
37 and the site access drive will meet County and City design standards and
specifications. The site access road will be 34 feet wide to meet City design
standazds for a future public road to be extended to the east to serve planned
future development of neighboring properties.
36
Mr. Alan R. Brixius
June 19, 2006
Page 11
In conclusion, the current Application responds to staff and County comments, conforms to
Comprehensive Plan land use goals and objectives, complies with zoning and subdivision
ordinance criteria and performance standards, and meets applicable findings for approval of a
conditional use permit for a commercial planned development.
S ~ rely,
~ti~.z~~
-`~ chit ~~
Linda H. Fisher, fvr
Larkin Hoffman Daly & Lindgren Ltd.
Direct Dial: 952-896-3210
Direct Fax: 952-842-1724
Email: lfisher(a~larkinhoi~inan.com
cc: Larry Kruse, City Admuustrator, City of Albertville
Adam Nafstad, Bolton & Menk
Phil Moms
George Daniels, Boulder Properties
Dale Beckmann, Westwood Professional Services, Inc.
Shari Ahrens, Westwood Professional Services, Inc.
Allan Klugman, Westwood Professional Services, Inc.
~oso9~s.~
37