Loading...
1996-05-10 WC Dept of Hwys Access Permits for CSAH 19.oJ~,~~Y ~~ WRIGHT COUNTY ~' ~2 DEPARTMENT OF HIGHWAYS ~ Z ~ ~ Wright County Public Works Building ~d ~ O 1901 Highway 25 North ~~, Buffalo, Minnesota 55313 7855 Jct. T.H. 25 and C.R. 138 Telephone (612)682-7383 Facsimile (612) 682-7313 May 10, 1996 Mr Phil Kinney Contract Engineer Sprint United Telephone-Minnesota 343 East 82nd Street Chaska, MN 55318--2354 Re: Access Permits for CSAH 19 Dear Mr Kinney: WAYNE A. FINGALSON, P.E. Highway Engineer 682-7388 VIRGIL G. HAWKINS, P.E. Aasiatant Highway Engineer 682-7387 RICHARD E. MARQUETTE Right of Way Agent 682-7386 Our office is in receipt of two (2) access permits for the construction of driveways to new control facilities your company is planning to install along the right of way on County State Aid Highway No. 19. 1. Your first permit application dated April 26, 1996, is for a location 678 feet south of 15th St. (Co. Rd. 146) on the east side of CSAH 19. As you may know, Wright County is an~.i.cipating an improvement project for this segment of CSAH 19 from Hanover to St Michael in 1997 and is in the preliminary design stages for this project.It will include shoulder widening, some turnlane additions and a new bituminous surfacing including paved shoulders. Our proposed right of way width for this roadway will have a minimum width of 50 feet measured from the centerline in either direction. Some areas will require 55 feet in turnlane areas to accolrmodate the clear zone requirements for a roadway of this type. Your proposal to place the cabinets for your control equipment at approximately 35 feet from centerline will not meet the requirements for the clear zone. Your cabinets should be placed a minimum of 50 feet from the centerline to insure that you will not have to relocate the facilities in a few months. If you could coordinate your utility placement with the County's project, you would insure that there wouldn't be a problem with being in the construction limits or the clear zone. I plan on starting Right of Way acquisition later this summer or early fall when the plans have been put together. You could then. acquire an easement on the outer edge of the new R/W or possibly fit your structures on the outer edge of the R/W as long as any obstacles are outside of 30 feet from the edge of the travel lane. Equal Opportunity / Affirmative Action Employer i 2. Your second permit application dated May 1, 1996, is also located on CSAH 19 about 1/4 mile north of Interstate 94 in the City of Albertville on the west side of CSAH 19. You are proposing a similar control panel at that location. For this application, it would be beneficial for you or a representative to meet with myself and Mr Gary Hale, City Administrator for the City of Albertville. The City is in the preliminary stages of approving :~ new shopping mall on the west side of CSAH 19 in the general area of your application. Mn/DOT as well may have on-off ramps to west bound I-94 in the same vicinity. This may require some widening of the CSAH R/W as well. It would be good to clarify your proposed utility placement with the City's proposal before going ahead with the installation. Please contact me at your earliest convenience to discuss the two permit applications. Sincerely, ~.c,~~~C'~ ~ Richard Marquett Right of Way Agent . Wright County Highway Department pc: Wayne Fingalson, Wright County Highway Engineer Gary Hale, Albertville City Administrator