Loading...
2000-06-15 1999 CSAH 19 ImprovementsJUN 1 6 2~C, ~. MEMORANDUM 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717 320.229.4300 800.572.0617 320.229.4301 FAX TO: Mike Couri City Attorney FROM: Peter J. Carlson, P.E. City Engineer DATE: June 15, 2000 RE: 1999 CSAH 19 Improvement Albertville, Minnesota SEH No. A-ALBEV 9905.00 14 The Contractor has provided a schedule that would complete the final paving of CSAH 19 over a 3 day period. The work would be as follows: Day 1 Fine grade shoulders in the morning and pave the shoulders in the afternoon. The Contractor would have construction signs and flaggers on site to maintain traffic flow. During this time, traffic to the mall will be able to proceed with only minor slow down in traffic. Day 2 Bituminous milling at ends of the project. This work would only take a couple of hours to complete. The Contractor would have construction signs and flaggers on site to maintain traffic. There should be no disruption to traffic flow. Day 3 Paving: This work would take most of the day. The Contractor would have construction signs and flaggers on site to maintain traffic. With the shoulders already paved, traffic will be directed to the shoulders while the inner lines are being paved. Traffic will be slow along the lane that is being paved. Traffic in other areas will be able to proceed normally. During this 3 day process, traffic flow will only be required to slow down and change lanes when necessary. Access to the mall will be maintained at all times. Please call me if you have any questions. djg c: Linda Goeb, City of Albertville Mike Czech, SEH w:\albev\9905\corr\jn lia-00-m.doc Short Elliott Hendrickson Inc. Offices located throughout the Upper Midwest Equal Opportunity Employer We help you plan, design, and achieve