Loading...
1998-07-07 Site Plan App July 7, 1998 David H. Lund City of Albertville 5975 Main Avenue NE JMJ Properties, Inc. Real Estate Development • Management ~ Consulting Alberetville, MN 55301 RE: SITE PLAN APPLICATION /ZONING REQUEST APPLICATION & FEE Minneapolis Outlet Center -Albertville, Minnesota David -Attached is the Site Plan Application along with the required back up documents / drawings and Zoning Request Application check in the amount of $1,900.00. Below is a breakdown of items attached: Site Plan Application Zoning Request Application with a $1,900.00 Check attached (12) Copies of the Site Plan (sheet C-2) (1) Complete Copy of the Civil Engineering Plans (sheets C-1 thru C-9) (1) 11" x 17" Complete Copy of the Civil Engineering Plans (sheets C-1 thru C-9) • (1}Copy Colored Elevation Drawings (12}: Copies.: of the Architectural Landscaping Plan (sheet SD-4) (1) 1 f" x-47"'=Copy of the Architectural Landscaping Plan (sheet SD=4)' (1) Copy of the Lighting and Lighting Isometric diagram. (1) Copy Colored Highway and Entry Pylon Signs (1) Copy of the Tenant Required Sign Criteria (1) Set Pictures Typical Tenant Signage /Anchor Tenant Signage /Under Canopy Signage (1) Copy of the Environmental Assessment Worksheet (EAW) Approval (1) Copy Examples of Easements for Access Pertaining to Outlots (Wendy's @ Kansas City and Arby's @ Johnson Creek, WI} We are looking forward to seeing you on July 13th, if you should have any questions or concerns prior to that meeting do not hesitate to call. Sincerely, Steven W. Smallbone Construction Manager • cc: Jim Morse Jr. 107 Sinclair Drive • Muskegon, Michigan 49441 • Phone (616) 798-4670 • Fax (616) 798-4611 1994 UNIFORM BUILDING CODE 1'A ~- TABLE 1-A-BUILDING PERMIT FEES I TOTAL VALUATION ~ ~ FEE $ l.oo co $soo.oo $22.00 $501.00 to $2,000.00 $22.00 for the first $500.00 plus S2.75 for each additional y $100.00, or fraction thereof, to and including $2,000.00 001.00 to $25,000.00 52 $63.00 for the first $2,000.00 plus $12.50 for each additional , ~ , $1,000.00, or fraction thereof, to and including $25,000.00 001.00 to 550,000.00 , $25 $352.00 for the first $25,000.00 plus $9.00 for each , additional 51,000.00, or fraction thereof, [o and including b50,000.00 001.00 to $100,000.00 $50 5580.00 for the first $50,000.00 plus $6.25 for each , additional $1,000.00, or fraction thereof, to and including i $100.000.00 001.00 to $500,000.00 S 100 $895.00 for the first S 100,000.00 plus $5.00 for each , 1 additional $1,000.00, or fraction thereof $500,001.00 to $1,000,000.00 _ $2,855.00 for the first $500,000.00 plus $4.25 for each additional SI,000.00, or fraction thereof, to and including $l,ooo.oo 000,001.00 and up $( $4,955.00 for the first $1,000,000.00 plus $2.75 for each , additions , or fraction thereof ~ Other Inspections and Fees: I. Inspections outside of normal business hours ................................... $42.W per hour* (minimum charge-two hours) 2. Reinspection fees assessed under provisions of $42.00 per hour* Section 108.8 ............................................................ 3. Inspections for which ho fee is specifically indicated ..:' .......................... $42.00 per hour* (minimum charge--one-half hour) - 4. Additional plan review required by changes, additions $42.00 per hour* or revisions to plans ....................................................... (minimum charge--one-half hour) S. For use of outside consultants for plan checking and Actual costs** inspections. or both ......................................................... 'Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. 'sActual costs ittclude administrative and ovefiead costs. • • ~ ~~ °' JMJ PROPERTIES DEVELOPMENT COS TS Charges Developer Est City Estimate City Incentive Final Dev. Cost Site Plan Review $ 5,550.00 $ 10,000.00 $ 10,000.00 $ - Subdivision/Plat Revie $ 6,200.00 $ 10,000.00 $ 10,000.00 $ - Park Dedication Fees $ 90,000.00 $ 75,000.00 $ 75,000.00 $ - Building Permit Fees $ 29,705.00 $ 35,000.00 $ 14,000.00 $ 21,000.00 Plan Review Fee $ 19,308.00 $ 22,750.00 $ 2,275.00 $ 20,475.00 Plumbing Permit Fee HVAC Permit Fee State Surcharge Fee State Inspection Fees Sanitary TAC Sanitary SAC WAC $ 12,500.00 $ $ 12,500.00 $ $ 5,000.00 $ $ - $ $ 143,402.00 $ $ 227,555.00 $ $ 200.00 $ $ 103,000.00 $ 12,500.00 $ 12,500.00 $ 5,000.00 $ - $ 84,000.00 $ 270,000.00 $ 200.00 $ 60,000.00 $ 45,564.00 $ - $ - $ - $ - $ 54,000.00 $ 135,000.00 $ 200.00 $ 30,000.00 $ 45,564.00 $ 12,500.00 12,500.00 5,000.00 30,000.00 135,000.00 30,000.00 Water Trunk Charge Storm Sewer Connectio $ 43,034.00 $ $ 697,954.00 $ 642,514.00 $ 376,039.00 $ 266,475.00 SAC, TAC &WAC FEES BASED ON 60 ACRES n U • • • ALBERTVILLE DEVELOPMENT COSTS City Char es 1. Site Plan Review 5,550.00* 2. Subdivision/Preliminary Plat Review 6,200.00* .--- 3. Park Dedication Fees 90,000.00 4. Building Permit Fee 29,705.00 5. Plan Review Fee 19,308.00 6. Plumbing Permit Fee 12,500.00 7. HVAC Permit Fee 12,500.00 8. State Surcharge Fee 5,000.00 9. State Inspection Fees To Be Determined 10. Sanitary Sewer Trunk Charges 143,402.00 11. Sanitary Sewer Access Charges 227,555.00 12. Water Access Charge 200.00 13. Water Trunk Charge 103,000.00 14. Storm Sewer Connection Fee 43,034.00 15. Costs of extending sewer, road or water To Be Determined TOTAL CITY CHARGES 697,956.00 697,956.00 Joint Water Board Charges 1. Water Access Fee 107,421.00 2. Water Meters To Be Determined 3. Water Board Plan Review (2) 9,000.00* 4. Water Board Permit Fee 85.00 TOTAL WATER BOARD CHARGES 116,506.00 116,506.00 TOTAL DEVELOPMENT COSTS $814,460.00 The foregoing Development Costs are based upon a letter from the attorney for the City dated May 12, 1998. *Includes professional fees estimated at $5,000.00. knowlton\1001-12\Agrmnts\Development Costs • • • ALBERTVILLE DEVELOPMENT COSTS City Charges 1. Site Plan Review 5,550.00* 2. Subdivision/Preliminary Plat Review 6,200.00* 3. Park Dedication Fees 90,000.00 4. Building Permit Fee 29,705.00 5. Plan Review Fee 19,308.00 6. Plumbing Permit Fee 12,500.00 7. HVAC Permit Fee 12,500.00 8. State Surcharge Fee 5,000.00 9. State Inspection Fees To Be Determined 10. Sanitary Sewer Trunk Charges 143,402.00 11. Sanitary Sewer Access Charges 227,555.00 12. Water Access Charge 200.00 13. Water Trunk Charge 103,000.00 14. Storm Sewer Connection Fee 43,034.00 15. Costs of extending sewer, road or water To Be Determined TOTAL CITY CHARGES 697,956.00 697,956.00 Joint Water Board Charges 1. Water Access Fee 107,421.00 2. Water Meters To Be Determined 3. Water Board Plan Review (2) 9,000.00* 4. Water Board Permit Fee 85.00 TOTAL WATER BOARD CHARGES 116,506.00 116,506.00 TOTAL DEVELOPMENT COSTS $814,460.00 The foregoing Development Costs are based upon a letter from the attorney for the City dated May 12, 1998. *Includes professional fees estimated at $5,000.00. knowlton\1001-12\Agrmnts\Development Costs