Loading...
2004-11-05 Spoils PileChelsea property group November 5, 2004 Mr. Alan Brixius City of Albertville 5975 Main Avenue NE P. O. Box 9 Albertville, Minnesota 55301 Dear Alan: Per our meeting and discussions, please find enclosed documentation from our Assistant General Counsel pertaining to the "spoils" pile which appears to be a required component of our wetlands mitigation plan as approved by the Army Corps of Engineers. Please don't hesitate to contact me should you need anything further regarding this. We have successfully negotiated with St. Clair's to repaint the compactors and dumpster containers with the compactors being painted first due to the pending cold weather. The containers will be painted over the winter in their shop. We are also in the process of obtaining bids for the installation of evergreen landscaping adjacent to the designated compactor and dumpster areas. We would appreciate your working with Sally Dufner to reintroduce the subject of modification to the fence as soon as possible. We propose to modify the existing fence to a finished height of 30 inches. We believe all areas of concern to both Chelsea and the City of Albertville have not been addressed, and we look forward to working with you in a positive fashion going forward. urs, Cy~gory C. Link ice President -Operations CHELSEA PROPERTY GROUP, INC. GCL:Imm Attachments cc: J. Klein D. Gugig S. Cupelli S. Dufner Chelsea Property Group Tel 973-228-6111 105 Eisenhower Parkway Fax 973-228-3891 Roseland; NJ 07068 w~.vvi.cpgi.com