2002-11-19 CC Findings of Fact & Decisioni~ 11-19-02 CITY OF ALBERTVILLE City Council Findings of Fact ~ Decision - Preliminary Plat - PUD Development Stage Approval Applicant's Name: JMJ Properties, Inc. Request: JMJ Properties, inc. is requesting Preliminary Plat approval and PUD Development Stage Plan approval for the JMJ Outlet Mall Phase III located on the parcel of land zoned B-3 in the northeast quadrant of I-94 and County Road 19. Phases I and II of the JMJ Outlet Mall have been completed. JMJ Outlet Mall Phase III is located east of Phases 1 and II of the JMJ Outlet Mall. The total site area of the proposed development is 16.46 acres {717,063 square feet). Planning Commission Meeting Date: 12 November 2002 City Council Meeting Date: 18 November 2002 Findings of Fact: Based on review of the application and evidence received, the City Council now makes the following findings of fact and recommendation: A. The legal description of the subject property is attached as Exhibit A. B. The Planning Report dated 6 November 2002 prepared by NAC, Inc. is incorporated herein. C. The memo dated November 6, 2002 prepared by S.E.H. is incorporated herein. D. The Planning Commission Recommendation for the application is incorporated herein. E. The City Council finds the preliminary plat acceptable for the platting of the 16.46 acre site as Lot 1 Block 1 Outlets at Albertville 3~d Addition including required road right-of-way. F. The Preliminary Plat of Outlets at Albertville 3~d Addition I consistent with the applicable provisions of the Albertville Zoning and Subdivision Ordinances as well as policies of the Comprehensive Plan. G. The Site and Building Plans are in substantial compliance with the Albertville Zoning Ordinance {with the conditions outlined herein). H. The lot area, setback and dimension standards which are applicable to the preliminary 3 plat have been met as illustrated on Exhibit E. Decision: Based on the foregoing considerations and applicable ordinances, the preliminary plat and PUD Development Plans for Outlets at Albertville 3`d Addition are approved based on the plans dated October 17, 2002 and information received to date, subject to the following conditions: Development Agreement 1. All conditions imposed upon approval shall be incorporated into and made part of the development agreement. Preliminary Plat 2. The applicant must dedicate land to the City of Albertville for park, playground trail and public open space or pay a park dedication `ee for the development of the proposed 16.46 acres, to be calculated by City Staff. 3. The applicant must dedicate seventy (70) feet of right of way for County Road 19 subject to the approval of the Wright County. 4. The applicant must dedicate a ten (70) foot easement for trail/streetlutilities abutting the seventy (70) foot County Road 79 right of way subject to the approval of the Wright County. (Please provide easement description) 5. The applicant must dedicate drainage and utility easements to the City of Albertville. All easements dedicated and/or given to the City of Albertville are subject to the approval of the City Engineer.(Show on final plat) PLANNED UNIT DEVELOPMENT Site Access 6. Interconnection to the properties abutting the site on the north and south must be provided consistent with the recommendations of the City Engineer as set forth in Exhibits N and O attached hereto and incorporated herein by reference. The plans must clearly illustrate extension of the primary ingress/egress drive south fo the site property line including relevant signage to accommodate access to the property abutting the site on the south property line. (Please show on site plan) The applicant must agree to enter into a cross access easement evidencing such accommodation. 7. The .applicant must revise the plans fo relocate the northern site access consistent with the recommendations of the City Engineer as set forth in Exhibit N attached hereto and incorporated herein by reference. (Please show on site plan and landscape plan). 8. The applicant must revise the plans to reflect one (1 } ingress traffic lane and two (2) egress traffic lanes for the primary access drive extending from the primary site access south to approximately to the first curb cut in the primary parking lot in consistent with the recommendations of the City Engineer as set forth in Exhibit O attached hereto and incorporated herein by reference. -Done 9. Curb cuts must be reviewed. and approved by the City Engineer. The parking lot and drive aisle access roads, design, circulation and signage are subject to the review and approval of the City Engineer, Fire Department and Wright County. -Done 4 10. All access to and from County Road 19 will be subject to review and approval of Wright County. -Done Building/Parking Lot Setbacks 11. The proposed development must meet the required setbacks for the B-3 Highway Commercial District as amended by the Shoreland Overlay District and the Wetland Systems Overlay District. -Done 12. The applicant shall implement the submitted parking design to minimize adverse impact, both visually and from a water quality perspective. -Done Pedestrian Traffic 13.The applicant shall install two (2) pedestrian crossing areas extending from the southwest parking lot across the primary access drive consistent. with the recommendation of the City Engineer as set forth in Exhibit O attached hereto and incorporated herein by reference. -Done 14. Curb cuts and pedestrian landings should be installed through the landscaped parking islands for the two (2) pedestrian crossing areas from the southwest parking lot. -Done 15. The plans must provide for installation of a sidewalk on the northern edge of the access road to Phases I and II of the JMJ Outlet Mall west of County Road 19 to complete the pedestrian corridor. -Done 96. Developer shall install pedestrian sidewalk north of intersection on to the Phase 11 building. (Please provide concept plan of side for Phase 11}. Parking 17. The applicant must demonstrate the viability of the parking stalls along the northern property line of the site and designate the same for employee parking to be enforced pursuant to the terms of the development agreement. -Done 18.The applicant shall maintain a parking ratio of not less than 5.2 stalls per 1,000 square feet of gross leasable floor area. -Done 19. Parking stall and aisle dimensions must meet the required dimensions set forth in the Albertville Zoning Code. -Done 20.Any parking lot lighting must be hooded and arranged so as to reflect away from adjoining property and public rights-of way and comply with standards set forth in Section 9000.90 of the Alberto°iHe Zoning Code. (Please provide photometric plan). 21.A perimeter curb must surround the entire parking area with a minimum five {5) foot setback from any lot line. -Done Refuse 22. The proposed screening walls for three (3) of the four (4) trash compactors must be extended to maximize screening. Staff recommends the long. wall of the proposed trash screening enclosures be extended to a length not less than seventy (70) feet for the compactors located on the northern site property line and the east side of Building E. (show on site plan) 23.A11 concrete trash pads on the plans shall be coded to coincide with the legend on fhe plans. (show on site plan) 24. The plans must clearly indicate all proposed and anticipated trash disposal facilities or containers. (show on site plan) 25.The applicant will install a chain link gate covered with screen panels (please show screen panels within Construction Details) across the entrance to the open service area for Building G consistent with the plans submitted for safety and screening purposes and to prevent customer parking within such service area. Site Grading 26. The site grading plan is subject to the review and approval of the City Engineer. - Address with Engineer 27. The applicant shall dedicate properly dimensioned drainage and utility easements to the City of Albertville, subject to the approval of the City Engineer. -Done Architectural Standards 28. The building elevations must .present aesthetic appeal and reflect continuity of architectural styling. -Done Screening/Landscaping 29. Wetland restoration proposed by the applicant is subject to the review and approval of the City Engineer. 30. The applicant shall provide additional landscaping along the northern property line of the site consisting of not less than ten (!0) trees placed between the plantings indicated on the plans to provide maximum screening from the Towne Lakes development to the north. (Please show additional landscaping as a result of the access areas) 31. The applicant shall install a fence along the western, northern and approximately 94 feet of the eastern side of the southwestern parking lot as indicated on the plans and consistent with the specifications set forth in Exhibit P attached hereto and incorporated herein by reference. -Done 32. The applicant shalt provide additional plantings within the open space adjacent fo School Lake staggered at various locations within. the sixty (60) foot designated open space area. (Revise plan to show plantings that will be moved as a result of providing access areas on the northwest and northeast corners of the development) 33. The proposed screening walls for three (3) of the four (4) trash compactors must be extended to maximize screening. Staff recommends the long wall of the proposed trash screening enclosures be extended to a length not less than seventy (70) feet for the compactors located on the northern site property line and the east side of Building E. 34.A/l concrete trash pads on the plans shall be coded to coincide with the legend on the plans. 35. The applicant will install a chain link gate covered with screen panels across the entrance to the open service area for Building G consistent with the plans submitted for safety and screening purposes and to prevent customer parking within such service area. -Done 36.An underground sprinkler system will be required to provide adequate maintenance of landscaped areas, except those to be preserved in a natural state. -Done b 37. The applicant/developer shall sod, seed, or mulch the site within thirty (30) days of building occupancy or provide an escrow deposit equal to one and one-half times the estimated cost of ground cover. -Done 38. All landscaping must be completed within one (1) year following the date of occupancy and guaranteed for two (2) full years from the time planting is completed. -Done Signage 39. The City must evaluate the Required Sign Criteria submitted for JMJ Outlet Mall Phase Ill and determine the effect of the differing standards from the Required Sign Criteria for JMJ Outlet Mall Phase t as revised November 8, 1999. (Please show sign plan and details) Lighting 40. The lighting must be recessed so bulbs are not visible and have a 90° cut-off. 41. Light standards shall not exceed thirty (30) feet (including fixtures). 42. All lighting shall be on timers to dim or shut off after normal operating hours. Please provide a photometric plan. Utilities 43.A11 utilities or construction over existing utility service lines are subject to review and approval of the City Engineer.-Done Shoreland Overlay District 44. Buildings may not exceed twenty-five (25) feet in height. -Done 45. The applicant shall maintain a forty (40) foot buffer adjacent to School Lake plus an additional sixty {60) feet of open space (total 100 feet). Passive recreational activities such as trails, picnicking, ponding, wetland replacement or plantings may occur in the sixty (60) feet of designated open space. -Done 46. The applicant shall provide additional plantings within the open space adjacent to School Lake staggered at various locations within the sixty (60) foot designated open space area. -Please provide additional landscaping as a result of the access areas. 47. The plans must be submitted to the Department of Natural Resources for review and comment. Wetland Systems Overlay District 48.The plans must clearly identify the "edge" of the wetland in accordance with the provisions of the Albertville Zoning Code. -Done 49.The applicant must submit an application for conditional use permit and a wetland systems impact plan setting forth proposed provision for sediment control, water management, maintenance of landscaped features, and any additional matters intended to improve or maintain the quality of the environment. -Done 50. Subject to Fire Department review and comments. -Done 7 11-19-02 CITY OF ALBERTVILLE City Council Findings of Fact & Decision - Preliminary Plat -PUD Development Stage Approval Applicant's Name: JMJ Properties, Inc. Request: JMJ Properties, Inc. is requesting Preliminary Plat approval and PUD Development Stage Plan approval for the JMJ Outlet Mall Phase III located on the parcel of land zoned B-3 in the northeast quadrant of I-94 and County Road 19. Phases I and II of the JMJ Outlet Mall have been completed. JMJ Outlet Mall Phase III is located east of Phases I and II of the JMJ Outlet Mall. The total site area of the proposed development is 16.46 acres (717,063 square feet). Planning Commission Meeting Date: 12 November 2002 City Council Meeting Date: 18 November 2002 Findings of Fact: Based on review of the application and evidence received, the City Council now makes the following findings of fact and recommendation: A. The legal description of the subject property is attached as Exhibit A. B. The Planning Report dated 6 November 2002 prepared by NAC, Inc. is incorporated herein. C. The memo dated November 6, 2002 prepared by S.E.H. is incorporated herein. D. The Planning Commission Recommendation for the application is incorporated herein. E. The City Council finds the preliminary plat acceptable for the platting of the 16.46 acre site as Lot 1 Block 1 Outlets at Albertville 3~d Addition including required road right-of- way. Fo The Preliminary Plat of Outlets at Albertville 3~d Addition I consistent with the applicable provisions of the Albertville Zoning and Subdivision Ordinances as well as policies of the Comprehensive Plan. G. The Site and Building Plans are in substantial compliance with the Albertville Zoning Ordinance (with the conditions outlined herein). H. The lot area, setback and dimension standards which are applicable to the preliminary plat have been met as illustrated on Exhibit E. 1 Outlets at Albertville 3~d Addition Recommended Findings of Fact Decision: Based on the foregoing considerations and applicable ordinances, the preliminary plat and PUD Development Plans for Outlets at Albertville 3rd Addition are approved based on the plans dated October 17, 2002 and information received to date, subject to the following conditions: Development Agreement 1. All conditions imposed upon approval shall be incorporated into and made part of the development agreement. Preliminary Plat 2. The applicant must dedicate land to the City of Albertville for park, playground trail and public open space or pay a park dedication fee for the development of the proposed 16.46 acres, to be calculated by City Staff. 3. The applicant must dedicate seventy (70) feet of right of way for County Road 19 subject to the approval of the Wright County. 4. The applicant must dedicate a ten (10) foot easement for trail/street/utilities abutting the seventy (70) foot County Road 19 right of way subject to the approval of the Wright County. 5. The applicant must dedicate drainage and utility easements to the City of Albertville. All easements dedicated and/or given to the City of Albertville are subject to the approval of the City Engineer. PLANNED UNIT DEVELOPMENT Site Access 6. Interconnection to the properties abutting the site on the north and south must be provided consistent with the recommendations of the City Engineer as set forth in Exhibits N and O attached hereto and incorporated herein by reference. The plans must clearly illustrate extension of the primary ingress/egress drive south to the site property line including relevant signage to accommodate access to the property abutting the site on the south property line. The applicant must agree to enter into a cross access easement evidencing such accommodation. 7. The applicant must revise the plans to relocate the northern site access consistent with the recommendations of the City Engineer as set forth in Exhibit N attached hereto and incorporated herein by reference. 8. The applicant must revise the plans to reflect one (1) ingress traffic lane and two (2) egress traffic lanes for the primary access drive extending from the primary site access south to approximately to the first curb cut in the primary parking lot in consistent with the recommendations of the City Engineer as set forth in Exhibit O attached hereto and incorporated herein by reference. 9. Curb cuts must be reviewed and approved by the City Engineer. The parking lot and drive aisle access roads, design, circulation and signage are subject to the review and approval of the City Engineer, Fire Department and Wright County. 10.A11 access to and from County Road 19 will be subject to review and approval of Wright County. 2 Outlets at Albertville 3`d Addition Recommended Findings of Fact Building/Parking Lot Setbacks 11.The proposed development must meet the required setbacks for the B-3 Highway Commercial District as amended by the Shoreland Overlay District and the Wetland Systems Overlay District. 12. The applicant shall implement the submitted parking design to minimize adverse impact, both visually and from a water quality perspective. Pedestrian Traffic 13.The applicant shall install two (2) pedestrian crossing areas extending from the southwest parking lot. across the primary access drive consistent with the recommendation of the City Engineer as set forth in Exhibit O attached hereto and incorporated herein by reference. 14. Curb cuts and pedestrian landings should be installed through the landscaped parking islands for the two (2) pedestrian crossing areas from the southwest parking lot. 15.The plans must provide for installation of a sidewalk on the northern edge of the access road to Phases I and II of the JMJ Outlet Mall west of County Road 19 to complete the pedestrian corridor. 16. Developer shall install pedestrian sidewalk north of intersection on to the Phase I I building. Parking 17.The applicant must demonstrate the viability of the parking stalls along the northern property line of the site and designate the same for employee parking to be enforced pursuant to the terms of the development agreement. 18. The applicant shall maintain a parking ratio of not less than 5.2 stalls per 1,000 square feet of gross leasable floor area. 19. Parking stall and aisle dimensions must meet the required dimensions set forth in the Albertville Zoning Code. 20.Any parking lot lighting must be hooded and arranged so as to reflect away from adjoining property and public rights-of-way and comply with standards set forth in Section 1000.10 of the Albertville Zoning Code. 21.A perimeter curb must surround the entire parking area with a minimum five (5) foot setback from any lot line. Refuse 22. The proposed screening walls for three (3) of the four (4) trash compactors must be extended to maximize screening. Staff recommends the long wall of the proposed trash screening enclosures be extended to a length not less than seventy (70) feet for the compactors located on the northern site property line and the east side of Building E. 23. All concrete trash pads on the plans shall be coded to coincide with the legend on the plans. 24.The plans must clearly indicate all proposed and anticipated trash disposal facilities or containers. 25. The applicant will install a chain link gate covered with screen panels across the entrance to the open service area for Building G consistent with the plans submitted 3 Outlets at Albertville 3~d Addition Recommended Findings of Fact for safety and screening purposes and to prevent customer parking within such service area. Site Grading 26.The site grading plan is subject to the review and approval of the City Engineer. 27.The applicant shall dedicate properly dimensioned drainage and utility easements to the City of Albertville, subject to the approval of the City Engineer. Architectural Standards 28.The building elevations must present aesthetic appeal and reflect continuity of architectural styling. Screening/Landscaping 29. Wetland restoration proposed by the applicant is subject to the review and approval of the City Engineer. 30.The applicant shall provide additional landscaping along the northern property line of the site consisting of not less than ten (10) trees placed between the plantings indicated on the plans to provide maximum screening from the Towne Lakes development to the north. 31. The applicant shall install a fence along the western, northern and approximately 94 feet of the eastern side of the southwestern parking lot as indicated on the plans and consistent with the specifications set forth in Exhibit P attached hereto and incorporated herein by reference. 32.The applicant shall provide additional plantings within the open space adjacent to School Lake staggered at various locations within the sixty (60) foot designated open space area. 33.The proposed screening walls for three (3) of the four (4) trash compactors must be extended to maximize screening. Staff recommends the long wall of the proposed trash screening enclosures be extended to a length not less than seventy (70) feet for the compactors located on the northern site property line and the east side of Building E. 34.AI1 concrete trash pads on the plans shall be coded to coincide with the legend on the plans. 35. The applicant will install a chain link gate covered with screen panels across the entrance to the open service area for Building G consistent with the plans submitted for safety and screening purposes and to prevent customer parking within such service area. 36.An underground sprinkler system will be required to provide adequate maintenance of landscaped areas, except those to be preserved in a natural state. 37.The applicant/developer shall sod, seed, or mulch the site within thirty (30) days of building occupancy or provide an escrow deposit equal to one and one-half times the estimated cost of ground cover. 38.A11 landscaping must be completed within one (1) year following the date of occupancy and guaranteed for two (2) full years from the time planting is completed. Signage 4 Outlets at Albertville 3`d Addition Recommended Findings of Fact 39.The City must evaluate the Required Sign Criteria submitted for JMJ Outlet Mall Phase III and determine the effect of the differing standards from the Required Sign Criteria for JMJ Outlet Mall Phase I as revised November 3, 1999. Lighting 40.The lighting must be recessed so bulbs are not visible and have a 90° cut-off. 41. Light standards shall not exceed thirty (30) feet (including fixtures). 42.A11 lighting shall be on timers to dim or shut off after normal operating hours. Utilities 43.A11 utilities or construction over existing utility service lines are subject to review and approval of the City Engineer. Shoreland Overlay District 44. Buildings may not exceed twenty-five (25) feet in height. 45.The applicant shall maintain a forty (40) foot buffer adjacent to School Lake plus an additional sixty (60) feet of open space (total 100 feet). Passive recreational activities such as trails, picnicking, ponding, wetland replacement or plantings may occur in the sixty (60) feet of designated open space. 46.The applicant shall provide additional plantings within the open space adjacent to School Lake staggered at various locations within the sixty (60) foot designated open space area. 47.The plans must be submitted to the Department of Natural Resources for review and comment. Wetland Systems Overlay District 48.The plans must clearly identify the "edge" of the wetland in accordance with the provisions of the Albertville Zoning Code. 49.The applicant must submit an application for conditional use permit and a wetland systems impact plan setting forth proposed provision for sediment control, water management, maintenance of landscaped features, and any additional matters intended to improve or maintain the quality of the environment. 50. Subject to Fire Department review and comments. 5 Outlets at Albertville 3~d Addition Recommended Findings of Fact EXHIBIT A LEGAL DESCRIPTION PARCEL 1 The North 246.55 feet of Government Lot 6, Section 36, Township 121, Range 24, Wright County, Minnesota. PARCEL 2: The South 273.12 feet of the North 519.67 feet of Government Lot 6, Section 36, Township 121, Range 24, Wright County, Minnesota. PARCEL 3: That part of Government Lot 6, Section 36, Township 121, Range 24, lying South of the North 519.67 feet and North of the following described line: Commencing at the Northwest corner of said Government Lot 6; thence South along the West line of said Government Lot 6, 814.01 feet to the beginning of the line to be described; thence Easterly deflecting 104 degrees 10 minutes 44 seconds left, 150.59 feet; thence Easterly deflecting 20 degrees 03 minutes 01 seconds right, 59.53 feet; thence Southeasterly deflecting 27 degrees 43 minutes 20 seconds left, 237.88 feet; thence Southeasterly deflecting 11 degrees 26 minutes 04 second left, 117 feet, more or less, to the shoreline of School Lake and terminating thereat. Legal Description from Preliminary Plat (Sheet 1 of 3) prepared by John Oliver & Associates, Inc. dated September 10, 2002. 7 EXHIBIT A Outlets at Albertville 3`d Addition Recommended Findings of Fact Adopted by the Albertville City Council this 18th day of November 2002. City of Albertville A. f r ,. c+-...W By. J Attest: Scott Wallace, Mayor /, ~. . , y. , - Linda Goeb, City Administrator pc: Linda Goeb, Mike Couri, and Pete Carlson. g Outlets at Albertville 3~d Addition Recommended Findings of Fact