Loading...
2004-12-13 Mud Lake Water Main Crossing f j} f``. 'i ~ f f .l ~ `4w ~4w.- ~~ SEH MEMORANDUM TO: Larry Kruse Albertville City Administrator FROM: Robert L. Moberg, PE Project Manager DATE: December 13, 2004 RE: Mud Lake Water Main Crossing -Albertville, Minnesota SEH No. P-ALBEV0508.00 This memorandum serves as a letter proposal for professional services related to designing a water main crossing of Mud Lake. The crossing is necessary to serve the proposed Hunter's Pass Estates development which is anticipated to proceed with construction in 2005. The crossing of Mud Lake would be made to interconnect the proposed development with the Towne Lakes development. Our proposed scope of services will include: 1. Topographic survey on the west side of Mud Lake. 2. Geotechnical investigation of the proposed crossing route. Soil borings will be taken in late January 2005 when ice thickness is at maximum depth. Soil borings will be performed by Braun Intertec. 3. Preparation of a geotechnical report based on results of the soil borings. 4. Selection of alignment, profile, and construction method for the crossing. 5. Preparation of final plans and specifications for construction. We anticipate the Hunter's Pass Estates developer will incorporate the plans and specifications for the water main crossing into their bidding documents and that construction will be done as a single project. We propose to provide the services identified herein for a maximum not-to-exceed amount of $19,200. This amount includes $7,015 for geotechnical work by Braun Intertec. Our services will be provided on an hourly basis at our standard billing rates, including reimbursable expenses. If you are in agreement with the contents of this memorandum, please sign both copies of the document and return one to SEH. Robert L. Moberg, PE PrincipaUProject Manager Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-5196 SEH is an equal opportunity employer ~ www.sehinc.com ~ 651.490.2000 ~ 800.325.2055 ~ 651.490.2150 fax