2000-07-11 Sanitary Sewer and Water Main Calculations
ArSeJ
1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717 320.229.4300
320.229.4301 FAX
"
architecture
engineering
environmental
transportation
July 11, 2000
RE: Albertville, Minnesota
2000 Kollville Estates
SEH No. A-ALBEV 0003.00 14
Scott Dahlke
Project Manager
Quality Site Design
3600 Holly Lane North, Suite#100
Plymouth, MN 55447
Dear Scott:
From our discussion yesterday, the Kollville Estates project is subject to trunk sanitary sewer and
water main access charges, which are $1,400 per acre and $1,000 per acre, respectively. This
calculates out to $52,800 for 22 acres, which is the area of the project. There is a credit for the
oversizing costs involved with the construction of the trunk sanitary sewer and water mains. This
credit is based on the following calculations:
Sanitary sewer:
$ 51FT
$100/FT
$ 45/EA
$ 7/LF
$465/EA
$ 95/EA
for sanitary sewer main
for extra depth manhole
for pve wyes
for water main
for gate valves
for water main fittings
Water main:
The resulting credit is $31,127, based on:
· Length of the trunk sanitary sewer
· Number of 12"x4"wyes
· Length of trunk water mains
· Number of trunk gate valves and fittings.
Short Elliott Hendrickson Inc.
Offices located throughout the Upper Midwest
m help you plan, design, and achieve.
Equal Opportunity Employer
...
Scott Dahlke
July 11, 2000
Page 2
The difference between the access charges and the credit is $21,673. This amount should be
included inthe developer's agreement as payable to the eity by the developer. Please call me if you
have any questions.
Sincerely,
tJ~e~
Wayne Stafi?"
Project Engineer
djg
c: Pete Carlson, SEH
Linda Goeb, eity of Albertville
Michael eouri, eouri & MacArthur
Ralph Munsterteiger, Leuer-Munstertieger Properties
W:lalbevI0003lcorrljlll a-OO-Ldoc