Loading...
1999-12-06 Planning Report PLANNING REPORT TO: Albertville Mayor and City Council Albertville Planning Commission FROM: Deb Garross DATE: 6 December 1999 RE: Albertville - Leuer-Munsterteiger PUD - Schematic Plan Review II FILE: 163.06 - 99.17 BACKGROUND Meyer-Rohlin, Inc. has submitted plans for the development of a townhome PUD for the northern 22 acres of an approximate 65-acre parcel of land, located south of 65th Street (CSAH 37) and east of Karston Cove. The northern part of the property is zoned R-5, Medium Density Multiple Family and guided for Medium Density Residential land use by the Comprehensive Plan. The southern part of the property is zoned and guided as R- 1A, Low Density Single Family. The applicant provided the Planning Commission with a schematic plan at the November 9, 1999 meeting. Following the meeting, formal PUD and preliminary plat applications were filed. During the staff review of the project two major issues associated with this project arose: 1. The configuration and amount of land that the City desires for completion of Winter Park. 2. The need to provide a PUD plan over the entire 65-acre site. These two issues require resolution by the City prior to further processing of this application. The development of this infill site including street circulation and parks impact the ultimate design of the 22 acre, R-5 zoned parcel that the applicant desires to plat. The issues are such that City staff recommends that the entire 65-acre piece be planned at this time. The Subdivision Ordinance supports the master planning of areas that are under the same ownership (i.e. one tax parcel status). A decision by the City as to the amount and configuration of park land desired for Winter Park is needed at this time as it will impact the street alignment of Kahl Avenue and potentially the number and layout of lots within both the R-5 and R-1A portions of the site. RECOMMENDA liON EXHIBIT H The decisions concerning implementation of the Albertville Comprehensive Park & Trail System Plan is viewed as a policy decision to be made by the City Council. It is suggested that the City require the maximum amount of land dedication for this property to accommodate active recreational facilities as identified by the Plan. To that end, the following are recommended: 1. A Schematic PUD Plan covering the entire tax parcel (consisting of the combined 22-acre R-5 and 43-acre R-1A zoned areas), shall be submitted as part of the PUD/preliminary plat application. (Although the underlying parcel contains two zoning classifications, the entire site is under one tax parcel and is therefore one parcel of record. As such, the entire property should be planned as part of the PUD. The southern (R-1A) part of the parcel may be platted as an outlot at the time of final plat). 2. The park dedication for the project should include land to provide for a 3D-stall parking lot to connect to the 3D-stall parking lot area required within the plat of Karston Cove. 3. A total land dedication of (1 D% or 6.5 acres of flat, open land of a size and shape to accommodate ball fields, hockey/ice skating rinks, picnic shelter(s) and soccer field(s) should be dedicated east of, and contiguous to the existing parks within Karston Cove and Cedar Creek North. 4. To provide for a community park with a gross area of 18 acres (12 of those acres being dedicated to development of active recreational facilities), the City will need to acquire about 2 additional acres of land above the 1 D% land dedication for the underlying parcel. (The 12-acre land area for active recreation is pursuant to the Comprehensive Park & Trail System plan for Winter Park). A decision from the City as to whether it intends to purchase additional lands is needed in order for the developer to design the PUD and preliminary plat accordingly. DISCUSSION The applicant has submitted a PUD and preliminary plat application for the northern 22 acres of a 65-acre piece of property. The current application considers only the R-5 zoned part of the underlying parcel. The majority of the underlying property is zoned R- 1A. See the attached Zoning Map for reference to the subject site. The entire 65-acre piece of land is surrounded by the plats of Karston Cove, Cedar Creek North, Summerfield Addition and Westwind PUD. Development of this parcel will consist of infill development, which will need to be designed to fit with the road, utility and park infrastructure in place within the adjacent neighborhoods. The Subdivision Ordinance specifies: "A preliminary plat shall contain the entire tax parcel to be platted plus all of the owner's contiguous lands unless such lands are subject to a Planned Unit Development or the City Planner and City Engineer agree to EXHIBIT H waive such requirement. The final plat may cover only a portion of the preliminary plat, provided it is in conformance with the approved preliminary plat, development contract and other requirements of the Ordinance." In order to assure that proposed infrastructure will be consistent with existing facilities, the application for PUD should encompass the entire 65-acre parcel, not just the area zoned R-5. The Albertville Comprehensive Park & Trail System Plan, previous concept plans and land dedications from adjacent plats, indicate the desire of the City to acquire sufficient land to develop a community park in this part of Albertville. A community park as described in the Park Plan includes active recreation activities such as basketball courts, hockey rink/ice skating, playgrounds and picnic shelter with onsite parking facilities and restrooms. Excerpts from the Park Comprehensive Plan which discuss Winter Park are attached as Exhibit D. Concept Plans for this area of the community which were developed prior to the Comprehensive Park and Trail System Plan also identify a land area of about 13 acres for a community park. See attached Exhibit F for reference to the 1996 approved concept plan for Summerfield Addition. The road access locations to the subject site are, for the most fart, established in that connections to 64th Street (within the plat of Karston Cove), 62n Street (within the plats of Westwind PUD and Cedar Creek North), and to Kahl Avenue (within the plat of Summerfield Addition) are already established. In addition, Wright County has established the location where access will be permitted from 65th Street (CSAH 37). At issue is the internal road system with respect to providing the park area and configuration desired by the City for Winter Park. The applicant is looking for direction from the Planning Commission and City Council as to the amount of park land as well as the configuration that is desired for Winter Park so that they can amend the PUD and preliminary plat plans and maps accordingly. Staff will be present at the Planning Commission meeting to discuss the park issues as they relate to the current proposal. ATTACHMENTS 1. Exhibit A - Albertville Zoning Map 2. Exhibit B - Schematic Plan - Leuer-Munsterteiger Property PUD 3. Exhibit C - Base Map showing existing plats, proposed PUD and park areas 4. Exhibit D - Excerpts from Albertville Comprehensive Park and Trail System Plan 5. Exhibit E - Karston Cove 6. Exhibit F - Summerfield Area Concept Plan (Including 13 acre park area) pc: Linda Goeb Mike Couri Pete Carlson Kevin Mealhouse Scott Dahlke EXHIBIT H The following table indicates the park land dedications within various plats to accomplish the objective of _ acres for Winter Park. I Karston Cove 1.281 Cedar Creek North 7.97 With approval of the Karston Cove development, .281 acres of land was dedicated for the future development of a parking lot for Winter Park, with the remaining dedication to be satisfied with a cash contribution of $91,221.39. The park dedication fees for the project took into account the cost to install a 30-stall parking lot and trails. (8' trail one side of Karston Avenue and 64th Street and 10' trail along south side of CSAH 37. Cedar Creek North (7.97 acres of park provided + 2.3 acres wetland) EXHIBIT H