2001-12-07 Punch List
PUNCH LIST
OWNER
CONTRACTOR
SEH NO.
OWNER NO.
PROJECT
City of Albertville
Kuechle Underground, Inc.
DATE OF CURRENT ISSUE
DATE OF ORIGINAL ISSUE
SUBSTANTIAL COMPLETION
FINAL COMPLETION
12/7/01
12/7/01
A-ALBEV 0109.00
N/A
2001 Albert Villas 3 Addition - Lift Station, Albertville, MN
Below is a list of items which must be completed or corrected prior to final acceptance of the subject project. A
completion of these items does not in any way relieve the Contractor of the responsibility to complete the project
in accordance with all Contract Documents.
Item Date Date
No. Item Reviewed Comments Accepted
1. Replace stainless steel control panel
enclosure - outer surface is rusting.
Install stainless steel guide rails - replace
2. galvanized with stainless steel. Center guide
rail brackets half the distance from top to
bottom.
Install control panel skirt - control panel
3. skirt installed backwards and is missing
several screws.
4. Remove all mud and debris from pumps and
wet well invert.
5. Install generator receptacle in control panel.
6. Install separate circuit breaker in control
panel for yard light.
Furnish lift station spare parts kit to City:
7. wear rings, mechanical seals, bearings, 0-
rings and gaskets, all in waterproof
container. See City specifications.
8. Install vent pipe screen at wet well.
9. Weld two additional hooks on pump power
cable rack.
10. Level and secure control panel base.
11. Grade lift station site for proper drainage
and establish vegetation.
12. Grade and compact driveway, ready for
pavmg.
Verify field wiring matches wiring
13. schematics (at the request of Larry
Christenson - Electric Pump Field Service
Technician).
PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE
COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIME) OF THE
AGREEMENT.