Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2002-04-29 Costs CSAH 19 Improvements
=SEN 1200 25th Avenue South, F0. Box 1717, St. Cloud, MN 56302-1717 320.229.4300 320.229.4301 FAX architecture engineering environmental transportation 2001 NORTHWEST COMMERCIAL PARK 04/29/02 ALBERTVILLE, MN SEH NO. A-ALBEV 0113 CSAH 19 IMPROVEMENTS Construction Cost $109,579.71 Contingency $10,000.00 Engineering $24,107.00 Fiscal $10,958.00 Legal and Administrative $2,200.00 TOTAL $156,844.71 Assess to benefiting property on an acreage basis: 'East Side of CSAH 19 80.0 Acres West Side of CSAH 19 122.0 Acres Total 202.0 Acres Assessment Per Acre = w:\albev\0113\co rr\assess-042902.x1s $156,844.71 / 202.0 = $766.46 /Acre 4/29/02 Short Elliott Hendrickson Inc. Your Trusted Resource Equal Opportunity Employer