I reviewed the revised construction plans and have the following additional comments that will
be addressed during construction and shown on the record drawings.
1) Relocate lO-inch gate valve at northwest side of tee at Kahl Avenue CL station 29+30 to
north side of tee at Kahl Avenue CL station 24+45.
2) Maintain 18-inch vertical separation between proposed lO-inch water main and existing 9-
inch gas main.
3) Relocate lO-inch gate valve at southwest side of tee at Kahl Avenue CL station 39+20 to
west side of tee at Kahl Avenue CL station 36+35.
4) InstalllO-inch gate valve on west side of tee at Kahl Avenue CL station 46+50.
5) Size of water main in Kagan Avenue should be lO-inch, not 8-inch.
6) Outside manhole drop of 4.2 feet at sanitary manhole 1.
7) Install barricades at end of Kaiser Avenue and Kagan Avenue.
8) Install 5- foot concrete sidewalk along Kagan Avenue.
Please contact me at 320.229.4373 if you have any questions.
djg
c: Linda Goeb, City of Albertville
Rick Lewandowski, Edina Development
Jerome Kuechle, Kuechle Underground
Pete Carlson, SEH
Mike Czech, SEH
w:\albev\O 1 09\corr\ap 18aO 1-m.doc
Short Elliott Hendrickson Inc.
.
Offices located throughout the Upper Midwest
We help you plan, design, and achieve.
.
Equal Opportunity Employer