1999-11-01 Planning ReportNORTHWEST ASSOCIATED CONSULTANTS INC COMMUNITY PLANNING - DESIGN - MARKET RESEARCH PLANNING REPORT TO: Albertville Mayor and City Council Albertville Planning Commission FROM: Deb Garross DATE: 1 November 1999 RE: Albertville -Mooney Addition FILE NO: 163.06 - 99.10 BACKGROUND The application before the Planning Commission is a continuation of the public hearing from the September 14, 1999 meeting. Mooney Development Corporation has submitted a preliminary plat to subdivide a parcel located at the northwest corner of the County Road 19 (LaBeaux Avenue) and County Road 37 (65th Street) intersection into two commercial lots. Additionally, the applicant is requesting consideration of conditional use permits for a convenience store with gas sales and a car wash. Please refer to the planning report dated September 9, 1999 for additional background information related to this item. The Planning Commission continued consideration of this matter to allow the applicant to re-evaluate the site plan in the following areas: • Redesign the site plan showing that two commercial buildings can be constructed meeting all setback requirements of the City Code. • Consider revisions to the site plan to incorporate one multi-tenant building on the entire site therefore resulting in one lot being created with the subdivision instead of two. • Review internal site circulation and sight lines to assure that vehicles (including delivery trucks) can maneuver throughout the site and that adequate sight lines exist for the west entrance drive. The applicant has revised the site plan and preliminary plat showing two buildings, which conform to all of the City setback requirements. The common property line between proposed Lots 1 and 2 was moved further to the south and the parking area, trash dumpster, underground fuel storage tanks and canopy were relocated resulting in a functional site plan for each lot. The current submittal (plan sheet A1.1) includes a 5775 WAYZATA BOULEVARD, SUITE 555 ST. LOUIS PARK. MINNESOTA 554 1 6 PHONE 61 2-595-9636 FAX 61 2-595-9837 E-MAIL NAC@WINTERNET.COM circulation diagram showing how semi-truck movements will occur sites. The applicant has also submitted plan sheets C-3 and C-4 distance information associated with CSAH 37 and the west driveway proposed Lot 1. Attachments: Exhibit A -Site Location Map Exhibit B -Memo from Peter Carlson dated 9-9-99 Exhibit C -Memo from Peter Carlson dated 10-21-99 Exhibit D -Findings of Fact (Preliminary Plat) Exhibit E -Findings of Fact (Conditional Use Permits) Exhibit F -Transmittal from Nations & Co. dated 10-4-99 Exhibit G - NSP Letter dated 10-27-99 Exhibit H -Front Elevation Sketch Exhibit I -Preliminary Plat /Site Plan set -Preliminary Grading Plan -Preliminary Utility Plan -Landscape Plan -Sight-Line Plan View -Sight-Line Sections -Site Plan -Truck Circulation Plan -Site Lighting Plan -Floor Plan -Exterior Elevations - F~cterior Elevations -Canopy SignagelTrash Enc. EXECUTIVE SUMMARY The applicant requests approval for the following: throughout both illustrating sight entrance/exit to • Site and Building Plans for proposed Lot 1, Block 1, Mooney Addition. • Three Conditional Use Permits to accommodate the car wash, convenience food establishment and motor vehicle fuel sales operation on proposed Lot 1, Block 1, Mooney Addition. • Preliminary plat approval for Mooney Addition, (a two-lot, commercial subdivision). The requested approvals require that the Planning Commission and City Council consider the applications in relation to established Zoning and Subdivision Ordinance review criteria and Comprehensive Plan policies. The decision to approve or deny the requested site/building plans, Conditional Use Permits and preliminary plat is viewed as a policy decision to be made by the City Council. Should they find the submitted plans acceptable, it is recommended that the following conditions be imposed. 1. The general, car wash, convenience food establishment and motor vehicle fuels sales and services Conditional Use Permit provisions of the City Zoning Ordinance are considered and satisfactorily met. 2. All grading, drainage, and utility plans are subject to review and approval of the City Engineer. 3. The lighting plan is amended to illustrate that all lights on the canopy will be recessed fixtures. 4. The preliminary plat is amended. to show that relocation of the NSP overhead utility lines occurs as a condition of preliminary plat. The purpose for requiring that a schematic site plan be prepared for proposed Lot 2, was for the applicant to demonstrate that an adequate building envelop existed for a future development which could indeed be constructed without variance from the Zoning Ordinance. The site plan clearly shows that relocation of the NSP overhead power line is necessary to create a buildable lot. As such, the developer should be responsible to relocate the utility lines so that the newly created lot is not encumbered by the power line easement. 5. The applicant enters into an agreement with the City, indicating that the lot owner is responsible for parking lot restoration in the event the parking lot is disturbed as a result of utility improvements, maintenance, or repair. This understanding will be included in the plat development agreement and recorded with the property. 6. All requirements of the City Engineer regarding easement location, configuration and size, grading and drainage and utility plans are satisfied. 7. Park dedication requirements are satisfied and a required (8) foot trail is accommodated via construction within the right-of-way of CSAH 19, pursuant to approval of the City Engineer and Wright County. The bituminous trail shall be constructed to City standards and installed at the time the final layer of asphalt is laid over other parking/site areas. Any remaining park dedication is to be paid to the City as a cash dedication. 8. The applicant obtains all required driveway, utility and other permits required by Wright County. 9. The appropriate shared access (ingress/egress) agreements and/or easements be provided subject to review and acceptance by the City Attorney. 10. A detailed sign plan indicating signage proposed for the front wall and gas sales is submitted at the time of sign permit application for the car wash/convenience food/motor vehicle fuels sales use. 11. The site plan is amended to indicate fire insulated glass windows at the back of the car wash. 12. The site plan is amended to show parking stalls with a depth of 20 feet. 13. The internal circulation plan is subject to review and approval of the City Engineer. 14. A specific sign plan is submitted at the time of building permit application. 15. All exterior/outside storage shall conform to the requirements of the Zoning Ordinance Section 1000.16. 16. The final plat shall be filed within 100 days of preliminary plat approval. Preliminary Plat As illustrated in Exhibit commercial lots. The performance standards Ordinance. I, the applicant proposes to subdivide the parcel into two following review evaluates the proposed plat against the of the B-3 Zoning District and the Albertville Subdivision Blocks: The proposed block length and width comply with the dimension standards of the City. Lots: The following lot standards are established in the B-3 Zoning District: Required Lot 1 Lot 2 Lot Area (sq.ft.) None 45,174 63,057 Lot Width 100' 125' 190' Setbacks Front 35' 35' NA Side -Interior 20' NA NA - Street 35' 35' Rear 20' 127' The proposed lots appear to be consistent with the City's requirements for B-3 zoned properties. The proposed site plan relocated the common property line between Lots 1 and 2 further to the south than the original plan. The result was an increase in the buildable area of future Lot 2 from approximately 13,200 to 18,700 square feet (outside of setback requirements and the NSP easement). No building may be constructed within utility easements, however, driveways and parking lots may extend into easements. At issue with proposed Lot 2 however, is the location of an existing power pole within the drive aisle area of the parking lot, (northwest of the concept fast food footprint). The preliminary plat (sheet C-2) suggests that the NSP pole and power lines are to be "relocated by others." Staff suggests that a condition of preliminary plat should be for the applicant to relocate the NSP pole and power lines since the relocation is required in order to provide a viable building site on proposed Lot 2. It is also important to note that improvements within drainage and utility easements are at risk of the property owner. In the event the parking lot is disturbed as a result of utility improvements, maintenance, or repair, the restoration of the parking lot is the responsibility of the landowner. This understanding will be included in the plat development agreement and recorded with the property. Utility Plans: The City Engineer should review and comment on the following: 1. Easement location configuration and size on the preliminary plat. 2. Grading and drainage plan. 1. Utility plans. 2. Sight distance plans 3. Truck circulation plan Park Dedication: The applicant shall provide parkland dedication in the amount equal to 10% of fair market value of the land. The applicant will be required to construct an eight-foot trail along County Road 19 between County Road 37 and the north driveway at the time that the site is paved. Wright County Highway Department has indicated that the trail may be constructed within the County Road 19 right-of-way however the applicant will need to obtain a permit from the County to do so. The applicant will receive a credit on their park land contribution for the cost of the trail. The park dedication amount will be determined at the time of final plat and developer's agreement. Access: The plat abuts two county roads. Access to County Road 37 and County Road 19 was established with the Westwind PUD. Wright County must approve a driveway permit for each county road. Conditional Use Permits The applicant is proposing freeway oriented business use for Lot 1 consisting of convenience retail, gas sales and a car wash. The latter two uses require a conditional use permit within the B-3 zoning. The following review evaluates the site plan and CUP criteria. Lot Size: Gas sales facilities are required to have a lot area in excess of 20,000 square feet. The proposed Lot 1 provides a total lot area of 45,174 square feet. Building Setback: The proposed building and gas canopy location meet the building setback of the B-3 Zoning District. Site Access: The site access points on County Road 37 and County Road 19 were negotiated and agreed upon as part of the Westwind PUD and construction of County Road 37. Review of the site access raises the following issues: The site access onto County Road 37 requires a motorist to look back to the southeast to observe Westwind traffic on County Road 37. In the original site plan, the building trash enclosure, car wash stacking and site landscaping obstructed the sight lines for motorists. Contributing to the sight line problems was the curb cut elevation at 960 with the building elevation at 964 and car wash driveway elevation at 963. The applicant has submitted sight line plan views and sections illustrating the line of sight for vehicles utilizing the west driveway entrance/exit. In addition the site plan has been revised in several areas. The trash enclosure has been relocated from the west, side of the building to the north side of the parking lot thus removing that sight barrier. The landscape plan has been modified to remove crab apple trees and cranberry bushes with flowers and shrub roses, which are low growing and should not obstruct line of sight. In addition the tree species along County Road 37 has been changed to Honey Locust which have less dense foliage (small leaves) and an "airy" appearance, which will also enhance the line of sight in that area of the project. The applicant reviewed modifying grades to improve sight visibility however, grading and drainage issues preclude this option. The City Engineer will need to review the site line plans to determine if they are acceptable or require further modification. Building Appearance: Exhibit A-3.0 and A-3.1 illustrate the proposed building elevations. The applicant has also submitted a color rendering of the proposed building along with examples of exterior materials. The proposed building will have an exterior appearance consisting of masonry veneer, complimented by the window arrangement, an EFTS fascia and hip roof. With regard to the building design, we would offer the following recommendations: 1. The site plan should be amended to indicate fire insulated glass windows for the back of the car wash. Exterior Storage: The Zoning Ordinance contains specific standards for outdoor storage in commercial zoning districts. As such, a condition of conditional use permit approval should be that outside storage conform to the requirements of Zoning Ordinance Section 1000.16. 1. All exterior/outside storage shall conform to the requirements of Zoning Ordinance Section 1000.16. Car Wash Stacking: The City requires stacking space to accommodate the number of vehicles that can be washed during a 30-minute period. The site plan illustrates stacking for six cars, indicating afive-minute wash cycle. Due to the need for improved traffic visibility, staff recommended that the traffic flow through the car wash be reversed. The current site plan indicates that vehicles will access the car wash from the east side as recommended by staff. Parking: The Zoning Ordinance requires the following parking for the proposed use: Retail (4,000 sq.ft. x .9 = 3,.600) 200 = 18 spaces Car Wash 2 spaces Gas Sales 4 spaces 24 spaces The site plan provides 20 parking stalls (for Lot 1, Block 1) addressing the retail need of the store, an additional six stacking spaces are provided for the car wash. The City standards establish a separate parking for freestanding gas sales facilities to accommodate their employee and customer parking. The gas sales in combination with retail facility should adequately be accommodated by the proposed parking layout. 1. The site plan should be amended to show parking stalls with a depth of 20 feet as opposed to 18 feet as currently shown on the plan. Loading: The original site plan provided designated delivery truck unloading areas at the northwest corner of the parking lot which was away from the store entrance. The applicant has modified the site plan to locate the loading area adjacent to the west, side of the building. The relocation of the trash enclosure (to improve sight lines) resulted in creating sparking/loading facility next to the building, which is a much more functional design. Circulation: The internal circulation for both proposed lots was an issue identified by the Planning Commission and Staff. The applicant has modified the site plan and submitted a truck circulation plan showing that asemi-truck can make all movements within the parking lot as well as to access adjacent CSAH 37 and 19. The circulation pattern was improved by relocating the fuel tanks from the north line of Lot 1 to the east lot line. A semi-truck can fill the fuel tanks without obstructing the internal parking lot circulation. There is adequate space provided within the east access drive to allow for vehicles to pass when the fuel tanks are being filled. 1. The internal circulation plan be reviewed and approved by the City Engineer. Landscaping Plan: Review of the proposed landscape plan reveals an attractive combination of ornamental trees, evergreens, shrubs and flowers at the back of the building and along the perimeter of the site. The developer also proposes to install an irrigation system, which will significantly enhance the survivability of the landscape vegetation. As stated previously, the plan has been amended to place low growing shrubs and flowers along the CSAH 37 boundary, which will enhance sight lines for vehicles using the west driveway. It should be noted that the site plan approval for landscaping materials is for proposed Lot 1 and that a future use on Lot 2 will need to provide landscape/screening materials based upon the specific site plan for that lot. Lighting: The lighting plan illustrates a box light fixture, which directs light downward to avoid glare. Canopy lighting should recess into the canopy structure to direct light downward to the service area. 1. The lighting plan should be amended to illustrate recessed lighting for the canopy structure. Signage: A conceptual signage plan has submitted a site plan. The following table is provided to illustrate how the proposed sign plan conforms with the requirements of the Zoning Ordinance. Permitted Proposed Front Wall Sign C Store 40 sq.ft. Undetermined Side Wall Sign Car wash Entry 9 sq.ft. 6.3 sq.ft. Carwash Exit 9 sq.ft. 6.3 sq.ft. Ground Signs/Gas Sales Pylon Sign Size 125 sq.ft. 125 sq.ft. Pylon Sign Height* 75 ft. 75 ft. Gas Sales Sign 80 sq.ft. Undetermined Canopy Signage Sign Size 12" letters 12" letters *Sign height for this site was approved with the Westwind PUD. The conceptual sign plan appears to be compliant with City standards. 1. The sign plan submitted with the application is conceptual and as such, submittal of a detailed sign plan should be required at the time of building permit application for the convenience store/car wash/gas station facility. RECOMMENDATION The proposed land use is consistent with the Comprehensive Plan and past PUD approvals. The applicant has demonstrated that an adequate building envelope and parking exist on proposed Lot 2 without the need for future setback variances. Based upon our review, we would recommend preliminary plat approval subject to the conditions outlined in the Executive Summary of this report. Review of the CUP reveals a compact site design that meets City Code requirements. Based on our review, we would recommend CUP approval subject to the conditions outlined in the Executive Summary of this report. ACTION REQUESTED: A separate motion to approve, deny or conditionally approve the preliminary plat -and conditional use permits would be in order. In the event that the Planning Commission recommends approval subject to conditions outlined herein, findings of fact have been prepared for the preliminary plat and conditional use permits. Staff should be directed to make the appropriate changes to the findings of fact in the case that additional and/or amended conditions or project denial are recommended. OFFICIAL ZONING MAP ^ Agricultural Rural A-1 ~ R-6, Residential High Density ® B-W, Business Warehouse ^ , Agricultural Transitional A-2 ~ R-7, Special Purpose High Density ^ I-1, Light Industrial ^ , R-1 A, Low Density Single Family ^ R-8, Mixed Housing ~ I-1A, Limited Industrial ^ Single Family R-1 ® R-MH, Manufactured Housing Residential^ I-2, General Industrial ® , Single & Two Family R-2 ^ B-1, Neighborhood Business ^ PUD, Planned Unit Development ® , Single 8~ Two-Family R-3 ^ B-2, Limited Business ^ P/l, Publicllnstitutional ® , Low Density Multiple Family R-~ ^ B-3, Highway Commercial ^ S, Shoreland Overlay ^ , R-5, Medium Density Multiple Family ^ B-4, General Business ^ VV, Wetland Overlay o ~ooo zooo a~-~--• SCALE IN FEET EXHIBIT A CLTY OF ALBERTVILLE - WRIGHT COUNTY -MINNESOTA Data for 99348 PROPOSED Page 3 TYPE II 24-HOUR RAINFALL= 5.90 IN Prepared by RLK-KWSISTO, LTD. 28 Oct 99 HydroCAD 5.11 000754 (c) 1986-1999 Applied Microcomputer Systems POND 1 POND #1 Qin = 13.34 CFS @ 11.96 HRS, VOLUME= .73 AF Qout= 3.86 CFS @ 12.19 HRS, VOLUME= .69 AF, ATTEN= 71~, LAG= 13.6 MI N ELEVATION AREA INC.STOR CUM.STOR STOR-IND METHOD (FT) (SF) (CF) (CF) PEAK STORAGE = 25829 CF 950.0 0 0 0 PEAK ELEVATION= 956.6 FT 951.0 1732 866 866 FLOOD ELEVATION= 957.0 FT 952.0 2634 2183 3049 START ELEVATION= 954.4 FT 953.0 3598 3116 6165 SPAN= 10-20 HRS, dt=.1 HRS 954.0 4590 4094 10259 Tdet= 171.1 MIN (.41 AF) 955.0 5605 5097 15356 956.0 6636 6120 21476 957.0 7824 7230 28706 # ROUTE INVERT OUTLET DEVICES 1 P 954.4' 12" CULVERT n=.013 L=66' S=.002' /' Ke=.5 Cc=.9 Cd=.6 Data for 99348 EXISTING Page 1 TYPE II 24-HOUR RAINFALL= 5.90 IN Prepared by RLK-KUUSISTO, LTD. 28 Oct 99 HydroCAD 5.11 000754 fc) 1986-1999 Applied Microcomputer Systems SUBCATCFII~iSNT 1 EXISTING RUNOFF PEAK= 5.29 CFS Q 12.04 HRS, VOLUME= .34 AF ACRES CN SCS TR-20 METHOD 1.68 69 PERVIOUS SURFACE TYPE II 24-HOUR RAINFALL= 5.90 IN SPAN= 10-20 HRS, dt=.1 HRS Method Comment Tc (min) TR-55 SHSST FLOW Segment ID: 10.2 n=.15 L=130' P2=2.9 in s=.0345 '/' SHALLOW CONCENTRATED/IIPLAND FLOW Segment ID: 5.8 Kv=15 L=530' s=.0104 '/' V=1.53 fps Total Length= 660 ft Total Tc= 16.0