2001-10-05 Proposed Revised Storm Sewer Alignment
~SeJ
MEMORANDUM
1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717
320.229.4300
800.572.0617
320.229.4301 FAX
TO:
Adam Ginkel, Plowe Engineering
FROM:
Scott Hedlund, P.E.
DATE:
October 5, 2001
RE:
Albert Villas 4th Addition
SEH No. A-ALBEV 0112.00 14
The proposed revised storm sewer alignment between C.B. M.H. B and the outlet to County
Ditch No.9, as outlined in your fax dated 10/3/01, necessary to avoid grade conflicts with the
existing adjacent gas pipeline, is approved pellding the following conditions are satisfied.
1. Permanent utility easements lO-feet on either side of the storm sewer's new
alignment (20-feet total width) must be secured. It appears that Lot 10, Block 3,
Albert Villas 4th Addition and the BP Pipeline would be affected by this realignment.
2. Proper erosion control measures must be taken at the new outlet location at County
Ditch No.9 to the satisfaction of the City of Albertville and Wright County.
sh
c: Pete Carlson, SEH
Mike Czech, SEH
Linda Goeb, City of Albertville
Mike Couri, City Attorney
Cindy Sherman, Northwest Associated Consultants
Matt Davich, E.G. Rudd & Sons, Inc.