Loading...
2001-11-02 County Ditch No. 9 Slope Condition .-'5&1 1200 25th Avenue South, PO. Box 1717, St. Cloud, MN 56302-1717 320.229.4300 320.229.4301 FAX architecture engineering environmental transportation November 2,2001 RE: Albertville, Minnesota Albert Villas 4th Addition SEH No. A-ALBEVOI12.00 14 Gary Rudy Project Manager Edina Development Corporation 700 Industry Avenue Anoka, MN 55303 Dear Gary: On Thursday, November 1,2001, you and I met with Mr. Keith Cherryholms, of the MPCA, on site to review the slope condition of County Ditch 9. Mr. Cherryholms was very concerned with the lack of turf establishment on the slopes of the ditch that was recently graded. Even though the slopes have been seeded and mulched, the seed has not germinated and the mulch is not staying in place on the slope. It does appear that turf will not be established before winter. In order to protect the slopes over the winter and spring, wood fiber blankets need to be placed on the slopes. The wood fiber blanket needs to be placed as soon as possible. This type of erosion control is necessary in order for you and your contractor to comply with your NDPES permit. Without the wood fiber blanket Mr. Cherryholms indicated that he would issue a cease and desist order until the site is brought into compliance with your permit. As agreed in our meeting I will inspect the site again on Thursday, November 8, 2001, to review the progress of turf establishment and installation of erosion control. e(ely, ~ ., A Ii I \1 ~.. / {t!~~lv Peter J. Carlson, P.E. City Engineer cb c: Linda Goeb, City Administrator Mike Couri, City Attorney Matt Davich, EG Rudd w:\albevIOI12\corr\no02aO l-l-rudy.doc Short Elliott Hendrickson Inc. Your Trusted Resource Equal Opportunity Employer