2004-09-23 Construction Meeting Minutes Towne lakes in Albertville Construction Meeting Minutes, Submitted by Stephen Swanson In Attendance: Scott Ruegemer, Rottlund Clay Olson, Rottlund Duane Johnson, Rottlund Kathy Gardas, Rottlund Tyler, CPDC Max, CPDC Jamie, Valley Plumbing cc: Steve Swanson, Rottlund Tim Himmer, Rottlund Scott Ruegemer, Rottlund Dave Dickinson, Rottlund Brian Engebretson, Rottlund John Falk, Rottlund John Carlson, Westwood Dave Hemple, CPDC Paul Haugo, Braun lntertec Russel Bly, SEH John Middendorf, City of Albertville Ken, Westwood Copy test results to Jon Sutherland at the City of Albertville, Jim Schultz at SEH and Russell at 04/28 SEH (compaction and sewer and water). Sewer and water testing to be complete. Need to have model occupancy end of May. Report for ea plan. No written test reports. 04/28 Draintile leads not on development plan as of 4/28/04. Plans done. Sump discharge (single family) must discharge to storm sewer. Current single family (developed lots) daylight - refer to City detail. Top soil stockpile. Blk 2, Lots 28 - 31. 4th Addition. 04/28 04/28 04/28 Review street condition - document damage. Curb OS/26 Traffic sign age install week of July 1, 2004. Still open as of 7/21/04. OS/26 Preinstall inspection fees responsibility to be determined. Rottlund, SEH, City of Albertville. 06/23 Blowout water service from curb stop to house connection before fall freeze. Who does this? 06/23 City requirements for final acceptance. 07/14 Silt fence or sod behind curb. Who's responsible? 07/21 Private drive erosion control. 07/28 Phase IV grading to start 8/1/04. Streets end October. Early lnote. 07/28 Need plan of draintile leads. Balance of sidewalks at Villa site and single family complete by 8/6/04. Community Center: * Power/gas application. * Pool deck schedule Fall '04. * Frame start 9/9/04 (Metro). - Sewer and water connection (Rehbein). 09/08 Need revised grading plan. 7.4% sidewalk grade won't work. 07/28 08/25 09/08 Mop sink to be located under stair, interior wall side. 09/08 Knee wall to be built under stairs (no storage allowed). 09/08 Pool water discharge? City storm or sanitary sewer? Day light? 09/08 Parking lot schedule. H/C ramp locations? Exterior sidewalk thickness 6"? By 11/1/04. 09/08 Retaining wall schedule? Fireplace Details? 1'-0" dimension by shower, can this be less, ADA requirement? Ext. 09/08 sheathing OSB or Gyp.? 09/16 Concrete pool deck schedule week of 10/6. 09/16 Building completion 2nd week of December 2004. 09/16 Schedule joint trench power/gas FTTH, CTV, Phone (Community Center). 09/16 Water softener to be installed in Community Center. 09/16 Spiral staircase - Dakota Fence. Specs, attachment. Valley Plumbing to install gas line underground to f.p. Conduit for electric (low voltage) before 09/16 floor is poured (Cities). MinutesTowneLakes (Iv) Page 1 of 1 note Braun open Westwood note CPDC, Westwood Dave D. note John F. Ken at Westwood Scott R. CPDC Steve S. note Scott R. CPDC/SEH TimH. CPDC TimH. CPDC note CPDC TimH. next Ken @ Westwood Scott R. mtg.8/4 8/6 CPDC, Westwood Scott R. Tyler, CPDC Scott R. Fran, Westwood Scott R. asap Tyler, CPDC note note CPDC; Jim, Pool Contractor Tyler, CPDC Tyler, CPDC Duane J.