2002-08-28 Punch List
,
PUNCH LIST
OWNER
CONTRACTOR
SERNO.
OWNER NO.
PROJECT
City of Albertville
Kuechle Underground
A-ALBEV 0112.00
DATE OF CURRENT ISSUE
DATE OF ORIGINAL ISSUE
SUBSTANTIAL COl\1PLETION
FINAL COMPLETION
08/28/02
08/28/02
2001 Albert Villas 4th Addition
Below is a list of items which must be completed or corrected prior to final acceptance of the subject
project. A completion of these items does not in any way relieve the Contractor of the responsibility to
complete the project in accordance with all Contract Documents. Any questions call Russel Bly at
651.308.5462.
Item Date Date
No. Item Reviewed Comments Accepted
1 CB 15 and CBl5A need re-mudding around dog house 08/28/02
2 County Ditch needs cleaning (silt & garbage) at both entrances 08/28/02
3 MH6 - Needs mud around inverts 08/28/02
4 All hydrants need touchup paint 08/28/02
5 MH5 - Settlement of road around MH rings need to be taken out 08/28/02
6 CB 18, 19, & 20 - Cracks around dog houses. Need re-mudding 08/28/02
7 MH7 - Inverts need mudding 08/28/02
8 MHC & MHD - Dog house falling apart. Rings broken, leaking, 08/28/02
needs cleaning & inverts poured. .-
9 MHlO - Hole in bottom section needs mud to fill and stop leak 08/28/02
10 Hydrant at end okay. Kahler Bay needs flag and wire installed 08/28/02
11 CB7 & CB8 - Mudding work needed around dog house and 08/28/02
casting
12 CB9 & CBA - Need Mud at dog house, casting, and rings 08/28/02
13 Apron south of CB9 needs band to tie flared end 08/28/02
14 CB4 & CBS - Need mud around rings 08/28/02
15 MN 19 - Needs lowering 08/28/02
..
Item Date Date
No. Item Reviewed Comments Accepted
16 MMB - mudding of dog house needs repair 08/28/02
17 Grading needed around MHB and MHB 1 08/28/02
18 All storm sewer needs flushing and cleaning 08/28/02
19 All ponds need sediment cleaned out 08/28/02
Ditch structure south of Kali, parallel to Kegan (3rd Phase)
20 Dog house needs replacing, currently falling out
21 Top casting leaks, needs mud
22 Slopes at outlet need flattening, too steep.
PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE
COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIME) OF
THE AGREEMENT.
REMARKS:
Issued By:
Title:
mdh
c: Pete Carlson SEH
Mike Czech, SEH
Linda Goeb, City of Albertville
Tim Guimont, City of Albertville
Rick Lewandowski, Edina Development
Craig Schlichting, Plowe Engineering, Inc.
Matt Davich, E.G. Rud & Sons, Inc.
Kuechle Underground, Inc.
\\SEHSC3\SCCYlALBEV\O 112\SPECS\083002- PUNCH LIST .DOC