Loading...
1995-06-22 Partial Payment Request . . MEYER-ROHLIN, INC. ENGINEERS-LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn.55313 Phone 612-682-1781 June 22, 1995 City of Albertville c/o Linda Houghton, Clerk PO Box 131 Albertville, MN 55301 RE: Parkside utilities and street Albertville, Minnesota Honorable Mayor and City Council: The contractor for the above-referenced project has requested partial payment for work completed to date. See the attached payment recommendation to the developer. Since the developer is making payment to the contractor with a portion of the letter of credi t deposited with the City to guarantee completion of the project, the City must therefore approve a reduction in the letter of credit. The amount of the reduction is as follows: Reduction = (partial payment - [change orders x 95%]) x 57% = ($31,019.83 - [$8597.80 x 95%]) x 57% = $13,025.59 The reason that the change order work has been factored out in the reduction calculation is that it is not included in the letter of credit deposited with the City. Since the work performed by the contractor reflected by this amount has been completed, we recommend that Kenco Construction, Inc. 's letter of credit be reduced by $13,025.59. If you should have any questions, please do not hesitate to contact me. Sincerely, MEYER-ROHLIN, INC. iZ..e:;/ 4~ Ronald Geurts Project Engineer cc: Kenco Latour Construction, Inc. File S-93124 Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor . . MEYER-ROHLIN, INC. ENGINEERS-LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn.55313 Phone 612- 682-1781 June 22, 1995 Mr. Kent Roessler Kenco 13736 NE Johnson street Ham Lake, MN 55304 RE: PARKSIDE UTILITIES & STREET Albertville, Minnesota Partial Payment Request No. 7 Dear Mr. Roessler: The contractor for the above-referenced project has requested partial payment for work completed to date. The standard 5% retainage has been reduced to 1% since the only outstanding item to be completed is the wear course. The contract was extended to meet with the City's request; however, the contractor requested a retainage reduction due to the extension. BID "A" SANITARY SEWER Item Bid Inst. No. Item Qty. Qty. Unit Unit Price Total Price I. 8" PVC, (8-10' ) 2523 2127 1.f. $ 14.40 $30,628.80 2. 8" PVC (10-12' ) 882 1250 1. f. $ 15.50 $19,375.00 3. 10" PVC (10-12') 549 528 1. f. $ 16.80 $ 8,870.40 4. 10" PVC (12-14' ) 130 140 1. f. $ 17.90 $ 2,506.00 5. 10" PVC (14-16' ) 180 201 1. f. $ 20.10 $ 4,040.10 6. 10" PVC (16-18 I ) 257 263 1.f. $ 22.30 $ 5,864.90 7. 10" PVC (18-20') 204 162 1.f. $ 24.50 $ 3,969.00 8. 12" PVC (10-12') 223 279 1. f. $ 18.40 $ 5,133.60 9. 12" PVC (12-14') 641 508 1. f. $ 19.50 $ 9,906.00 10. 12" PVC (14-16' ) 42 130 1. f. $ 21.70 $ 2,821.00 II. 12" PVC (16-18' ) 32 19 1.f. $ 23.90 $ 454.10 Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor . . 12. 12" PVC (18-20 I) 28 48 1.f. $ 26.00 $ 1,248.00 13. 12" PVC (20-22') 62 81 1.f. $ 30.50 $ 2,470.50 14. Manhole, 48" dia. (0- 8 I ) 25 25 each $1138.00 $28,450.00 15. Manhole 48" dia. extra depth 112 117.18 1. f. $ 74.00 $ 8,671.32 16. Manhole outside drop section 2 2 1.f. $ 950.00 $ 1,900.00 17. Manhole outside drop section extra depth 3.3 6.72 1.f. $ 47.00 $ 315.84 18. 8" PVC cap 1 1 each $ 15.00 $ 15.00 19. Remove 12" PVC cap & connect to exist- ing 1211 PVC 1 1 each $ 410.00 $ 410.00 20. 12" PVC cap 1 3 each $ 37.00 $ 111.00 21. Sewer service connections 108 108 each $ 46.00 $ 4,968.00 22. 4" PVC, SDR 26 service pipe 4810 5196 1. f. $ 6.90 $35,852.40 23. Density tests 280 166 each $ 19.60 $ 3,253.60 24. Submersible pump lift station 100% 100% l.s. $24720.00 $24,720.00 25. Electrical for lift station 100% 100% 1. s. $9900.00 $ 9,900.00 26. Remove 4" plug & connect to existing 4" PVC forcemain 1 1 each $ 360.00 $ 360.00 27. 4" PVC 42 42 1.f. $ 10.00 $ 420.00 28. 4" 900 DIP bend 2 2 each $ 56.00 $ 112.00 29. 4" x 4" x 4" DIP tee 1 1 each $ 81.00 $ 81.00 30. 4" gate valve, valve box and riser 2 2 each $ 265.00 $ 530.00 31. Crushed rock 50 65.14 c.y. $ 12.00 $ 781. 68 TOTAL BID "A" $~~~J:~~~,;,~4 . . ALTERNATE BID "BII WATERMAIN I. 6" PVC, C-900 1618 1481 Lf. $ 8.40 $12,440.40 2. 8" PVC, C-900 3517 3493 1.f. $ 10.20 $35,628.60 '3 . 12" PVC, C-900 578 591 Lf. $ 15.40 $ 9,101.40 4. 6" x 6" x 6" DIP tee 2 5 each $ 130.00 $ 650.00 5. 8" X 8" X 6" DIP tee 10 8 each $ 170.00 $ 1,360.00 6. 8" x 8" X 8" DIP tee 2 0 each $ 185.00 $ 0.00 7. 12" X 12" x 6" DIP tee 1 1 each $ 270.00 $ 270.00 8. 12" X 12" x 8" DIP tee 1 1 each $ 290.00 $ 290.00 9. 8" x 8" X 6" X 6" DIP cross 1 1 each $ 198.00 $ 198.00 10. 6" 22tO DIP bend 3 2 each $ 99.00 $ 198.00 II. 6" 450 DIP bend 2 2 each $ 99.00 $ 198.00 12. 8" IltO DIP bend 14 6 each $ 145.00 $ 870.00 13. 8" 22tO DIP bend 1 6 each $ 150.00 $ 900.00 14. 6" resilient seat gate valve, valve box & riser 19 19 each $ 300.00 $ 5,700.00 15. 8" resilient seat gate valve, valve box & riser 9 9 each $ 420.00 $ 3,780.00 16. 12" resilient seat gate valve, valve box & riser 1 1 each $ 730.00 $ 730.00 17. Hydrants 12 12 each $1585.00 $19,020.00 18. Remove & reuse 6" plug 1 1 each $ 330.00 $ 330.00 19. Remove & reuse 8" plug 1 1 each $ 330.00 $ 330.00 . . 20. Remove & reuse 1211 plug 1 1 each $ 330.00 $ 330.00 21. Remove & reuse hydrant 1 1 each $ 560.00 $ 560.00 22. Remove & salvage existing 811 x 611 reducer & 611 DIP 1 1 each $ 330.00 $ 330.00 23. Water service connection 108 108 each $ 117.00 $12,636.00 24. III copper service pipe 4340 4438 1. f. $ 6.20 $27,515.60 25. Bacteriological test 7 7 each $ 31. 50 $ 220.50 26. Crushed rock 50 0 c.y. $ 12.00 $ 0.00 27. Density tests 285 153 each $ 19.60 $ 2,998.80 28. Raise valve box 16 0 each $ 82.00 $ 0.00 TOTAL ALTERNATE BID IIBII $~~gJ:~~~~~O BID IICII STORM SEWER 1. Remove 4211 RCP apron & connect to 4211 RCP 1 1 each $ 165.00 $ 165.00 2. 4811 Arch RCP, CL. III (0-8' ) 512 608 1. f. $ 106.00 $64,448.00 3. 4811 Arch RCP apron w/galvanized trash guard 1 1 each $1215.00 $ 1,215.00 4. 4211 RCP, CL. III (0-8' ) 122 124 1. f. $ 70.60 $ 8,754.40 5. 3611 RCP, CL. III 266 254 1. f. $ 45.60 $11,582.40 6. 36" RCP apron w/ga1vanized trash guard 1 1 each $1065.00 $ 1,065.00 7. 2711 RCP, CL. III ( 0-8 ' ) 520 517 1. f. $ 30.80 $15,923.60 8. 2111 RCP, CL. III ( 0-8 ' ) 219 182 1. f. $ 23.70 $ 4,313.40 . . 9. 18" RCP, CL. III (0-8' ) 230 229 1.f. $ 21. 60 $ 4,946.40 10. 15" RCP, CL. III (0-8' ) 555 550 1.f. $ 20.00 $11,000.00 11. 12" RCP, CL. III (0-8') 70 68 1. f. $ 18.60 $ 1,264.80 12. Catch basin, 102" dia. (0-5' ) 1 1 each $3485.00 $ 3,485.00 13. Catch basin, 102" dia. extra depth 0.7 0.7 1.f. $ 340.00 $ 238.00 14. Catch basin, 96" dia. (0-5' ) 1 1 each $2860.00 $ 2,860.00 15. Catch basin, 96" dia. extra depth 1.2 1.2 1.f. $ 290.00 $ 348.00 16. Catch basin, 84" dia. (0-5' ) 1 1 each $2335.00 $ 2,335.00 17. Catch basin, 84" dia. extra depth 0.6 0.6 1.f. $ 230.00 $ 138.00 18. Catch basin, 72" dia. (0-5' ) 5 5 each $1780.00 $ 8,900.00 19. Catch basin, 72" dia. extra depth 2.9 2.9 1.f. $ 165.00 $ 478.50 20. Catch basin, 60" dia. (0-5' ) 1 1 each $1440.00 $ 1,440.00 21. Catch basin, 48" dia. (0-5') 15 15 each $1025.00 $15,375.00 22. Catch basin, 48" dia. extra depth 1.3 1 1.f. $ 82.00 $ 82.00 23. Catch basin, 30" dia. (0-5' ) 1 1 each $ 655.00 $ 655.00 24. Catch basin, 27" dia. (0-5' ) 2 2 each $ 700.00 $ 1,400.00 25. 15" HCP apron 2 2 each $ 280.00 $ 560.00 26. Random rip-rap CL. IV 33.3 33.3 c.y. $ 34.00 $ 1,132.20 27. Filter blanket 16.7 16.7 c.y. $ 7.80 $ 130.26 . . 28. Crushed rock 400 25 c.y. $ 12.00 $ 300.00 29. Density tests 103 12 each $ 19.60 $ 235.20 TOTAL BID "C" $~g~,;ZZ~,;,~6 BID "D" STREETS 1. Grading, right turn lane, CSAH 37 ROW 100% 1 1.s. $9450.00 $ 9,450.00 2. Subgrade preparation 22496 21474 s.y. $ 0.48 $10,307.52 3 . Aggregate base placed class 5 (CV) 9749 10357 c.y. $ 10.20 $105,641.40 4. Surmountable concrete curb & gutter 9490 9404 1.f. $ 5.25 $49,371. 00 5. Type 31 base course mixture 30708 30000 sy-in $ 1.34 $40,200.00 6. Type 41 wear course mixture 29942 7963 sy-in $ 1.44 $11,466.72 7. Seeding, mulching fertilizing and disk anchoring 0.3 0.3 acres $1260.00 $ 378.00 8. 4" concrete flume 2 2 each $ 330.00 $ 660.00 9. Sod 200 0 s.y. $ 2.10 $ 0.00 10. Ditch block 1 1 each $ 220.00 $ 220.00 11. Permanent barricades 48 48 1. f. $ 31.50 $ 1,512.00 12. Street sign (complete) 2 2 each $ 168.00 $ 336.00 13. Random rip-rap C1. II 4.5 4.4 c.y. $ 37.00 $ 162.80 14. Adjust manhole 23 23 each $ 165.00 $ 3,795.00 15. Adjust gate valves 15 15 each $ 82.50 $ 1,237.50 16. Density tests 45 9 each $ 19.60 $ 176.40 TOTAL BID "D" $~~~,;~~~,;,~4 . EXTRA WORK 1. Geotextile filter fabric o 7546 2. Common excavation(EV) 0 1505 3. 4" insulation o 80 4. Motorola Pager o 5. Raise manhole in swamp o 6. 6" DIP sleeve (materials) o 7. o 6" 45 DIP bends (materials) o 8. 6" PVC, C-900 (materials) 14 o 9. Adjust watermain to avoid sanitary 1.5 o 10. Extend ex. RCP for turn lane o 100% 11. Moved culvert in farmer's dwy for turn lane 0 100% 12. Manhole diamonds o 13. Gate valve diamonds o s.y. c.y. s.f. 1 1.s. 1 1.s. 1 each 4 each 1.f. hour 1.s. 1.s. o each o each TOTAL EXTRA WORK TOTAL WORK COMPLETED TO DATE LESS 1% RETAINAGE LESS PREVIOUS PAYMENTS PARTIAL PAYMENT NO. 7 . $ $ $ 1.23 2.25 1.60 $ 9,281.58 $ 3,386.25 $ 128.00 $ 4,160.00 $ 1,520.00 $ 37.50 $ 4,160.00 $ 1,520.00 $ 37.50 $ 76.50 $ 306.00 $ 3.24 $ 45.36 $ 480.00 $ 720.00 $ 642.00 $ 642.00 $ $ 860.00 65.63 $ $ 860.00 0.00 $ 42.00 $ 0.00 $~~~~~~~~~ $775,495.73 $ 7,754.96 $736,720.94 $ 31,019.83 The original bid amount for this project was $810,860.07. The total of all work completed to date is 96% of the original bid amount. We therefore recommend Partial Payment No. 7 be made to Latour Construction Inc., 2134 Co. Rd. 8 NW, Maple Lake, MN 55358, in the amount of $31,019.83. . . If you have any questions, please do not hesitate to contact me. Sincerely, MEY~N. INC. Ronald Geurts Project Engineer cc: 5-93124 Latour Construction Inc.