Loading...
1994-07-22 Payment DATE KENCO CONSTRUCTION, INC. DESCfx I PT I ON 1092 07/22/94 1092 . ~UV \,;\ l G' \A i l " \ 'qJ'i/; ,)-' " /0." I I f' '\ \.~,I\ ..JP r 1",'1\ . j I vv" '.1 TOTALS .MOUNT 11425.51 11426.61 ADJLJSTMENTS 0.00 0.00 03 07 RET~~ leE DISCOUNTS NET AMOUNT 0.00 0.00 114i:::5.61 0.00 TOTAL DUE 0.00 11426.51 7# MEYER-ROHLIN, INC. ENGINEERS-LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn.55313 Phone 612-682-1781 . . July 11, 1994 City of Albertville c/o Linda Houghton, Clerk PO Box 131 Albertville, MN 55301 PROFESSIONAL SERVICES RENDERED: RE: parkside Addition utilities & Streets Engineering staff time for staking, inspection, supervision and as-built information for month of June, 1994: 2-man Drafts- Survey Date Eng. I Eng. II Insp. Crew man Aide 06/01/94 5.25 10.5 06/02/94 1.5 8.75 06/03/94 2.25 13.0 06/04/94 13.5 06/06/94 1.0 7.5 06/07/94 1.0 4.0 2.5 06/08/94 2.0 1.5 06/09/94 1.0 .25 9.5 06/10/94 .5 7.75 06/13/94 1.5 1.5 12.25 8.0 .25 06/14/94 9.5 4.5 .25 06/15/94 1.0 1.25 8.5 1.5 06/16/94 .75 6.5 06/17/94 4.25 5.0 3.0 06/20/94 .5 1.0 8.0 06/21/94 1.5 5.0 2.75 06/22/94 2.0 5.0 .5 06/23/94 1.0 12.5 6.5 06/24/94 1.5 7.0 1.5 3.0 06/25/94 4.5 06/28/94 1.0 .75 06/29/94 .5 2.0 06/30/94 1.0 6.0 9.5 26.0 149.75 27.5 24.5 .5 6:3 </;& -tJ. ~ Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor ... . Page 2 City of Albertville July 11, 1994 Engineer I: 9.5 hrs @ 24.04 x 2.75 = Engineer II: 26 hrs @ 23.37 x 2.75 = Inspector: 149.75 hrs @ 14.50 x 2.75 = 2-man crew: 27.5 hrs @ 24.50 x 2.75 = Draftsman: 24.5 hrs @ 19.00 x 2.75 = 5urv. Aide: .5 hrs @ 17.00 x 2.75 = TOTAL FOR JUNE = 5-93124 . $ 628.05 1,670.96 5,971.28 1,852.81 1,280.13 23.38 $~~~~~~;,~~