2004-05-19 Punch List
PUNCH LIST
OWNER
CONTRACTOR
SEH NO.
OWNER NO.
PROJECT
City of Albertville
Kuech1e Underground, Inc.
A-ALBEV 0212
N/A
DATE OF CURRENT ISSUE
DATE OF ORIGINAL ISSUE
SUBSTANTIAL COMPLETION
FINAL COMPLETION
05/19/04
05/19/04
2003 Albert Villas 6 Addition, A1bertville,.MN
Below is a list of items, which must be completed or corrected prior to final acceptance of the subject project. A
completion of these items does not in any way relieve the Contractor of the responsibility to complete the project
in accordance with all Contract Documents.
Item Date Date
No. Item Reviewed Comments Accepted
1. Add nut riser to hydrant gate valve at end of
49th Court.
2. Add nut riser to hydrant gate valve at
intersection of 49th and Kass1e.
Make sure all tracer wires and hydrant flags
3. are on hydrants and touch up paint as
needed.
4. Clean storm sewer as needed.
5. Touch up grout on sanitary sewer and storm
sewer rings as needed prior to wear course.
Replace broken curb and sidewalk prior to
6. wear course. Call RPR to arrange walk-
through.
7. Raise gate valve through blacktop at Lot 7,
Block 1.
8. All hydrants need gate valve nut risers.
9. Raise gate valve for hydrant at Lot 3, Block
1.
10. Top section on gate valve box broken at
hydrant at Lot 25, Block 7.
11. Line looks plugged between MH 10 to MH
9. Verify and correct if needed.
12. Find gate valve box for hydrant at Ka1enda
and 48th intersection.
13. No nut riser in gate valve at Kalenda and
48th street intersection.
14. No nut riser at gate valve at Kalenda
Avenue at St. Michael/Albertville line.
15. Ensure all gate valves have nut risers
installed and all gate valves work.
16. Pond inlets are washing out. Re-grade and
riprap.
1
Item Date Date
No. Item Reviewed Comments Acceuted
Adjust manholes and gate valves prior to
wear course. If wear course is not put on
17. before snowfall, ensure all manholes, gate
valves and cross gutters are ramped or
lowered for snow plows.
18. Place wear course.
19. Restore maior washout at entrance culverts.
20. Clean out all pickholes after wear course is
placed.
Remove all silt fence once sufficient
21. vegetation is established. Contact engineer
prior to removal to ensure sufficient
vegetation is established.
PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE
COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIME) OF THE
AGREEMENT.
REMARKS:
Issued By: Russ Bly
Title: RPR
djg
c: Pete Carlson SEH
Jim Schulz, SEH
Russ Bly, SEH
Larry Kruse, City of Albertville
John Middendorf, City of Albertville
Rick Lewandowski, Edina Development
Craig Schlichting, Plowe Engineering, Inc.
Matt Davich, E.G. Rud & Sons, Inc.
Kuechle Underground, Inc.
u:lalalbev\021200lspecs\punchlist.doc
2
PUNCH LIST
OWNER
CONTRACTOR
SEH NO.
OWNER NO.
PROJECT
City of Albertville
Kuechle Underground, Inc.
A-ALBEV 0212
N/A
DATE OF CURRENT ISSUE
DATE OF ORIGINAL ISSUE
SUBSTANTIAL COMPLETION
FINAL COMPLETION
05/19/04
05/19/04
2003 Albert Villas 6 Addition, Albertville, MN
Below is a list of items, which must be completed or corrected prior to final acceptance of the subject project. A
completion of these items does not in any way relieve the Contractor of the responsibility to complete the project
in accordance with all Contract Documents.
Item Date Date
No. Item Reviewed Comments Accepted
1. Add nut riser to hydrant gate valve at end of
49th Court.
2. Add nut riser to hydrant gate valve at
intersection of 49th and Kassle.
Make sure all tracer wires and hydrant flags
3. are on hydrants and touch up paint as
needed.
4. Clean storm sewer as needed.
5. Touch up grout on sanitary sewer and storm
sewer rings as needed prior to wear course.
Replace broken curb and sidewalk prior to
6. wear course. Call RPR to arrange walk-
through.
7. Raise gate valve through blacktop at Lot 7,
Block 1.
8. All hydrants need gate valve nut risers.
9. Raise gate valve for hydrant at Lot 3, Block
1.
10. Top section on gate valve box broken at
hydrant at Lot 25, Block 7.
11. Line looks plugged between MH 10 to MH
9. Verify and correct if needed.
12. Find gate valve box for hydrant at Kalenda
and 48th intersection.
13. No nut riser in gate valve at Kalenda and
48th street intersection.
14. No nut riser at gate valve at Kalenda
A venue at St. Michael! Albertville line.
15. Ensure all gate valves have nut risers
installed and all gate valves work.
16. Pond inlets are washing out. Re-grade and
riprap.
1
Item Date Date
No. Item Reviewed Comments AcceDted
Adjust manholes and gate valves prior to
wear course. If wear course is not put on
17. before snowfall, ensure all manholes, gate
valves and cross gutters are ramped or
lowered for snow plows.
18. Place wear course.
19. Restore major washout at entrance culverts.
20. Clean out all pickholes after wear course is
placed.
Remove all silt fence once sufficient
21. vegetation is established. Contact engineer
prior to removal to ensure sufficient
vegetation is established.
PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE
COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIME) OF THE
AGREEMENT.
REMARKS:
Issued By: Russ Bly
Title: RPR
djg
c: Pete Carlson SEH
Jim Schulz, SEH
Russ Bly, SEH
Larry Kruse, City of Albertville
John Middendorf, City of Albertville
Rick Lewandowski, Edina Development
Craig Schlichting, Plowe Engineering, Inc.
Matt Davich, E.G. Rud & Sons, Inc.
Kuechle Underground, Inc.
u:lalalbevl021200lspecs\punchlist.doc