Loading...
2010-10-30 Wetland Certificate of ComplianceCompliance is reached when, all required signatures below are complete, at which time monitoring ofreplacement wetland is complete. The landowner is perpetually responsible for the success of the replacement wetland as outlined in the Declaration of Restrictions and Covenants for Replacement Wetland. Escrowed funds, if any, will be returned after requirea anmrat monitoring reporr(V nave Veen recervea ana correcrive measures nave Veen taxer. APPLICANT INFORMATION Minnesota Development Agency (Matt Froelich) Kjolbaug Environmental Service Company Name(s) of Applicant Name(s) Authorized Agent 201 W_ 7tb Street 26105 Wild Rose Lane Street Address Street Address Monticello, MN 55362 Shorewood, MN 55331 City, state, ZIP City, State, ZIP I(763)245-4146 ( ) (452)401-8757 ( ) Check one: ®Replacement Plan: Project Number: 2005-001 ❑Banking Plan: Account Number: Project Location: 114 1/4 Project Name: Hunters Pass 1/4 NE T12IN R 24W S 36 UTM Coordinates: X: Y: County NamelNumber: Wright County Major Watershed Name/Number Minnesota River (St. Cloud) (For LGU and TEP use only) MONITORING COMPLIANCE FOR REPLACEMENT AND BANKING PLANS ®Year One Report Received on April, 06 (Date) ®Year Three Report Received on Feb. 0 (Date) ❑Final Report Received on NIA (Date) E.Year Two Report Received on Jan., 07 (Date) ❑Year Four Report Received on NIA (Date) ®The Technical Evaluation Panel (TEP) members certify by signature below that replacement is fully functional prior to five years following construction of the replacement plan and that a complete five years of monitoring is not necessary_ (LGU write ANot Applicably on lines for annual reports which were not deemed necessary.) t� i y ` — 1 (Sign re of GU e r entative on TEP) ( te) (Signature of SWCD Representative on TEP (Date) c� , mot.-�--lb ( ignathre of BWSR Representative on TEP) (Date) ®LGU certifies by final signature below that a qualified LGU representative has performed a final site inspection and finds that monitoring of the replacement site or banking site has been completed as required, any problems ' identified have been adequately addressed and remedied, and the goal of the replacement or banking plan has been achieved. C*m,.,7Kv-� f 0 3 0'—.,70/a (LOU Offici t ignature) (Date) Page I of I BWSR, Form_WCA_Replacement_15(Cert Compl)_doe (April2003)