Loading...
2010-10-30 Wetland Replacement/Mitigation (2)BOL_TON 8L M i-7= N K , i NC® Consulting Engineers & Surveyors it 7533 Sunwood Drive NW, Suite 206 • Ramsey, MN 55303 Phone (763) 433-2851 • Fax (763) 427-0833 www.6olton-menk.com October 30, 2010 Mr. Matt Froelich Mr. Joe Huber Minnesota Development Agency Minnesota Development Agency 201 W. 7th Street 9766 Fallon Avenue Monticello, MN 55362 Monticello, MN 55362 RE: Hunters Pass Development Wetland Replacement/Mitigation City of Albertville BMI Job No. T15.021657 Dear Matt and Joe: Enclosed for your records is the signed Minnesota Wetland Conservation Act Certificate of Compliance for Wetland Replacement and/or Banking Plan for the Hunters Pass Development in Albertville. This certifies that the wetland replacement is fully functional and the goal of the wetland mitigation/replacement has been achieved prior to five years, following the construction of the replacement plan and that a complete five years of monitoring is not required. If you have any questions please feel free to call at anytime. Sincerely, Bolton & Menk, Inc. /Z*(/ Adam Nafstad Albertville City Engineer Enclosure AN:tj Cc: Andy Beaudet, Army Corps of Engineers (w/enclosure) Mark Kholhaug, Kjolhaug Environmental service Company. (w/enclosure) Colleen Allen, Wright County SWCD, (w/enclosure) Lynda Peterson, Board of Water & Soil Resources, (w/enclosure) Larry Kruse, City of Albertville, (w/enclosure) Todd M. Javens, Bolton & Menk, Inc., (w/enclosure) DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer. Compliance is reached when all required signabres below are complete, at which time monitoring ofreplacement wetland is complete. The landowner is perpetually responsible for the success of the replacement wetland as outlined in the Declaration of Restrictions and Covenants for Replacement Wetland. Escrowed funds, if any, will be returned aRer reouired annual monitortne reports) have been recsW ed at d corrective measures have been taken. innesota Development Agency (Matt Froelich) une(s) of Applicant 1 W. 7a' Street :eet Address onticello, MN 55362 ty, State, ZIP 53)245-4146 C ) Kjolbnug Xnvironmental Service Company Narne(s) Aothotized Agent 26105 Wild Rose Lane Street Address Shorewood, MN 55331 City, State, ZIP (952)401-8757 Check one: Replacement Plan: Project Number: 2005-001 Project Name: Hunters Fars ❑Banking Plan: Account Number: Project Location: 1/4 1/4 ]A NL T121N R 24W S 36 UTM Coordinates: X: IY_ CountyName/Number: Wrlpht County Major Watershed Name/Number ( inrlegola River (Si, Cloud) (For LGU and TEP use only) MONITORING COMPLIANCE FOR REPLACEMENT AND BANKING PLANS ®Year Ono Report Received on ARAl, 06 (Date) ®Year Three Report Received on Feb., 04(Date) ❑Final Report Received on N/A (Date) ZIYear Two Report Received on Jan.. 07 (Date) []Year Four Report Received on N/A ___(Date) MThe Technical Evaluation Panel (PEP) members testify by signature below that replacement is fully functional prior to five years following construction of the replacement plan and that a complete five years of monitoring is not necessary. (LGI1 write ANot Applieabte= on lines for annual reports which were not deemed necessary.) /7 Alin (Sign re of GU Re r entative on TEN) ( te) (Signature of SWCD Representative on TEP (Date) ( igna re of B WSR Representative on TEP) (Date) 9LGU certifies by final signature below that a qualified LGU representative has performed a final site inspection and finds that monitoring of the replacement site or banking site has been completed as required, any problems ' identified have been adequately addressed and remedied, and the goal of the replacement or banking plan has been achieved. 10-30--7010 (LGU Ofiici ignature) (Date) Page 1 of I BWSR_Eorm WCA_Reptaeement.15(Cert Compl).doc (Apri12003)