Loading...
2005-07-01 LOC Engineering Review for Release Jt.. SEH ~O.t. JlJL ~ tV'4'b 5 lOOS July 1,2005 RE: Albertiville, Minnesota Kollville Estates 2nd Addition SEH No. A-ALBEV02l1.00 Scott Dahlke Quality Site Design, LLC 3600 Holly Lane N.,Suite 100 Plymouth, MN 55447 Dear Mr. Dahlke: In response to your request for a release of the letter of credit for the subject project, SEH conducted a final walkthrough of the site on June 29, 2005. Before we can recommend release of the surety, the following items must be addressed: 1. All storm sewers in the development require cleaning. If the storm sewer is jetted, all debris in the system must be collected before it reaches the stormwater pond. 2. There are numerous locations where curb and gutter is cracked, broken, or settled. Damaged sections of curb needs to be replaced. 3. Construction debris deposited in Winter Park is to be removed. If the work identified above is not completed by August 1, 2005, the City will arrange to perform the work and will draw from the letter of credit to cover the cost of the work. Please call me at 651.490.2147 if you have questions. Sincerely, R~:g~ Project Manager JL c: Larry Kruse, City Administrator Mike Leuer, Leuer-Munsterteiger Properties x:\ae\albev\common\dahlke070 105 .doc Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul. MN 55110-5196 SEH is an equal opportunity employer I www.sehinc.com I 651.490.2000 I 800.325.2055 I 651.490.2150 fax