July 1,2005
RE: Albertiville, Minnesota
Kollville Estates 2nd Addition
SEH No. A-ALBEV02l1.00
Scott Dahlke
Quality Site Design, LLC
3600 Holly Lane N.,Suite 100
Plymouth, MN 55447
Dear Mr. Dahlke:
In response to your request for a release of the letter of credit for the subject project, SEH
conducted a final walkthrough of the site on June 29, 2005. Before we can recommend release of the
surety, the following items must be addressed:
1. All storm sewers in the development require cleaning. If the storm sewer is jetted,
all debris in the system must be collected before it reaches the stormwater pond.
2. There are numerous locations where curb and gutter is cracked, broken, or settled.
Damaged sections of curb needs to be replaced.
3. Construction debris deposited in Winter Park is to be removed.
If the work identified above is not completed by August 1, 2005, the City will arrange to perform the
work and will draw from the letter of credit to cover the cost of the work.
Please call me at 651.490.2147 if you have questions.
Sincerely,
R~:g~
Project Manager
JL
c: Larry Kruse, City Administrator
Mike Leuer, Leuer-Munsterteiger Properties
x:\ae\albev\common\dahlke070 105 .doc