Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
1985 Assessed Project Costs
1985-1 IMPROVEMENT PROJECT ALBERTVILLE, MINNESOTA BEAUDRY'S 2ND ADDITION ASSESSED PROJECT COSTS Total Construction Cost $ t:) Total Administrative Costs (Eng., 'Legal, bondln,g, & f-i.scal) TOTAL, PRUiECT TOTAL ASS1SSEDI AM71UNT L OTS IMPROVED BUILDABI,�.� LOTS 42 Ti ASSESSMENT PER Bi_,!L,DABIE' Sifl.'E 4,978.63 FEASIBILITY STUDY AMOUNT $238, 97 2.22 BREAKDOWN OF COSTS Sanitary Sewer TMpj-CVE;:jjjej,.,tS Sewer Main C oil s t ruc 1, -1 o n CC, Li Administr,ative 8, C) U Buildable Lots. 42 As s e s s rnen t, $1 P71 .43/iol, Sewer Services Constructiori Cost $ 3 , 4 1 Administrative Cc)sl-s, $ I , b- o•o Bu.1.1dable Loll-,s: 4 Assessment; 240. 48/lot. Watermain Improvement_ Watermain Construction Cost Administrative Casts $ 42, 80.00 $ 8,480.00 $ �,o, 860. o0 Buildable Lots: 42 1,112''10.9 /1 ?t• Assessment: �_ _..- Water Serv3.ces Construction Cast Administrati.vE. Costs $ 91t.,80.00 $00 $ 1.4.,620.00 Bu ldable Lots: 42 Assessment,: . 67/1ot Storm Sewer & street Improvements Construction Cost, Administrative Cott Builda�l. tots : Assesslyien,:: Lift Station & Forcem aiinn Assessed Cast: Buildable L,ot.:., : Assessment.:. Storm. Sewer Extension Assessed. Cost: Buil.dable Lots : Assessment: $, 4 , 287.0o $�8, 963.00 42 $,14, 336.76 42 341..3�)/lot, $ <i, c53J- 44 42 $ i 'ti1 .79/lot