Loading...
1986-07-07 Feasibility Utility/StreetMEYER-ROHLIN, INC. ENGINEERS -LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn.55313 Phone 612-682-1781 July 7, 1986 Honorable Mayor & City Council c/o Maureen Andrews, Administrator City Hall Albertville, Minnesota 55301 Re: Feasibility Study-Utility/Street Improvements Barthel Manor Maple Hills Dear Members of the Council: Description - Barthel Manor As requested, we have conducted a feasibility study of utility improvements to the following area within Barthel Industrial Park as indicated on the attached sketch: - 57th Street N.E. from the East edge of the Beaudry's Second Addition Plat to Barthel Industrial Drive. - Lannon Circle from 57th Street N.E. South to end of the cul-de-sac. The study area consists of properties as indicated in Figure 1. Proposed improvements, to be addressed in more detail, consist of sanitary sewer, watermain, storm sewer and streets. Sanitary Sewer Improvements The proposed sanitary sewer consists of 8 inch collection lines as indicated in Figure 2. The eventual discharge point of the collection system is at the lift station in Barthel's Industrial Park. Currently this lift station pumps to an on -site treatment and disposal system. Upon completion of the new treatment facility, the lift station will be modified to pump to the new facility. I anticipate that the new facility will be on line prior to any hook-up which will occur. Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor The estimated cost of the proposed sanitary sewer improvements is $15,600. This estimated cost includes construction, engineering and administrative costs. There are 15 benefited lots adjacent to this proposed improvement. Watermain Improvements Proposed watermain improvements are as shown in Figure 3. This project will provide excellent looping for existing watermains as well as provide the necessary distribution to the development area. The estimated cost of the proposed watermain improvements is 22,800. This estimated cost includes construction, engineer- ing and administrative costs. There are 15 benefited lots adjacent to this proposed improvement. Storm Sewer Improvements Proposed storm sewer improvements are indicated in Figure 4. The estimated cost of the proposed improvements is $6400 including construction, engineering and administrative costs. There are 15 benefited lots improved by this proposal. Street Improvements The area being considered for street improvements are all the streets within the study area as indicated in Figure 1. Two forms of street construction are to be analyzed, one being phased construction with only gravel base to be installed with the utilities; the other to be full street construction with curb and gutter and bituminous surfacing. The portion of the area cross -hatched in Figure 1 has access to 55th Street N.E., which currently has a gravel base and is scheduled for full street construction. Therefore, these adjacent properties will not be affected by street improve- ments to the streets within this study. The costs associated with the street improvement alternatives are as follows: Full Street Construction - to consist of gravel base, concrete curb and gutter, bituminous surfacing and boule- vard restoration. The estimated cost of these improvements to the study area minus the cross -hatched area in Figure 1 is $52,800. Gravel Base Construction Only - this phased construction would provide a driving surface during the development phase with eventual curb and gutter and surfacing to be completed later. The estimated cost of the gravel base in the cross -hatched area is zero and $21,200 for streets in the remainder of the study area. Previous Improvements As stated previously, there is a portion of the study area which borders 55th Street N.E. This street has utility improvements completed and is scheduled for full street construction. Summary The following is a summary of the costs as previously presented. Sanitary Sewer Improvements Estimated Cost $15,600 Benefited Lots 15 Estimated Cost Per Lot $ 1,040 Watermain Improvements Estimated Cost $22,800 Benefited Lots 15 Estimated Cost Per Lot $ 1,520 Storm Sewer Improvements Estimated Cost $ 6,400 Benefited Lots 15 Estimated Cost Per Lot $ 430 Street Improvements Estimated Cost Full Street $52,800 Gravel Base $21,200 Cost per lot will be depend on assessment policy concerning cul-de-sacs and corner lots. The fore stated proposals are feasible and would result in an improvement to the abutting benefited properties. Description - Maple Hills As requested we have also conducted a feasibility study of utility improvements to the following area within Barthel Industrial Park as indicated on the attached sketch. - Eight lots bordering Lannon Avenue as indicated on the attached sketch. The study area consists of properties as indicated in Figure *I. Proposed improvements to be addressed in more detail, consist of sanitary sewer, watermain, strom sewer and streets. Sanitary Sewer Improvements The proposed improvements consist of connecting to an existing 8 inch collection line. The estimated cost of the proposed sanitary sewer improvement is $2000. This estimated cost includes construction, engineering and administrative costs. There are 8 benefitted lots adjacent to this prepared improvement. Watermain Improvements Proposed watermain improvements consist of connecting to the existing 6" D.I.P. watermain. The estimated cost of the proposed watermain connections is 3900. The estimated cost includes construction, engineering and administrative costs. There are 8 benefitted lots adjacent to this proposed improvement. Storm Sewer Improvements Proposed storm sewer improvements have already been completed in another project. Street Improvements The street which the 8 lots are adjacent to currently has a gravel base and is scheduled for full street construction this year. Previous Improvements As stated previously, this study area borders Lannon Avenue. This street has utility improvements completed and is scheduled for full street construction. Summary The following is a summary of the costs as previously presented. Sanitary Sewer Improvements Estimated Cost $2,000 Benefited Lots 8 Watermain Improvements Estimated Cost $3,900 Benefited Lots 8 Storm Sewer Improvements Estimated Cost Completed Benefited Lots 8 Street Improvements Estimated Cost Full Street Sheduled to be completed on another job Gravel Base Completed Cost per lot will be depend on assessment policy. The fore stated proposals are feasible and would result in an improvement to the abutting benefited properties. Respectfully Submitted, MTR-ROHLIN, C. Barr John on Project Engineer BDJ:kp cc:E-8601-F .•00" 30 STUDY AREA .. F i• '61 BOUNDARY BARTHEL MANOR -� 49 •-�° U y'� .94 6!1* IF ow I- 1p4 a 11,91. 106.00 00 30'58-' E 09.82 49' 12- E 3'T X 0 uii 0 -o 96.0 71 _64 .......... FIGURE ONE PROPOSED 811 SAM FIGURE TWO PROPOSED 6 0 4*qg. as- wocre is S.Te IN 106.00 ago 301581* E I S89,30-se ........... 49.12. E� FIGURE THREE FIGURE FOUR z 49 4 'o _ JO / Ads• a?s ✓ t' y`'��' / o Or for I el ocR [ !•R rM[t•! RousTRIAL r►R[ COMYOw CORNER orTwEEw / LOT AMO LOT = ) a •—_a 'a ARAa 1C LCALL IN IEET - • 0[II•Tra iwe• ...Y., r0yw0 • OewOT[! -om rOMYYEwT set AfEYER-ROHLIN,M fCKERS-I.4I111110aLWVeyo = "W""Arm• ON TWIG e[AIM, •reTte Ill On Gaeta m Twe n[Ce[o ►LAT !• eA•Tr[L•e wAer•TRL&L ►eIn OwAMrC[ An0 YTILITT fA![w[w TT AK SMOwa TMel: 09Iwe ! rveir w.oTr Aw0 A0101wIir LOT LI a are IO sE[r r wrTw Awe AOJelnre'!Tw[[T w1•Yr d �T Ar0 OLAT 00e0064T• YwlL s[ OTr(•wlse notes FIGURE FIVE