Loading...
2005-11-23 2004 Prairie Run SEH � ` ' ) � ►� � � � � � � �Q��' (y�� � �� November 23 2005 RE: Albertville Minn , , esota 2004 Prairie Run SEH No. A-ALBEV0409.00 Mr. Mike Couri Couri, MacArthur& Ruppe, P.L.L.P. 705 Central Avenue East PO Box 369 St. Michael, MN 55376 Dear Mr. Couri: At the request of the City of Albertville, SEH has prepared a summary of issues to be resolved by the developer for the residential portion of the Prairie Run project. After several recent rainfall events, it has been discovered the grading plan for the site does not account for the 100-year flood elevation (calculated at 951.5 by Wright County) of an existing box , culvert where County Ditch No. 9 passes under Jason Avenue. The location of the box culvert is in the southwest corner of the development and County Ditch No. 9 is the outlet for storm water runoff from the site. Using the 100-year flood elevation calculated by Wright County, we have determined there are a number of lots in the Prairie Run development that do not comply with the City's ordinance requiring that the lowest opening elevation of a building be at least 2 feet above the 100-year flood elevation. The lots that do not comply are Lots 5-28 and Lots 33-34 of Block 2. Of the lots identified, Lots 7, 14-16, 18-20, 22, and 26-28 of Block 2 have houses which either are finished or are under construction. The City is requesting resolution of the following issues: 1. For all lots that are currently vacant and that do not comply with the ordinance, a revised grading plan must be prepared by the developer and submitted for City review and approval. The City will not issue any new building permits until this condition is met. 2. For all non-complying lots where a building permit has been issued but a certificate of occupancy has not been issued, the developer shall submit a mitigation plan to bring the buildings into compliance with the City ordinance. 3. For all non-complying lots where a certificate of occupancy has been issued, the developer shall submit a mitigation plan to bring the buildings into compliance with the City ordinance. ' ' Mr. Mike Couri ` November 23,2005 Page 2 As an alternative to mitigating existing non-compliance, Albertville staff has discussed that the Wright County's 100 year flood elevation may be a very conservative elevation considering it did not include any storm water ponding or reflect the City's 50% post run-off requirement. The City of Albertville would entertain the Developer financing a study to have the City Engineer verify the County's 100 year flood elevation or determine a new 100 year flood elevation for this area. A preliminary estimate for this study is $7,500. In lieu of depositing these funds the City would also accept a letter extending the Developer's Letter of Credit on file to secure payment for this study. Please prepare a letter notifying Gold Key Development and their engineer, Hedlund Engineering, of these issues and of their obligation to resolve them. Please call me at 651.490.2147 if you have questions. Sincerely, Robert L. Moberg, PE Project Manager nm c: Larry Kruse, City Administrator Jon Sutherland, City Building Official Mark Kasma, City Engineer x:�ae\aibev\040900\word\couri 112305.doc