2018-03-05 Visioning Update
2018 VisioningUpdate
Introduction
The City of Albertville previously undertook a Visioning Study as part of their
Comprehensive Planning Process. The City periodically reviews the Vision
Study to be sure that it accurately reflect the goals of the City and City
Council. The key issues and priorities are reexamined and reevaluated to see
whether they have been effectively addressed or to identify on-going work
that still requires attention.
This update includes an examination of the long-range land use plan to
determine if any changes are needed to reflect current market conditions,
development inquiries or local land use needs. The current plan established
in 1996 and amended in 2008, 2012, 2014 establishes land use patterns that
recognizes that Albertville serves extraterritorial areas beyond its boundaries
due to freeway interchanges within the city. In examining the Vision Study,
Staff has identify the land use patterns of the adjoining communities to aid in
the review of the Albertville Vision Plan.
2018 VisioningUpdate
3
Small Town AtmosphereIndustrial LandUses
Nuisance issues
Industrial traffic
Pace of Growth
Marketing of existing commerciallots
Keeping up with aging infrastructure
Streets & utilities
Economic Development
Marketing
Residential LandUses
Financialincentives
Housing condition
Publicimprovements
Outdoorstorage
Infilldevelopment
No more multi-familydevelopment*PublicFacilities
Trail & sidewalkconnectionsOld City Hall
Soccer facility
Icearena
Commercial Land Uses
Waste treatmentplant
Development quality
Ongoing maintenance of streets&
Current land use patterns*
utilities
Access to commercialareas
Cityparks
Number of older vacant buildings
Central Business District/MainSt.
Small TownAtmosphere
4
Goal 1: Maintain and protect Albertville’s small town atmosphereand
identity through long rangeplanning.
Enhance community gateways (I-94 Ramps
•
andCBD)
Attractiveneighborhoods
•
High quality commercial sites andbuildings
•
Streetscape and redevelopment ofHistoric
•
MainStreet
Implement the 2011 Trail SystemPlan
•
Cedar Creek Golf Course as an enhanced
•
communityamenity
Community volunteerism, civicorganizations,
•
communityevents
Pace ofGrowth
5
Goal 1: Manage growth that provides quality development and doesnot
fiscally burden thecommunity.
Infill development (qualityhomes)
•
Patient with future land use buildout
•
New residential development pays for its owninfrastructure
•
Maintain current commercial and industrial land use patterns andzoning
•
Examine redevelopment opportunity on a case by casebasis
•
Five Year Capital ImprovementPlan
•
Pace ofGrowthcont.
5
Goal 2: The Vision Study Policies and Proposed Land Use Plan guide the
City's desired land uses and development patterns. However, the City
wishes to be open to potential land uses and/or development options
that may not be in line with the stated ambitions of this VisionStudy.
The Vision Study policies and land uses will represent the expressed goals of the City,
•
however, land use and/or development options that are in conflict with the Vision
Study may pursue City Council feedback prior to submitting a development
application with the submission to concept plan and narrative to the City Council.
Concept Plan submissions must be received two weeks prior to a Council meeting
•
where the item is to be considered to allow the concept plan and narrative to be
included in the Council packet and to allow time for Council consideration.
All concept plans will be weighed against the policies of the Vision Study and changing
•
conditions within the community to determine if the new project has merit and
benefit.
The Council discussion and direction on a concept plan shall be advisory only and
•
does not represent any project approvals.
Residential
6
Goal 1: Maintain and build attractive residentialneighborhoods.
Promote quality infilldevelopment
•
Codeenforcement
•
RentalOrdinance
•
Vacant BuildingOrdinance
•
Zoning enforcement –outdoorstorage
•
City Codenuisance
•
Point of Sale –futureconsideration
•
Driveway permits –futureconsideration
•
CIP
•
Residential
7
Goal 2: Provide a variety of housing options to meet the life cycle needsof
Albertvilleresidents.
Pursue and promote age restrictedhousing
•
Limit future multiple family developmentto
•
existing guided and zonedlocations*
Enforcement of Rental Ordinance, promote
•
reinvestment in multiple family housing
stock
High design guidelines for multiplefamily
•
development
Exteriorfinishes
–
Garage
–
Parking
–
Openspace
–
Commercial
8
Goal 1: The City will continue to promote commercial development by the
City taking advantage of its access to Interchange 94 and the growing
population of Albertville and its adjoiningcommunities.
Follow the Future Land Use Plan to direct
•
commercial development*
Patient with infill/quality site and buildingdesign
•
Support reuse of older buildings/enforce sprinkler
•
requirements of Regulation1306
Investigate site and street access alternatives for
•
commercial locations
CBD -streetscape/redevelopment/CentralPark
•
Promote newbusiness:
•
Hospitality
–
Big BoxRetail
–
LumberYard
–
Industrial
9
Goal 1: Promote continued industrial development in order to expandlocal
employment opportunities and the City’s taxbase.
Follow Land Use Plan to guide future industrial
•
landuse
Market City ownedlots
•
Open lines of communication with location
•
industries
Continue to examine industrial zoningstandards
•
Examine opportunities to open up new properties up for industrial growth. (i.e.
•
Marlowe Avenue Street and Utility improvements).
EconomicDevelopment
10
Goal 1: The Vision Committee identified commercial and industrial growth as
a priority for the community. The City will become more aggressive in its
economic development promotionefforts.
Define land use areas forcommercial
•
& industrialgrowth
Economic DevelopmentStrategies:
•
Advertising
•
Taxes, fees,charges
•
In placeexpansion
•
Financial incentive (tax abatement,TIF)
•
Communicate
•
Preferredbusinesses
•
Capitalimprovements
•
PublicFacilities
11
Goal 1: Ensure public facilities are designed and constructed to address the
City’s long range needs, facilitate development, and contribute to the quality
of life inAlbertville.
Pursue I-94 improvement to six
•
lanes through Albertville.
Complete Phase II of the I-94/CR 19ramp
•
Upgrade CR 19 –north ofI-94
•
Waste Treatment Plan improvements/
•
New Sewer Main along CR 19 to
MississippiRiver.
Complete Ice ArenaExpansion
•
Share facilities and services with
•
neighboringcities.
Work with local Sport Associations to provide programs and facilities promote
•
recreational programs and encourage active life styles.
Finance
12
Goal 1: Maintain Albertville as a financially sound, self-sustainingcommunity.
Balance expenditures withrevenues
•
Allocate cost to servicesusers
•
CIP
•
Fee/charges
•
Special assessments assign cost tobenefited
•
properties
Pursue grants and loans
•
Grow the City per the Future Land UsePlan*
•
Inventory conditions of sheets and utilities for planning and maintenance of sheet
•
and utilities that are in poor condition
Albertville 2018 Land Use
Land Use Plan
Because of the presence of two I-94 access points, Albertville is in a position to serve
as a commercial hub for its own residents as well as for portions of surrounding
communities such as Saint Michael and Otsego. Capitalizing on commuters who travel
through Albertville is an opportunity for the city to consider.
The extraterritorial areas expand Albertville’s market reach.
•
The development of these extraterritorial areas impact Albertville’s land use
•
planning.
Albertville has business intercept advantages towards commercially serving the
•
extraterritorial area due to traffic patterns and commuter convenience.
The following maps identify the extraterritorial areas in which commuters live, who
•
likely will use CR 19, I-94, or CR 37 to travel between work and home.
This section outlines the extraterritorial areas of impact, and also provides a
•
forecast for new housing assets for Albertville based on the Proposed Land Use
map from the 2030 Comprehensive Plan.
Albertville 2011 Proposed Land Use
Development Forecast
RESIDENTIAL DEVELOPMENT
Acres of Agricultural or Vacant
Single Family (2-2.5units per acre)
Gross AcresNet acresUnits
740.6
Land in 2011:
191 145290 -360
Medium Density (6 –8 units per acre)
191 Acres
GrossAcresNet AcresUnits
10 Acres
Planned for single
10.08.0 48 -64
Planned for medium family residential
density residential development
development
COMMERCIAL DEVELOPMENT
254.83 acres
In 2011, Albertville had of industrial/commercial land. In its
815.3
proposed land use map, commercial/business/industrial uses made up
acres
.
Otsego Land Use
3
1
4
2
65
Table 2
Table 1
Otsego Housing Units Near Albertville
Table 1: Dwelling Units
Range of Housing Units
Otsego Housing Unit Forecasts Within One Mile of Albertville
by Area and Zoning
Area 1234 -250
Gross Net Projected
AcresAcresUnits
Area 21,120 -1,310
District
Area 1
Area 31,029 -1,223
Area 41,225 -1,435
Land Uses:
Area 51,256 -1,316
Table 2: Range of
Low Density Residential403264 -80
Area 6632 -742
Medium Density Residential4234170
Units and Population
Area 1: Total Housing Units234 -250
Totals5,496 -6,276
Estimate
Area 2
Estimate of
Population*15,194 -17,350
Land Uses:
Density Range
Low Density Residential483385770 -960
Table 3: Land Use
Gross Acres2.2 -2.8
Medium Density Residential8770350
Net Acres2.5 -3.13
1,120 -
Designations
Area 2: Total Housing Units1,310
* Using average household size from 2012-
Area 3
2016 ACS, and with a calculated 5% vacancy
of housing units
Land Uses:
Low Density Residential485388776 -970
Medium Density Residential7763253
Table 3
1,029 -
Otsego Land Use Residential Designations
Area 3: Total Housing Units1,223
Area 4
Corresponding
Land UseDensityAllowed UsesZoning
Land Uses:
Low Density Less than 3.0 Single Family dwellings.R-4A District
Low Density Residential536428860 -1,070
Low to Medium Density
Residential Large Lotdu/ac.
Residential5846185
Medium Density Residential4536180
Low Density Less than 3.0 Single Family dwellings.R-1, R-2, R-3, R-4
1,225 -
Residentialdu/ac.and R-MH Districts
Area 4: Total Housing Units1,435
Area 5
Low to Medium 3.0 to 5.0 Single family, two family and R-5 District
Land Uses:Density Residentialdu/ac.detached townhouse dwellings
Low Density Residential150120240 -300
Medium Density 4.0 to 7.0 Two family dwellings, detached R-6 District
Low to Medium Density
Residentialdu/ac.townhouse and quad or row
Residential195156624
Medium Density Residential9878392
townhouse dwelling units
1,256 -
Area 4: Total Housing Units1,316
Medium to High 5.0 to 12.0 Detached townhouse, quad or row R-7 District
Area 6
Density Residentialdu/ac. townhouse or back-to-back
Land Uses:
townhouse dwelling units, multiple
Low Density275220440 -550
family dwelling units.
Medium/High Density4032192
Area 6: Total Housing Units632 -742
St. Michael
Comprehensive Land
Use Plan
1
4
4
2
3
Table 2
Table 1
St. Michael Housing Unit Forecasts in Close Proximity to
Albertville
St. Michael Housing Units Near Albertville
Range of Housing Units
Gross Projected
AcresNet AcresUnits
Area 1750 -940
Area 1
Area 2490 -610
Land Uses:
Area 3110 -135
Low Density Residential470376750 -940
Area 4305 -380
Area 2
Totals1,655 -2,065
Land Uses:
Estimate of Total
Population*5,110 -6,376
Low Density Residential306245490 -610
* Using average household size from 2012-2016 ACS, and
Area 3
with a calculated 5% vacancy of housing units
Land Uses:
Low Density Residential6854110 -135
Area 4
Land Uses:
Low Density Residential190152305 -380
Table 1: Dwelling Units
Table 3
by Area and Zoning
St. Michael Land Use Categories
District
Land UseDensityAllowed UsesCorresponding Zoning
Rural ResidentialExisting farmsteads. No new developments in A-1, AP
this land use category
Table 2: Range of
Low Density 1.0 -3.0 du/ac.Mixture of single-family detached and R-1, R-2, R-3
Units and Population
Residentialattached units.
Estimate
Medium Density 4.0 -8.0 du/ac.Predominantly townhomes or condominiums. R-3, R-4
ResidentialCan include smaller lot detached and
attached single-family developments
Table 3: Land Use
High Density 8.0 to 20.0 du/ac.Multi-unit and multi-building developments. R-4
ResidentialHigher density townhome developments. No
Designations
greater than 4 stories
Village Mixed-Use6.0 to 12.0 du/ac.Mixture of uses. 65% residential, 25% B-2
commercial, and 10% civic. Commercial Floor
Area Ratio of .25 to 0.5.
PLANNINGAREASESTIMATEDPOPULATION
Albertville8034 -8284
Otsego15,194 –17,350
St.Michael5110–6376
Total PlanningArea 28,338 –32,010
Population
Consideration of the larger planning areas raises the following questions for
the Council.
With the limited amount of vacant land in the city does the current
•
proposed land use plan represent the Council’s vision for the community?
Is the council open to land use changes? Converting guided commercial
•
land to alternative land uses?
What is the Council’s position on medium and high density multiple family
•
housing as a future land use?
FUTURE PROJECTS:STATUS:
Transportation
I-94/CR 19 Interchange Improvements (Eastbound Ramp and C-D Road)
I-94/CR 19 Bridge Replacement
th
County Road 19 improvement from CR-37 to 70Street
•Improvement to South Ramp Intersection (sightlines, signalization)
•Improvements to Outlet Mall Intersection
th
•Right in/Right out Exchange at 69Street Alignment
thth
•Full Intersection Improvements at 69and 70Streets
•Pedestrian Bicycle elements along CR 19
th
Improvements to 50Street Between Lansing and Naber Avenues
th
Improvements to 70Street to an urban section designincluding trails.
Continue Overlay and Seal Coat program for local streets
Replace Bituminous trails with concrete sidewalks through residential
neighborhoods
Continue to implement the City’s 2011 Trail System Plan
ResidentialImprovements
Housing Maintenance Code –Point ofSale
Utilities
Planningstages
Construct a new waste treatment plant pipe outlet along CR 19 to the Mississippi
River
Extend Utilities to Green Haven area of the City
County Ditch 9 Improvements / CleanOut
Extend utilities along Marlowe Avenue to open up land for industrial growth
Signaturesneeded
Establish Agreement with St. Michael for provision of sanitary sewer to promote
growth of the High School
Inventory Conditions of existing utilities, andestablish a program for undertaking
maintenance and or replacement of utilities exhibiting poor conditions.
16
FUTURE PROJECTS:STATUS:
Public Facilities
2018
Complete Ice Arena
Storm water Pond CleaningOngoing
Implement the Central Park master plan
Develop a splash pad in Central Park
Implementimprovements to West Wind Park according to the approve concept plan.
Ongoing
Monitorall city parks to evaluate the condition of facilities for on-going maintenance and
equipment replacement.
17
FUTURE PROJECTS:STATUS:
CommercialImprovements
Economic DevelopmentIncentivesOngoing
IndustrialImprovements
O ngoing
Economic DevelopmentIncentives
StaffRecommendations/Priorities:
City OwnedLots
Old Castle Glass expansion
Zachman / LenzProperty improvements
18