Loading...
2015-04-06 CC Agenda Packet1bertvillc smdl Wng. Big Ufa. City of Albertville Council Agenda Monday, April 6, 2015 City Council Chambers 7:00 p.m. PUBLIC COMMENTS -The City of Albertville welcomes and encourages public input on issues listed on the agenda or of general community interest. Citizens wishing to address the Council regarding specific agenda items, other than public hearings are invited to do so under Public Forum and are asked to fill out a "Request to Speak Card". Presentations are limited to five (5) minutes. 1. Call to Order 2. Pledge of Allegiance — Roll Call 3. Recognitions — Presentations — Introductions 4. Public Forum — (time reserved 5 minutes) 5. Amendments to the Agenda 6. Consent Agenda All items under the Consent Agenda are considered to be routine by the City staff and will be enacted by one motion. In the event an item is pulled, it will be discussed in the order it is listed on the Consent agenda following the approval of the remaining Consent items. These items will be approved by a separate motion. A. Approve the March 16, 2015 regular City Council meeting minutes as presented (pgs 4-7) B. Approve the March 16, 2015 Joint City Council and Planning Commission meeting minutes as presented (pgs 8-10) C. Authorize the Monday, April 6, 2015 payment of claims as presented, except bills specifically pulled which are passed by separate motion. The claims listing has been provided to City Council as a separate document and is available for public view at City Hall upon request (pg 11) D. Adopt Resolution No. 2015-008 approving Corporate Signers for the City of Albertville (pgs 12-13) 7. Public Hearings — None 8. Department Business A. City Council 1). Committee Updates (STMA Arena, Planning, JPWB, Parks, Fire Board, etc) 2). Appointment to Parks Committee (Motion to appoint Larry Boller to the Parks Committee based on the recommendation of the Parks Committee.) M:\Public Data\City Council\Council Agendas\2015 Agendas\2015-04-06 CC Agenda.doc Meeting Date: April 6, 2015 Agenda Page 1 City of Albertville Council Agenda Monday, April 6, 2015 Page 2 of 3 B. Public Works/Engineering 1). 57" Street NE/Church of St. Albert Improvements (pgs 14-27) (Motion to approve Resolution 2015-009 entitled a Resolution Approving Plans and Specifications and Accepting Low Bid for the 2015 57th Street NE and Utility Improvements and Approving Right -of -Way and Construction Agreement with the Church of St. Albert.) C. City Clerk 1). Set Law Enforcement Update Workshop (Motion to set a Law Enforcement Update Workshop for Monday, April 20, 2015 at 6:30p.m. in the City Council Chambers) D. Administration 1). Advertisement of Full-time Public Works Position (pgs 28-29) (Motion to Authorize Public Works to advertise for a full-time Maintenance Worker Level 1.) 2). School Funding Letter (pgs 30-31) (Motion to endorse letter prepared by the STMA School Board and to be sent to elected State Leaders.) 3). City Administrator's Update (pgs 32-33) E. Legal -None F. Planning/Zoning -None G. Finance -None H. Building -None 9. Announcements and/or Upcoming Meetings April 13 STMA Ice Arena Board, 6:00 p.m. April 14 Planning Commission, 7:00 p.m. Joint City Council/Planning Commission, 7:30 p.m. April 20 Local Board of Appeal and Equalization, 5:30 p.m. Council Workshop with Sheriff's Office, 6:30 p.m. City Council, 7:00 p.m. April 27 Joint Powers Water Board, 6:30 p.m. Parks Committee, 8:00 p.m. May 2 Spring Cleanup Day, 7:00 a.m. — 1:00 p.m. 3150 Lander Ave NE, St. Michel May 4 City Council, 7:00 p.m. May 11 STMA Ice Arena Board, 6:00 p.m. M:\Public Data\City Council\Council Agendas\2015 Agendas\2015-04-06 CC Agenda.doc Meeting Date: April 6, 2015 Agenda Page 2 City of Albertville Council Agenda Monday, April 6, 2015 Page 3 of 3 10 May 12 Planning Commission, 7:00 p.m. May 15 Explore Your Parks Night (multiple parks), 6:00 — 8:00 p.m. May 18 City Council, 7:00 p.m. May 25 Memorial Day, City Offices Closed May 26 Joint Powers Water Board, 6:30 p.m. APRIL Su M Tu W Th F Sa 1 2 3 4 5 cc 6 7 8 9 10 11 12 Ice 13 1 Pc14 1 15 16 1 17 1 18 19 cc 20LBAE 21 22 23 24 25 26 JP27 28 29 30 Adjournment MAY Su M Tu W Th F Sa 1 2 3 cc 4 5 6 7 8 9 10 Ice 11 Pc 12 1 13 141 151 16 17 cc 18 19 20 21 22 23 24 " 25 JP26PK 27 28 29 30 31 M:APublic Data\City Council\Council Agendas\2015 Agendas\2015-04-06 CC Agenda.doc Meeting Date: April 6, 2015 Agenda Page 3 Nlbertvillc Smolt Town W.9. Big City IIF.. ALBERTVILLE CITY COUNCIL Monday, March 16, 2015 DRAFT MINUTES ALBERTVILLE CITY HALL 1. CALL TO ORDER — PLEDGE OF ALLEGIANCE Mayor Hendrickson called the meeting to order at 7:22 p.m. 2. ROLL CALL 7:00 PM Present: Mayor Hendrickson and Council members Hudson, Olson, Sorensen, and Vetsch Absent: None Others Present: City Administrator-PWD Adam Nafstad, City Planner Al Brixius, and City Clerk Kimberly Olson 3. RECOGNITIONS — PRESENTATIONS — INTRODUCTIONS — None 4. PUBLIC FORUM — (time reserved 5 minutes) There was no one present for the forum. 5. AMENDMENTS TO THE AGENDA There were no amendments to the agenda. Motioned by Olson, seconded by Sorensen, to approve the agenda as presented. Ayes: Hendrickson, Hudson, Olson, Sorensen, and Vetsch. Nays: None. Absent. None. MOTION DECLARED CARRIED. 6. CONSENT AGENDA All items under the Consent Agenda are considered to be routine by the City staff and will be enacted by one motion. In the event an item is pulled, it will be discussed in the order it is listed on the Consent agenda following the approval of the remaining Consent items. These items will be approved by a separate motion. A. Approve the March 2, 2015 regular City Council meeting minutes as presented B. Authorize the Monday, March 16, 2015 payment of claims as presented, except bills specifically pulled which are passed by separate motion. The claims listing has been Page 1 City Council Meeting Minutes Regular Meeting of March 16, 2015 Agenda Page 4 provided to City Council as a separate document and is available for public view at City Hall upon request C. Approve a One -Day Temporary Intoxicating Liquor License for the Albertville Lions Club for their annual Comedy Night to be Saturday, April 25, 2015 D. Approve the annual renewal of liquor licenses listed in the staff report contingent on full payment of license fees, proof of liquor liability insurance, and Wright County Sheriff's review for liquor law violations Motioned by Sorensen, seconded by Hudson, to approve the Consent Agenda as presented. Ayes: Hendrickson, Hudson, Olson, Sorensen, and Vetsch. Nays: None. Absent. None. MOTION DECLARED CARRIED. 7. PUBLIC HEARINGS — None 8. DEPARTMENT BUSINESS A. City Council 1). Committee Updates (STMA Ice Arena, Planning, JPWB, Parks, Fire Board, etc.) STMA Ice Arena Board Hudson stated the STMA YHA presented the Board with a resolution stating the Association's commitment and desire to move forward with a second sheet of ice. He indicated that YHA had discussed adding a staff person that could consistently serve throughout the various terms of the STMA YHA officers. B. Public Works/Engineering — None C. Finance — None D. City Clerk —None E. Planning/Zoning — None F. Building — None G. Legal —None H. Administration 1). Sale of Tax Forfeited Properties, Lots 35 and 37, Block 2, Prairie Run Nafstad stated the lots were two City -owned cul-de-sac lots received via tax forfeiture. He reported two builders bid on both properties and Christian Builders had the high bid. Motioned by Vetsch, seconded by Hudson, to accept the high bids of Christian Builders and enter into purchase agreements for the sale of Lot 35, Block 2, Prairie Run to Christian Builders for $41,200 and the sale of Lot 37, Block 2, Prairie Run to Christian Builders for City Council Meeting Minutes Page 2 Regular Meeting of March 16, 2015 Agenda Page 5 $38,200. Ayes: Hendrickson, Hudson, Olson, Sorensen, and Vetsch. Nays: None. Absent. None. MOTIONDECLARED CARRIED. 2). City Administrator's Update Nafstad sent a check to the Hanover Food Shelf in the amount of $147.00. These funds were donations from residents who designated their savings from electronic utility billing go to the food shelf. Nafstad reminded the Council of the upcoming Joint Governance meeting on Monday, March 30 with the City of St. Michael and ISD 9885 School Board. The meeting will be held at the St. Michael City Center at 6:00 p.m. Nafstad indicated he has met several times with the Church of St. Albert on the 57th Street NE and Church improvements. As soon as the church executes the right-of-way and construction agreement with the City, he will recommend award of the low bid. Olson inquired why it appears the Personal Injury Accidents have gone down significantly in the Sheriff's Office Annual Report. Nafstad stated that the flashing yellow left turn signals that were installed in the last two years could have been a factor. Hudson inquired if would be sustainable as he has seen cars slow due to confusion of what to do at the flashing turn light. He was concerned that eventually drivers will get used to it. Nafstad noted that MnDOT has made the flashing yellow a standard. 9. ANNOUNCEMENTS/UPCOMING MEETINGS Hendrickson inquired of Council if they would like to hold another Joint City Council and Planning Commission Workshop. Olson inquired if the Planning Commission would be meeting in April. Brixius stated the Commission would have at least one item for the April 14 Planning Commission. Motioned by Hendrickson, seconded by Hudson, to set a Joint City Council and Planning Commission Workshop for Tuesday, April 14 at 7.30 p.m. in the City Council Chambers. Ayes: Hendrickson, Hudson, Olson, Sorensen, and Vetsch. Nays: None. Absent. None. MOTION DECLARED CARRIED. March 23 Joint Powers Water Board, 6:30 p.m. Parks Committee, 8:00 p.m. March 30 Joint Governance Meeting, St. Michael City Center, 6:00 p.m. April 6 City Council, 7:00 p.m. April 13 STMA Ice Arena Board, 6:00 p.m. April 14 Planning Commission, 7:00 p.m. Joint Planning Commission/City Council, 7:30 p.m. April 20 Local Board of Equalization and Appeal, 5:30 p.m. City Council, 7:00 p.m. April 27 Joint Powers Water Board, 6:30 p.m. City Council Meeting Minutes Page 3 Regular Meeting of March 16, 2015 Agenda Page 6 MARCH Su M Tu W Th F Sa 1 cc 2 3 4 5 6 7 8 Ice 9 PC 10 11 12 13 14 15 cc 16 17 18 19 20 21 22 JP23PK 24 25 26 27 28 29 JM 30 31 10. ADJOURNMENT APRIL Su M Tu W Th F Sa 1 2 3 4 5 cc 6 7 8 9 10 11 12 Ice 13 Pc14 15 16 17 18 19 cc 20LBAE 21 22 23 24 25 26 JP 27 28 29 30 Motioned by Hendrickson, seconded by Hudson, to adjourn the meeting at 7.40 p.m. Ayes: Hendrickson, Hudson, Olson, Sorensen, and Vetsch. Nays: None. Absent. None. MOTION DECLARED CARRIED. Respectfully submitted, Kimberly A. Olson, City Clerk City Council Meeting Minutes Page 4 Regular Meeting of March 16, 2015 Agenda Page 7 Nbertvillc Small 9 Uvin . BigCity We. 4 JOINT CITY COUNCIL & PLANNING COMMISSION WORKSHOP Monday, March 16, 2015 DRAFT MINUTES 1. CALL TO ORDER The meeting was called to order at 6:05 p.m. Present: Mayor Jillian Hendrickson and Council members Hudson Olson, Sorensen, and Vetsch. Planning Commissioners Mark Barthel, Jeremy Dominick, Ron Klecker, and Natalya Lindberg. Absent: Planning Commissioner Dale Edgren. Others Present: City Administrator/Engineer-PWD Adam Nafstad, City Planner Alan Brixius, City Clerk Kimberly Olson. 2. GOAL SETTING & PRIORITIES FOR 2015 Brixius reviewed the completed projects the City accomplished in 2014. Brixius gave a presentation on the goals that were originally outlined in the visioning process used in 2012. He indicated that rather than updating the entire Comprehensive Plan in 2012, they used a visioning process to identify issues and opportunities within the community. It also addressed goals, priorities, and strategies for each issue. The process was completed to provide direction for the City for the next 20 to 30 years. Brixius stated that the goals and priorities were reaffirmed in 2013 and 2014 by the City Council and Planning Commission. Sorensen indicated that the visioning process included other committees, community groups, and businesses. Brixius stated several City projects outlined in the vision process are yet to come such as the streets Capital Improvement Plan, upgrade at the Waste Water Treatment Facility, possible expansion in the industrial area, Central Park Master Plan, and future consideration of point of sale inspections for the housing stock. Agen"Verge 8 Brixius stated staff is currently working with the Albertville Premium Outlet mall on storage pods, secondary access, additional signage, light pole banners, and improved pedestrian crossings. The STMA Soccer Club has approached the City regarding options for a larger building at the former City Hall building located at 5964 Main Avenue NE. Brixius also stated he would like to re-examine the Sign Code. Dominick inquired about the lack of consistency in sidewalks. Nafstad replied they have not held their condition well and would be eventually replaced. Council discussed needed upgrades to the intersection at 57th Street NE and CSAH 19, the crosswalk at the Albertville Premium Outlet mall across CSAH 19, and school access. Brixius inquired of Council their thoughts on the City owned land near the compost site. He indicated previous discussions considered residential homes, a recreational use, a commercial use, and a split residential/park use. Hendrickson inquired about the community pool listed in the Community Facilities section of the presentation. Brixius stated that was a topic brought up at a previous Planning Commission meeting. Council agreed to remove the pool from the list. They were supportive of the splash pad incorporated into the Central Park Master Plan. Hendrickson was supportive of having another church located within the City. Brixius stated that is what Council would need to address at this workshop; if they support rezoning any areas in the City. He stated that some other cities also allow a Conditional Use Permit in a residential neighborhood. Brixius reported the Leuer-Munstertieger, Inc. property has been before Council to consider several other uses on the property, such as a multi -housing complex and split residential/commercial use and prior Councils have not entirely been supportive of this uses. Dominick stated he did not feel a twenty year plan should prohibit the sale of a willing buyer and seller. Brixius replied that is a determination the Planning Commission and City Council must make; if they wish for immediate sale, they will need to amend the goals outlined in the vision process. Dominick felt that the applicant didn't have a chance with their request, that it was an automatic no to them. Brixius stated that staff is charged with bringing all facts, including the goals and priorities set by previous Councils. Hudson stated that he felt the application process was fair. Staff brought forward to Planning Commission and City Council the application and options both for and against the request. Hendrickson agreed. Both agreed they should continue that process. Barthel also felt the process was working. City Council Meeting Minutes Workshop Meeting of March 16, 2015 Page 2 Agenda Page 9 3. ADJOURNMENT Motioned by Hendrickson, seconded by Olson, to adjourn the meeting at 7.22 p.m. Ayes: Hendrickson, Hudson, Olson, Sorensen, and Vetsch. Nays: None. Absent. None. MOTION DECLARED CARRIED. Respectfully submitted, Kimberly A. Olson, City Clerk City Council Meeting Minutes Workshop Meeting of March 16, 2015 Page 3 Agenda Page 10 �lbcrtvill£ Mayor and Council Request for Action Smoii living. gig lifs. April 1, 2015 SUBJECT: CONSENT - FINANCE — PAYMENT OF BILLS RECOMMENDATION: It is respectfully requested that the Mayor and Council consider the following: MOTION TO: Authorize the Monday, April 6, 2015 payment of the claims as presented except the bills specifically pulled, which are passed by separate motion. The claims listing has been provided to Council as a separate document. The claims listing is available for public viewing at City Hall upon request. BACKGROUND: The City processes claims on a semi-monthly basis. The bills are approved through their respective departments and administration and passed onto the City Council for approval. KEY ISSUES: Account codes starting with 810 are STMA Arena Expenses/Vendors (bolded) and key issues will be presented in the claims listing document. POLICY/PRACTICES CONSIDERATIONS: It is the City's policy to review and approve payables on a semi-monthly basis. FINANCIAL CONSIDERATIONS: City staff has reviewed and recommends approval of payments presented. LEGAL CONSIDERATIONS: The Mayor and Council have the authority to approve all bills pursuant to Minnesota State Law, which requires all bills to be paid in a timely manner, generally within 30 days unless one party determines to dispute the billing. Responsible Person: Tina Lannes, Finance Director Submitted through: Adam Nafstad, City Administrator-PWD Attachment: List of Claims (under separate cover) M:\Public Data\City Council\Council Packet infonnation\2015\040615\2015-04-06 Finance Bills Report (RCA).doc Meeting Date: April 6, 2015 a Page 11 w A\1b£rtvi l� � Small T^— Uvina- Sta City OIr. Mayor and Council Request for Action March 31, 2015 SUBJECT: CONSENT— AUTHORIZE CORPORATE SIGNERS RECOMMENDATION: It is respectfully requested that the Mayor and Council consider the following motion: MOTION TO: Approve Resolution No. 2015-008 entitled a Resolution Appointing Corporate Authorized Signers for the City of Albertville. BACKGROUND: Annually, the Albertville City Council has appointed Corporate Authorized signers for the City of Albertville. Corporate Authorized Signers are allowed to invest in the best interests of the City. Past practice has been to authorize the Mayor, Acting Mayor, City Administrator, Finance Director, and City Clerk as corporate signers for the City of Albertville. This ensures that should key staff be indisposed, there are others who can sign/act on the City's behalf, if needed. KEY ISSUES: The appointment of Corporate Authorized Signers has traditionally been done annually at the beginning of the year. • Staff recommends that changes to the resolution appointing Corporate Authorized Signers be done only when there is a change due to City elections or appointment of staff. PRACTICES/POLICIES CONSIDERATIONS: The City Council has the authority to appoint Corporate Authorized Signers as it deems necessary. FINANCIAL CONSIDERATIONS: There are no financial considerations relating to authorization of corporate signers. LEGAL ISSUES: In accordance with Council procedures, the Mayor and Council possess the authority to approve the resolution. Department/Responsible Person: Tina Lannes, Finance Director Submitted through: Adam Nafstad, City Administrator-PWD Attachments: Resolution No. 2015-008 M:\Public Data\City Council\Council Packet information\2015\040615\2015-04-06 Corporate Signers.doc Meeting Date: April 6, 2015 enda Page 12 CITY OF ALBERTVILLE COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO.2015-008 A RESOLUTION MAKING APPOINTMENTS TO CORPORATE AUTHORIZED SIGNERS FOR THE CITY OF ALBERTVILLE WHEREAS, it is the policy of the Albertville City Council to make annual appointments to assign individuals as corporate authorized signers for the City government; and, WHEREAS, these individuals are authorized to invest for the City in the best interest of the City; and, NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Albertville, County of Wright, State of Minnesota, establishes the following: 1. That the following persons are appointed by the City Council to serve as the Corporate Authorized Signers: MAYOR: ACTING MAYOR: CITY ADMINISTRATOR FINANCE DIRECTOR: CITY CLERK: Jillian Hendrickson John Vetch Adam Nafstad Tina Lannes Kimberly Olson 2. That such appointment shall take effect on the date thereof and shall continue until such time as a successor is appointed by the City Council. Adopted this 6tb day of April, 2015 by the City Council of the City of Albertville. Attest: Kimberly Olson, City Clerk Jillian Hendrickson, Mayor Agenda Page 13 w 1bcr`tV1l1£ Mayor and Council Request for Action ma _- April 2, 2015 SUBJECT: PUBLIC WORKS / ENGINEERING— 57TH STREET & UTILITY IMPROVEMENTS RECOMMENDATION: This space on the agenda is reserved for the City Council to consider approval of the plans and specifications and acceptance of the lowest bid received for the 571h Street & Utility Improvements project. It is respectfully requested that the Mayor and Council consider the following motion: MOTION TO: Approve Resolution No. 2015-009 entitled A Resolution Approving Plans and Specifications and Accepting Low Bid for 2015 — 571h Street and Utility Improvements and Approving Right of Way and Construction Agreement with the Church of St. Albert's BACKGROUND INFORMATION: The proposed improvement project was advertised and on February 17, 2015, bids for the improvements were opened. A total of eight (8) bids were received with proposals ranging from $874,612.28 to $1,103,679.23, as shown on the attached Bid Abstract. Over the past few years, the City and St. Albert's Church have been working to develop a coordinated improvement project. The proposed project includes reconstruction of 57' Street and utilities, between the Fire Hall and Main Avenue NE, as well as, parking lot reconstruction and expansions to Church and Parish Center parking facilities. The proposed street reconstruction includes complete replacement of pavement, curb and gutter, sidewalks, and municipal utilities (storm sewer, watermain, and sanitary sewer. The reconstruction will include street widening to match the newer segments of 57t Street NE west of the fire hall, and completion/connection of the sidewalk on the north side of 571h Street NE. Additional right-of-way will be needed from the Church and Parish Center to accommodate the widening. The street and utility improvements will require the relocation of certain private utilities. The Church desired improvements include parking lot pavement reconstruction, expansion to parking facilities, relocation of driveways, and parking lot striping. Also included with the project is a connecting drive between the westerly Church parking lot and the adjacent City owned lot. Based on the bid schedule, the City's portion of the construction cost is $699,317.41 plus the cost associated with right-of-way. The Church's portion of the construction is $175,294.87 less the cost associated with right-of-way. The negotiated cost of right-of-way and total damages owned to the Church is proposed to be $53,000. M:\Public Data\City Council\Council Packet Information\2015\040615\040215 57th and Church Award RCA.doc Meeting Date: April 6, 2015 a Page 14 Mayor and Council Request for Action — 57tb Street and Utility Improvements Award Public Works / Engineering — April 2, 2015 Page 2 of 2 KEY ISSUES: • The two project are being coordinated together to reduce costs for both parties. If completed as standalone projects, additional costs will be incurred as several project components would be completed twice. • The Church has reviewed and approved the Right of Way and Construction Agreement. • The negotiate right-of-way costs and total damage is proposed to be $53,000. This cost associated with the right-of-way acquisition will be deducted from the Church's share of the project costs. • The City will administer the construction contract and project. The Church will reimburse the City for engineering and project overhead. • Low Bid for the project is $874,612.28 • Low Bid Received by Omann Brothers, Inc. FINANCIAL CONSIDERATIONS: The proposed project will be funded through multiple funds including the 2015 streets budgets, MSAS funds, and capital reserves. The low bid amount is for $874,612, which includes approximately $122,330 that will be paid by the Church. These figures do not include the overhead costs associated with surveying services or construction inspection and testing. Overhead and construction contingencies are estimated to be approximately 15% of the construction amount. LEGAL CONSIDERATIONS: The Mayor and Council possess the authority to acquire public easement, enter into cost share agreements, authorize municipal improvements, and to accept or reject bids for municipal improvements. Submitted Through: Adam Nafstad, City Administrator —PWD Attached: Award Resolution Right of Way and Construction Agreement Bid Abstract On file with the Clerk: Construction Plans and Specifications, Project Exhibits M:\Public Data\City Council\Council Packet Infonnation\2015\040615\040215 57th and Church Award RCA.doc Meeting Date: April 6, 2015 15 CITY OF ALBERTVILLE COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO.2015-009 A RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND ACCEPTING LOW BID FOR THE 2015 — 571H STREET NE AND UTILITY IMPROVEMENTS AND APPROVING RIGHT OF WAY AND CONSTRUCTION AGREEMENT WITH THE CHURCH OF ST. ALBERT WHEREAS, plans and specifications for street, utility, drainage and other related municipal improvements to 57th Street NE and certain Church of St. Albert improvements have been prepared by Bolton & Menk, Inc. and such plans and specifications have been presented to the Albertville City Council for approval; and WHEREAS, pursuant to an advertisement for bids for the proposed improvements, bids were received, opened and tabulated; and WHEREAS, it appears that Omann Bros., Inc. of Albertville, Minnesota is the lowest responsible bidder; and WHEREAS, the municipal improvements abut the property of the Church of St. Albert located in Albertville, Minnesota ("Church"); and WHEREAS, the City desires to obtain additional permanent right of way along 571h Street and temporary construction easements from the Church; and WHEREAS, the Church desires to reconstruct its existing parking lots, construct additional parking areas, relocate driveway entrances, perform miscellaneous concrete repairs, and stripe all parking lots; and WHEREAS, an agreement addressing cost share and right-of-way and temporary easements has been prepared and approved by the Church of St. Albert. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Albertville, Minnesota, as follows: Such plans and specifications, a copy of which are on file with the City Clerk, are hereby approved. 2. The bid of Omann Bros., Inc. said "Low Bidder" in the amount of $874,612.28 for the construction of said improvements in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid. 3. Said bid of said Low Bidder is accepted. Page 1 Agenda Page 16 City of Albertville Resolution No. 2015-009 Page 2 4. The City Administrator and City Clerk are hereby authorized and directed to enter into a contract with said "Low Bidder" for the construction of said improvements for and on behalf of the City of Albertville. 5. The Mayor and City Clerk are hereby authorized and directed to enter into the Right -of - Way and Construction Agreement with the Church of St. Albert. Adopted this 6tb day of April, 2015 by the City Council of the City of Albertville. Attest: Kimberly A. Olson, City Clerk Jillian Hendrickson, Mayor Agenda Page 17 RIGHT OF WAY AND CONSTRUCTION AGREEMENT WHEREAS, The City of Albertville ("City") desires to reconstruct and improve 57th Street, consisting of the complete reconstruction of 57th Street between the City's Fire Hall and Main Avenue, including street widening, sidewalks, replacement of utilities, undergrounding of overhead wires, and relocation of utility poles ("57th Street Improvements"), which improvements abut the property of the Church of St. Albert located in Albertville, Minnesota ("Church"); and WHEREAS, The City desires to obtain additional permanent right of way along 57th Street and temporary construction easements from the Church; and WHEREAS, The Church desires to reconstruct its existing parking lots, construct additional parking areas, relocate driveway entrances, perform miscellaneous concrete repairs, and stripe all parking lots ("Church Improvements"); and WHEREAS, It is in the best interest of both the Church and the City to combine these two projects under one contract to obtain the best price for both parties; and NOW, THEREFORE, the City and Church agree as follows: 1. The City's Engineer shall prepare plans and specifications for the 57th Street Improvements and the reconstruction and expansion of the Church parking lots. The plans and specifications for the Church Improvements shall be based upon the parking lot and driveway improvements shown on the attached Exhibit A. 2. Upon approval of the Church parking lot plans and specifications by the Church, and upon approval of the 57th Street plans and specifications by the City, the City shall solicit bids in accordance with Minnesota law for the 57th Street Improvements with the Church Improvements included as a bid alternate. 3. Upon receipt of bids, the City shall forward the bidding results to the Church for its review, with the City indicating the lowest responsive bid for the combined 57th Street Improvements and Church Improvements. 1 Agenda Page 18 4. The Church shall confirm in writing whether it wants the City to award the Church Improvements alternate contract. If the Church desires that the City award the Church Improvements contract, the Church shall forward to the City with its written confirmation a check made payable to the City in the amount of the Church Improvements bid to be awarded, plus an additional 15% for engineering costs. S. If the City awards the bid for the 571h Street Improvements, it shall also award the bid for the Church Improvements, provided the Church has first complied with the requirements of paragraph 4 above. If the City does not award the bid for the Church Improvements for any reason, the City shall promptly return the Church's check to the Church. 6. If the City awards the bid for the 571h Street Improvements, the Church shall execute the permanent easement attached as Exhibit B to this Agreement and the temporary construction easement attached as Exhibit C to this Agreement. The parties agree that the damages to the Church resulting from the Church providing the City with the permanent easement shown on Exhibit B and the temporary construction easements shown on Exhibit C are $53,000. If the City awards the Church Improvements with the 57th Street Improvements, the Church shall deduct $53,000 from the amount the City is otherwise due as set out in paragraph 4 above. If the City does not award the Church Improvements the City shall pay the Church $41,000 as complete and total compensation for the granting of the permanent and temporary easements attached as Exhibits B and C within 10 days of awarding the bid. 7. If the City awards the bid for both the Church Improvements and the 57th Street Improvements, the Church hereby grants the City and its contractors the right to enter upon Church property as necessary to complete construction of the Church Improvements and 57th Street Improvements. The City shall restore disturbed areas of the Church property upon completion of construction work. 8. Upon completion of the work, the City shall forward to the Church an accounting of all costs, with a division of construction, engineering and permitting costs between the 57th Street Improvements and the Church Improvements. Construction costs shall be split based upon the quantities used for each project and contractor fixed costs such as mobilization allocated in proportion to the value of the quantities used 2 Agenda Page 19 on each project. Engineering and other fixed costs such as permitting fees shall be split based on each party's share of construction costs. 9. If the total costs of the Church Improvements are more than the amount of money deposited with the City by the Church pursuant to paragraph 4 above, the Church shall pay the balance within 30 days of billing by the City. If the total costs of the Church Improvements are less than the amount of money deposited with the City by the Church pursuant to paragraph 4 above, the City shall refund to the Church within 30 days of issuance of the accounting the difference between the cost of the Church Improvements and the money the Church deposited with the City. 10.Time is of the essence in this Agreement. 11.This Agreement shall be governed by Minnesota law. Dated: March _, 2015 CITY OF ALBERTVILLE Jillian Hendrickson, Mayor Kimberly A. Olson City Clerk CHURCH OF ST. ALBERT By: Its: Brian Scherber, Trustee Linda Richter, Trustee 3 Agenda Page 20 — — — — — — — — — — — — -- F ------------- ----------------------- "0 ------------- --------- -- — — — — — — — — - - - - - --------------- < < + < CHURCH OF ST. ALBERT —.—CHURCH OF ST.ALBERT PARISH CENTER RIWACQUISTION R 6' SID EWAT 5- SIDEWALK SIDEWALK U. --- — ------------ 7-:� 57TH ST NE — ---------- ----- ....... ... ----------- ---- - ---------- 0, D' SIDEWALK `7 <- - - - - - - - - - LEGEND PRE CONSTRUCTION STALL COUNT POST CONSTRUCTION STALL COUNT O D—E—IN—E—N WEST CHURCH HOT WEST CHURCH HOT 46 O PNaPoS—N—Ell.-a ... E— EAST CHU RED LOT EASTCHURCHILOT 70 D—E—A—E.ENL PARISH CENTER LOT 11 PARISH CENTER LOT 51 - — ------- ID ST. ALBERT CHURCH & PARISH CENTER PARKING LOT IMPROVEMENTS RIGHT OF WAY ACQUISTION a. "A E= K' I r4 n E3 (D Agenda ITEI .. —1 . 'PENIE1 'A I APH'.. FIGUREA --———— I I I I I I THE CHURCH OF ST. ALBERT 11400 57TH ST N E PID=101500012127 I I �_______________ 57TH STREET z I I I LLJ L1J a I co I m I I I I i I I 0 00 SCALE FEET i IL I ' I LU LU THE CHURCH OFIST. ALBERT Q 11400 57TH ST NE PID=101500612123 LU ¢ I ________________ ______________ ----�— tv7 O I I � I — -- — � I F(;FNn LU LU r PROPOSED RIGHT OF WAY AREA EXISTING RIGHT OF WAY ---- PROPOSED RIGHT OF WAY TOTAL RIGHT OF WAY ACQUISITION AREA = 8,711 SQ. FT �IwIBoL--rC)" a. KAM"K, INC. CITY OF ALBERTVILLE, MINNESOTA �Ybpl� Consulting Engineers & Surveyors 2014 - 57th STREET AND UTILITY IMPROVEMENTS MANRATO, MN FAIRM ONT, MN SLEEPY EYE, MN RU RI4-LLE, MN WILLMAR, MN CH-, MN RAMSEY, MN MAPLEWOOO, MN RIGHT OF WAY ACQUISITION RAXFER, MN ROCHESTER, MN AMES, IA SPENCER, IA I APRIL, 2014 FIGURE B Agenda Page 22 --———— I I I I I THE CHURCH OF ST. ALBERT 11400 57TH ST N E PID=101500012127 I I 57TH STREET �1 LU LU LU co a I 0 00 SCALE FEET LU THE CHURCH OFIST. ALBERT Q 11400 57TH ST NE PID=101500612123 LU ¢ I I I I LEGEND LU LU r PROPOSED TEMPORARY CONSTRUCTION EASEMENT TEMPORARY CONSTRUCTION EASEMENT EXISTING RIGHT OF WAY ---- PROPOSED RIGHT OF WAY TOTAL TEMPORARY CONSTRUCTION EASEMENT AREA = 7,183 SQ. FT Z)LTOIV 8. MErvK, INC.I CITY OF ALBERTVILLE, MINNESOTA Consulting Engineers & Surveyoro 2014 - 57th STREET AND UTILITY IMPROVEMENTS MANRATO, MN FAIRM ONT, MN SLEEPY EYE, MN RURNSVILLE, MN WILLMAR, MN CH-, MN RAMSEY, MN MAPLE-C MN TEMPORARY CONSTRUCTION EASEMENT RAXFER, MN ROCHESTER, MN AMES, IA SPENCER, IA APRIL, 2014 FIGURE C ABSTRACTS OF BIDS 2015 -57TH STREET & UTILITY IMPROVEMENTS CITY OF ALBERTVILLE, MN RMI AtR1fi 196732 ITEM MNIDOT NO. SPEC NO. ITEM DESCRIPTION APPROX. UNIT OUANTTY OMANN BROTHERS ALBERTVILLE, MN UNIT PRICE AMOUNT FEHN COMPANIES ALBERTVILLE, MN UNIT PRICE AMOUNT BURSCHVILLE CONSTRUCTION HANOVER UNIT PRICE AMOUNT NEW LOOK CONTRACTING ROGERS, MN UNIT PRICE AMOUNT 1 2021.501 1MOBILIZATION LUMP SUM 1.0 $12,000.00 $12,000.00 $24,013.00 $24,013.00 $32,500.00 $32,500.00 $35,000.00 S35.000.05 2 2101.511 CLEARING AND GRUBBING LUMP SUM 1.0 $1'wom $1,000.00 $1'wom $1,000.00 $1,100D0 $1,100D0 $3,850D0 $3,850.00 3 2104.501 REMOVE CONCRETE CURB & GUTTER LIN FT 2,231.0 $2.65 $5,912.15 $3.25 $7,250.75 $3.45 $7,696.% $3.00 $6,693.05 4 2104.501 REMOVE STORM SEWER PIPE LIN FT 1,167.0 $8.26 $9,639.42 $8.16 $9,522.72 $&w $9,336.00 $10.75 $12,545.25 5 2104.501 REMOVE SANITARY SEWER PIPE LIN FT 378.0 $2.06 $]]8.68 $2.04 $]]1.12 $2.00 $756.00 $&w $3,024.00 6 2104.501 REMOVE SANITARY SERVICE PIPE LIN FT 28.0 $2.06 $57.68 $2.04 $57.12 $2.00 $%.00 $9.50 $266.00 ] 2104.501 REMOVE WATERMAIN PIPE LIN FT 341.0 $2.06 $702.46 $6.63 $2,260.83 $6.50 $2,216.50 $10.00 $3,410.00 8 2104.501 REMOVE WATER SERVICE PIPE LIN FT 19.0 $6.71 $127.49 $2.04 $38.76 $2.00 $38.00 $14M $275.50 9 2104.503 REMOVE CONCRETE PAVEMENT SO FT 8,874.0 $0.75 $6,655.50 $0.52 $4,614.48 $0.58 $5,146.92 $1.05 $9,31 ].]0 10 2104505 REMOVE BITUMINOUS PAVEMENT SO YD 101.0 $6.00 $606.00 $8.70 $8]8.]0 $9.15 $924.15 $18.00 $1.818.00 11 2104505 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SOFT 190.0 $2.49 $473.10 $0.89 $169.10 $0.% $180.50 $2.50 $475.00 12 2104.509 REMOVE DRAINAGE STRUCTURE EACH 8.0 $309.60 $2,476.80 $306.00 $2,448.00 $300.00 $2,400.00 $370.00 $2,960.00 13 2104.509 REMOVE HYDRANT & VALVE EACH 1 2.0 S412.80 $825.60 $408.00 $816.00 $400.00 $fflom $950.00 $900.00 14 21045M REMOVE SIGN EACH 18.0 $25D0 $464.40 $25M $959.00 $33.00 $594.00 $35.00 $630.05 15 2104523 SALVAGE & INSTALL SIGN EACH 1.0 $129.00 $129.00 $153.00 $153.00 $110D0 $110D0 $110D0 $110.00 16 2104.603 ABANDON WATERMAIN PIPE LIN FT 405.0 $6.71 $2,71 ].55 $6.63 $2,685.15 $6.50 $2,632.50 $10.00 $4.050.00 17 2104.604 REMOVE LANDSCAPING LUMP SUM 1.0 $516.00 $516.00 $1,200.00 $1,200.00 $1,300D0 $1,300D0 $500.00 $500.00 18 2104.618 SALVAGE & INSTALL RETAINING WALL SO FT 37.0 $36.12 $1,336.44 $W.00 $1,110D0 $55.00 $2,035.00 $75.00 $2,]]5.05 19 2105501 COMMON EXCAVATION P YD 4,660.0 $7.42 $34,5]].20 $1322 $61 ,605.20 $13.90 $64,]]4.00 $1450 $6],5]0.00 20 210550] LEVICU SUBGRADE EXCAVATION VCU YD 4]0.0 $1024 $4,859.80 $1322 $6,213.40 $13.90 $6,533.00 $0.01 $4.70 21 2105.522 SELECT GRANULAR BORROW P CV CU YD 2,190.0 $14.90 $32,631.00 $15.90 $34,821.00 $16.70 $36,573.00 $27.00 $59,1 W.00 22 21055W SALVAGED AGGREGATE IN STOCKPILE LV CU YD 1,640.0 $0.01 $16.40 $4.39 $7,199.60 $4.60 $7,544.00 $2.25 $3,690.00 23 21055W SALVAGED AGGREGATE FROM STOCKPILE CV CU YD 1,090.0 $25M $2],]95.00 $1323 $14,420.70 $13.90 $15,151.00 $6.50 $7,085.00 24 2105543 STABILIZING AGGREGATE TON 920.0 $7.00 $6,440.00 $20.00 $18,400.00 $21.00 $19,320.00 $0.01 $9.20 25 OEM GEOTEXTILE FABRIC TYPE V P SO YD 6,000.0 $1.35 $8,100D0 $1.35 $8,100D0 $1.40 $8,400.00 $1.75 $10,500.00 26 2211501 AGGREGATE BASE CLASS 5 CU YD 375.0 $23.00 $8,625.00 $27.00 $10,125.00 $2825 $10,MT25 $Nm $11'0 2m 27 2215M1 81TUMINIOUS PAVEMENTRECLAMATION 10' SO YD 4,66].0 $3.90 $18,201.30 $0.88 $4,106.% $0.% $4,433.65 $1.25 $5,833.]5 28 2360501 TYPE SP 12.5 WEARING COURSE 2,C SPWEB240D 2360 TON 1,210.0 $65.15 $78,831.50 $6722 $81,457.20 $6].]5 $81,9]].50 $72M $8],]25.00 29 23 M2 TYPE SP 12.5 NONWEARINGCOURSE 2,8 SPNWB2308 2360 TON 605.0 $60.00 $36,300.00 $55.08 $33,323.40 $55.]5 $33,]28.]5 $59M $35,99].50 30 2360.601 BITUMINOUS PATCH SO FT 1,406.0 $4.65 $6,537.% $4.48 $6,298.88 $6.50 $9,139D0 $4.85 $6,819.16 31 2451.509 AGGREGATE BEDDING CU YD 100.0 $3922 $3,922.00 $38.76 $3,876.00 $38.00 affloDO $32.00 $3,200.00 32 2502.603 4' PE PERF DRAINTILE LIN FT 1,960.0 $4.13 $KM4.80 $4.20 $8,232.00 $4.65 $9,114.00 $1125 $22,050.00 33 2502.603 6' PE PERF DRAINTILE LIN FT 10.0 $25D0 $258.00 $25M $255.00 $25.00 $250.00 $30.00 $300.00 34 2503 11 4' PVC SDR 26 SERVICE PIPE LIN FT 85.0 $30.96 $2,631.60 $W.60 $2,601.00 $W.00 $2,550.00 $22.00 $1,870.00 35 2503 11 8' PVC SDR 35 SEWER PIPE LN FT 3]8.0 $3 8.18 $14,432.04 $3].]4 $14,265.]2 $37.00 $13,986.00 $22.75 $8,5%m 36 2503 41 12' RC PIPE SEWER DES 3006 CL V LIN FT 262.0 $29.93 $7,841.66 "m $],]49.% $29D0 $7,598.00 $26M $6,943.00 37 2503 41 15' RC PIPE SEWER DES 3006 CL V LIN FT 399.0 SM.02 $13,1 ]4.96 $32.64 $13,023.36 $32.00 $12,768D0 $28.00 $11,1 ]2.00 38 2503 41 18' RC PIPE SEWER DES 3006 CL V LIN FT 342.0 $36.12 $12,353.04 $35.70 $12,209.40 $35.00 $11,970.00 $32.75 $11,200.50 39 2503 41 21' RC PIPE SEWER DES 3006 CL V LIN FT 325.0 $3922 $12,746.50 $38.76 $12,597.00 $38.00 $12,350.00 $3750 $12,187.50 40 2503 41 24' RC PIPE SEWER DES 3006 CL V LIN FT 25.0 $46.44 $1,161.00 W.90 $1,147.50 W.00 $1,125.00 $5150 $1,287.50 41 2503.602 CONNECT TO EXISTING STORM SEWER, PIPE TO EXISTING PIPE EACH 2.0 $619.20 $1,238.40 $612.00 $1,224.00 $600D0 $1,200D0 $485D0 $970.00 42 2503.602 CONNECT TO EXISTING STORM SEWER, PIPE TO EXISTING STRUCI EACH 3.0 $1,290D0 $3,870.00 $1,275.00 $3,825D0 $1,250.00 $3,750.00 $550D0 $1,650D0 43 2503.602 CONNECT TO EXISTING SANITARY SEWER SERVICE EACH 3.0 $412.80 $1,238.40 $408.00 $1,224.00 $400.00 $1,200D0 $325.00 $975.00 44 OD00 CONNECT TO EXISTING SANITARY SEWER SERVICE WYE EACH 2.0 $1,135.20 $2,270.40 $1,122.00 $2,244D0 $1,100D0 $2,200.00 $865D0 $1,730.00 45 2503.602 8'X4' PVC SDR 26 WYE EACH 1.0 $154.80 $154.80 $153D0 $153D0 $150D0 $150D0 $250D0 $250.00 46 2503.602 CONNECT TO EXISTING SANITARY SEWER MANHOLE EACH 1.0 1 $1,548D0 $1,598D0 $1,530D0 $1,530D0 $1,500D0 $1,500D0 $975.00 $975D0 47 2504.601 TEMPORARY WATER SERIVCE LUMP SUM 1.0 $]]4.00 $]]4.00 $765.00 $765.00 $750.00 $750.00 $1,300D0 $1.300.00 48 2504.602 CONNECT TO EXISTING WATER SERVICE EACH 1.0 $412.80 $412.80 $408.00 $408.00 $400.00 $400.00 $350D0 $350.00 49 2504.602 HYDRANT EACH 2.0 $3,870.00 $],]40.00 $3,825.00 $7,650D0 $3,750.00 $7,500.00 $3,950D0 $7,900.00 50 2504.602 6' GATE VALVE AND BOX EACH 2.0 $1,341.60 $2,683.20 $1,326.00 $2,652D0 $1,300D0 $2,600.00 $1,350D0 $2,700.00 51 2504.602 8' GATE VALVE AND BOX EACH 4.0 $1,831.80 $],32].20 $1,810D0 $7,240.00 $1,]]5.00 $7,100.00 $1,".w $7,200.00 52 2504.602 12' GATE VALVE AND BOX EACH 6.0 $3,096.00 $18,576.00 $3,060.00 $18,360D0 $3 mom $18,000.00 $3,325.00 $19,950.00 53 2504.602 ADJUST VALVE BOX EACH 10.0 $258.00 $2,580D0 $255.00 $2,550D0 $250.00 $2,500.00 $950D0 $4,500.05 54 2504.602 WATERMAIN OFFSET EACH 3.0 $2,064.00 $6,192.00 $2,040.00 $6,120D0 $2,000.00 $6,000.00 $2,150D0 $6,450.00 55 2504.602 1' CURB STOP & BOX EACH 1.0 $283.80 $283.80 $280.Wl $280.00 $275.00 $275.00 $375.00 $375.00 56 2504.602 1' CORPORATION STOP EACH 1.0 $242.52 '42.52 '40.00 $240D0 $235.00 $235.00 $400.00 $400.00 57 2504.602 CONNECT TO EXISTING WATERMAIN EACH 7.0 $2,064.00 $14,448.00 $2,040.00 $14,280.00 $2,000.00 $14,000.00 $]50D0 $5.250.00 58 2504.603 6' PVC C-900 DR 18 WATERMAIN I LIN FT 1 49.0 $24-1 $1,213-1 $24.48 $1,199.52 $24.00 $1,1]6D0 $32D0 $1,568.00 59 1 2504.603 8' PVC C-900 DR 18 WATERMAIN LIN FT 136.0 $28.90 $3,930.40 $2856 $3,884.16 $28.00 $3,808.00 $28.00 $3,808.00 60 2504.b. 12' PVC C-900 DR 18 WATERMAIN LIN FT - $38.18I $36,194.64 $3].]4 $35,]]].5' $3].00 $35,0]6.00 $3450 $32,]06D0 61 2504.604 WATERMAIN INSULATION SO YD 10.0 $61.92 $619.20 $6120 $612D0 $60.00 swo.ml $60.00 $600.00 ABSTRACTS OF BIDS 2015 -57TH STREET & UTILITY IMPROVEMENTS CITY OF ALBERTVILLE, MN RMI 1tR1fi 196732 ITEM MNIDOT NO. SPEC NO. ITEM DESCRIPTION APPROX. UNIT QUANTITY OMANN BROTHERS ALBERTVILLE, MN UNIT PRICE AMOUNT FEHN COMPANIES ALBERTVILLE, MN UNIT PRICE AMOUNT BURSCHVILLE CONSTRUCTION HANOVER UNIT PRICE AMOUNT NEW LOOK CONTRACTING ROGERS, MN UNIT PRICE AMOUNT 621 2504.608 IPIPE FITTINGS POUND 1,311A $7.22 $9,465.42 $7.14 $9,360.54 $7.00 $9,1]].00 $7.80 $10,225.80 63 2504.608 1' WATER SERVICE PIPE LIN FT 43.0 $18m $798.94 $1826 $789.48 $18.00 $]]4.00 $31 m $1,354.50 64 2506.501 CONSTRUCT DRAINAGE STRUCTURE DES 484020 LIN FT 12.8 $392.16 $5,019.65 $387.60 $4,%1.28 $380A0 $4,864.00 $325.00 $4,160.00 65 206501 CONSTRUCT DRAINAGE STRUCTURE DES 6D4020 LIN FT 5.4 $578.75 $3,148.40 $571.20 $3,107.33 $560.00 $3,046.40 $445.00 $2,420.80 66 2506.501 CONSTRUCT DRAINAGE STRUCTURE DES 484022 LIN FT 17.1 $335.40 $5,721.92 $331.50 $5,655.39 $325.00 $5,544.50 $275.00 $4,6T1 67 2506.501 CONSTRUCT DRAINAGE STRUCTURE DES 604022 LIN FT 5.2 $5]].92 $3,005.18 $571.20 $2,970.24 $560.00 $2,912.00 $450.00 $2,340.00 68 2506.501 CONSTRUCT DRAINAGE STRUCTURE SPECIAL R-1 2k3' LIN FT 34.1 $273.48 $9,333.87 $270.30 $9,225.34 $265.00 $9,044.45 $270.00 $9,215.10 69 2506.602 CASTING ASSEMBLY STORM EACH 17.0 $516.00 $8,]]2.00 S510.00 $8,670.00 $500.00 $8,500A0 $675.00 $11,475.00 70 2506.602 ADJUST FRAME & RING CASTING EACH 5.0 $670.80 $3,3 Lw. $663.00 $3,315A0 $650A0 $3,250.00 $575.00 $2,875.00 71 2506.602 CASTING ASSEMBLY SANITARY EACH 1.0 $1,032.00 $1,032A0 $1,020.00 $1,020A0 $1,wom $1,wom $700.00 $700.00 72 2506.612 CHIMNEY SEAL EACH 3.0 $154.80 $464.40 $153.00 $459.00 $150A0 $450A0 $275.00 $825.00 73 2521.501 5' CONCRETE WALK SO FT 12,090.0 $5.86 $]0,84].40 $4.17 $50,415.30 $4.40 $53,196.00 $4.50 $54,405.00 74 2521.511 3'BITUMINOUS DRIVEWAY SO YD 22.0 $57.00 $1,254.00 $4229 $932.58 $36.00 $792.00 $5025 $1,1 mm 75 2531.501 CONCRETE CURB & GUTTER LIN FT 2,236.0 $12.]] $28,55 32 $10.15 $22,6%.40 $11.00 $24,5%.00 $11.00 $24,5%.00 76 2531.507 6' CONCRETE DRIVEWAY PAVEMENT SOFT 3,60135 $5.87 $21,139.92 $5.19 $18,691.01 $5.50 $19,807.43 $5.65 $20,347.63 ]] 2531.604 CONCRETE VALLEY GUTTER SO FT 383.0 $6.68 $2,558.44 $5.61 $2,148.63 $6.50 $2,489.50 $6.00 $2,298.00 78 2531.618 TRUNCATED DOMES SO FT 112.0 $37.12 $4,157.44 $35.70 $3,9%.40 $38.00 $4,256.00 $40.00 S4.480.05 79 25 1.601 TRAFFIC CONTROL LUMP SUM 1.0 $5,934.00 $5,9 Lw $5,508.00 $5,508.00 $5,500.00 $5,500.00 $5,200.00 $5,200.00 80 2564531 SIGN PANELS TYPE C SO FT 61.0 $W.96 $1,888.56 $38.76 $2,364.36 $%.00 $3,416.00 $%.00 S3.416.00 81 2573502 SILT FENCE, TYPE MACHINE SLICED LIN FT 340.0 $1.81 $615.40 $3.00 $1,020.00 $3.25 $1,105A0 $3.30 $1..122.00 82 25735W STORM DRAIN INLET PROTECTION EACH 21.0 $W.00 $1,8%.00 $425.00 $8,925.00 $125.00 $2,625.00 $200A0 $4,200.00 83 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1.0 $500.00 $500.00 $1,200.00 $1,200.00 $1,250.00 $1,250.00 $1,750A0 $1,750.00 84 2575505 HYDROMULCH, SEED MIX 25-131, FERT TYPE 3 22-5-10 SO YD 2,055.0 $2A6 $4,233.30 $1.02 $2,096.10 $2.20 $4,521.00 $2.20 $4,521.00 85 258 02 4' BROKEN LINE YELLOW - EPDXY LIN FT 427.0 $0.20 $85.40 $0.20 WAD $0.25 $106.75 $0.25 $106.75 86 258 02 4' SOLID LINE YELLOW - EPDXY LIN FT 630.0 $0.20 $126.00 $0.20 $126.00 $0.25 $157.50 $0.25 $157.50 87 258 02 4' SOLID LINE WHITE - EPDXY LIN FT 1,740.0 $0.20 $348.00 $0.20 $348.00 $0.25 $435A0 $0.25 $435.00 88 258 02 24'STOPLINEWHITE-EPDXY LIN FT 131.0 $8.26 $1,082A6 $8.16 $1,068.% $8.50 $1,113.50 $9.00 $1,179.00 89 2582.602 PAVEMENT MESSAGE RT ARROW EPDXY EACH 4.0 $103.20 $412.80 $102.00 $408.00 $110A0 $440.00 $110A0 $440.00 90 258 W CROSSWALK MARKING - EPDXY SO FT 990.0 $4.13 $4,088.70 $4.08 $4,039.20 $4.25 $4,207.50 $4.50 $4,455.00 TOTAL COSTSTREET IMPROVEMENTS $09317.41 $709298.14 $]32135.20 $748940.28 SCHEDULE B: PARKING AREA IMPROVEMENTS 1 2021.501 MOBILIZATION LUMP SUM 1.0 $4,0X.00 $4,000.00 $5,398.00 $5,398.00 $8,wom $Bwom $9,500.00 $9,500.I 2 2101.511 CLEARING & GRUBBING LUMP SUM 1.0 $2,900.00 $2,900.00 $3,500.00 $3,500A0 $4,000.00 $4,000.00 $5,500.00 $5,500.00 3 2104.501 REMOVE CURB & GUTTER LIN FT 453.0 $4.50 $2,038.50 $3.25 $1,472.25 $3.45 $1,%2.85 $5.75 $2,604.75 4 2104.501 REMOVE WOODEN FENCE LIN FT 75.0 $1022 $]]4.00 $7.00 $525.00 $8.00 $600.00 $12.75 $%6.25 5 2104.503 REMOVE CONCRETE PAVEMENT SO FT 1,390.0 $1.25 $1,]3].50 $0.52 $722.80 $0.% $]]8.40 $1.65 $2,293.50 6 2104.503 REMOVE RETAINING WALL(LIMBER) LIN FT 110.0 $1022 $1,135.20 $9.00 $990A0 $10.00 $1,100A0 $1650 $1,815.00 ] 2104.505 REMOVE BITUMINOUS PAVEMENT SO YD 274.0 $6.00 $1,644.00 $3.53 $967.22 $3.75 $1,027.50 $9.00 $2,466.00 8 2105.501 COMMON EXCAVATION P EV CU YD 1,351.0 $10m $14,185.5) $1551 $20,954.01 $1620 $22,021.30 $18.75 $25,331.25 9 2105.533 SALVAGED AGGREGATE IN STOCKPILE LV CU YD 815.0 $0.01 $8.15 $4.50 $3,667.50 $4.80 $3,912.00 $2.25 $1,833.]5 10 21055W SALVAGED AGGREGATE FROM STOCKPILE CV CU YD 545.0 $27.00 $14,]15M $13.9] $],613.65 $14.65 $7,%4.25 $6.50 $3,542.50 11 2211501 AGGREGATE BASE CLASS CV CU YD 500.0 $23.00 $11,500.00 $27.00 $13,500.00 $2825 $14,175.00 $3350 $16,750.00 12 2215501 BITUMINOUS PAVEMENT RECLAMATION 6' SO YD 3,816.0 $2.85 $10,875.60 $1.15 $4,388.40 $1.30 $4,%0.80 $1.50 $5,724A0 13 2360.501 TYPE SP 9.5 WEARING COURSE2,8 SPWEA2408 2360 TON 653.0 $64A5 $42,347.05 $6120 $39,963.60 $61.75 $40,322.75 $66.00 $43,098.00 14 236 02 TYPE SP 12.5 NONWEARINGCOURSE 2,8 SPNWB2308 2360 TON 653.0 $61.90 $40,420.30 $60.18 $39,297.54 $61.75 $40,322.75 $65.00 $42,445.00 15 2521.618 THICKENED EDGE CONCRETE WALK SO Fi 557.0 $7.25 $4,038.25 $5.70 $3,174.90 $6.00 $3,342.00 $6.50 $3,620.50 16 2531.501 CONCRETE CURB & GUTTER LIN FT 300.0 $18.03 $5,409.00 $16A3 $5,049.00 $18.00 $5,400.00 $18.15 $5,445.00 17 2540.603 FURNISH AND INSTALL RLTAINING WALL SO Fi 405.0 $25A0 $10,449.00 $30.00 $12,150.00 $29A0 $11,745.00 $35.00 $14,1 ]5.00 18 2564.602 SALVAGE & REINSTALL SIGN EACH 6.0 $129.00 $]]4.00 $150.00 $900A0 $110A0 $660.00 $110A0 $660.00 19 2573502 SILT FENCE MACHINE SLICED LIN FT 410.0 $1.81 $742.10 $2.50 $1,025.00 $2.75 $1,127.50 $2.75 $1,127.50 20 257556 HYDROMULCH, SEED MIX25-131, FERTTYPE 3 22-5-10 SO YD 1,282.0 $2.06 $2,640.92 $1.02 $1,307.64 $2.20 $2,820.40 $2.20 $2,820.40 21 2582501 HANDICAP PARKING SPACE SYMBOL - PAINT I EACH 8.0 $47D9 $376.72 $4654 $372.32 $50.00 $400.00 $50.00 $400.00 22 258 02 4' SOLID LINE WHITEPAINTLIN FT 2,936.0 $0.88 $2,583.68 $0.87 $2,554.32 $0.% $2,-.1 $1.00 $2,936A0 TOTAL SCHEDULE B: $1]5,294A] $169,493.15 $1]9,051.]0 $195,044.40 TOTAL SCHEDULE A+B- $874,61228 $878,79129 $911,186A0 $94$984.68 ABSTRACTS OF BIDS 2015 -57TH STREET & UTILITY IMPROVEMENTS CITY OF ALBERTVILLE, MN RMI AtR1fi 196732 ITEM MNIDOT NO. SPEC NO. ITEM DESCRIPTION APPROX. UNIT OUANUTY NORTHWEST ASPHALT SHAKOPEE, MN UNIT PRICE AMOUNT S.R. WEIDEMA MAPLE GROVE, MN UNIT PRICE AMOUNT DAVE PERKINS CONTRACTING NOWTHEN, MN UNIT PRICE AMOUNT MIDWEST CIVIL CONSTRUCTORS SHAKOPEE, MN UNIT PRICE AMOUNT 1 2021.501 IMOBILIZATION LUMP SUM 1.0 $106,878.00 $106,878.00 $21,600.00 $21,600.00 $25,000.00 $25,000.00 $54,000.00 $54.000.00 2 2101511 CLEARING AND GRUBBING LUMP SUM 1.0 $1,000D0 $1,000.00 $2,000.00 $2,000.00 $2,500.00 $2,500.00 $4,000.00 $4,000.00 3 2104501 REMOVE CONCRETE CURB & GUTTER LIN FT 2,231.0 $4.00 $8,924.00 $4.00 $8,924.00 $2.00 $4,462.00 $3.00 $6,693.00 4 2104.501 REMOVE STORM SEWER PIPE LIN FT 1,167.0 $10.00 $11,670.00 $13.50 $15,754.50 $10D0 $11,670.00 $10D0 $11,670.00 5 2104.501 REMOVE SANITARY SEWER PIPE LIN FT 378.0 $8.00 $3,024.00 $9.00 $3,402.00 $10D0 $3,780.00 $13.00 $4,914.00 6 2104.501 REMOVE SANITARY SERVICE PIPE LIN FT 28.0 $8.00 $224.00 $8.00 $224.00 $25.00 $700.00 $15.00 $420.00 ] 2104.501 REMOVE WATERMAIN PIPE LIN FT 341.0 $10.00 $3,410.00 $7.50 $2,55750 $15D0 $5,115.00 $15D0 $5,115.03 8 2104.501 REMOVE WATER SERVICE PIPE LIN FT 19.0 $8.00 $152.00 $6.00 $114.00 $25.00 $475.00 $19.00 $361.00 9 21045W REMOVE CONCRETE PAVEMENT SOFT 8,874.0 $0.80 $7,099.20 $0.75 $6,655.50 $2.00 $1],]48.00 $1.00 $8,874.00 10 2104505 REMOVE BITUMINOUS PAVEMENT SO YD 101.0 $5.00 $505.00 $6.50 OEM $4.00 $404.00 $10.00 $1,010D0 11 2104505 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SOFT 190.0 $5.00 $950.00 $1.50 $285.00 $5.00 $950.00 $3D0 $570.00 12 2104.509 REMOVE DRAINAGE STRUCTURE EACH 8.0 $400.00 $3,200.00 $461.97 $3,695.76 $650.00 $5,200D0 S510.00 $4,0U) W 13 2104.509 REMOVE HYDRANT & VALVE EACH 2.0 $150.00 $300.00 $525.00 $1,050D0 $1,wom $3,600.00 $570.00 $1,140.00 14 21045M REMOVE SIGN EACH 18.0 $35.00 $630D0 $65.00 $1,170.00 $50.00 $900D0 $30.00 $540D0 15 2104523 SALVAGE & INSTALL SIGN EACH 1.0 $200.00 $200D0 $125.00 $125.00 $150D0 $150D0 $100D0 $100.00 16 2104.603 ABANDON WATERMAIN PIPE LIN FT 405.0 $8.00 $3,240.00 $1450 $5J372.50 $12.00 $4,860.00 $15.00 $6,075.00 17 2104.604 REMOVE LANDSCAPING LUMP SUM 1.0 $500.00 $500.00 $2,075.00 $2,075.00 $3,500D0 $3,500D0 $500.00 $500D0 18 2104.618 SALVAGE & INSTALL RETAINING WALL SO FT 37.0 $25.00 $925.00 $W.00 $2,960.00 $25.00 $925.00 $50.00 $1,850.00 19 2105501 COMMON EXCAVATION P EV CU YD 4,660.0 $15m $72,230.00 $12.00 $55,920D0 $12.00 $55,920D0 $16.00 $74,560.00 20 2105507 SUBGRADE EXCAVATION EV CU YD 470.0 $16.00 $7,520.00 $14.00 $6,580.00 $25.00 $11,750.00 $16.00 $7,520.00 21 2105.522 SELECT GRANULAR BORROW P CV CU YD 2,190.0 $15.12 $33,112.80 $22.00 $48,180.00 $16.00 $35,040.00 $23.00 $50,370.00 22 2105533 SALVAGED AGGREGATE IN STOCKPILE LV CU YD 1,640.0 $6.70 $10,988.00 $4.60 $7,544.00 $BD0 $13,120.00 $6.00 $9,840.00 23 2105533 SALVAGED AGGREGATE FROM STOCKPILE CV CU YD 1,090.0 $16.00 $17,440.00 $9.00 $9,810D0 $7.00 $7,630.00 $11.00 $11.990.05 24 2105543 STABILIZING AGGREGATE TON 920.0 $12.00 $11,O40D0 $40.00 $36,800.00 $25.00 $23,000.00 $25.00 $23,000.00 25 2105.604 GEOTEXTILE FABRIC TYPE V P SO YD 6,000.0 $1.00 $6,000.00 $1.75 $10,500.00 $2.00 $12,000.00 $1.60 $9,600.05 26 2211501 AGGREGATE BASE CLASS 5 CU YD 375.0 $23.32 $8,745.00 $29D0 $10,875.00 $25.00 $9,375.00 $28.00 $10,500.00 27 2215501 81TUMINIOUS PAVEMENT RECLAMATION 10' SO YD 4,667.0 $0.75 $3,500.25 $1.25 $5,833.75 $2.25 $10,500.75 $1.25 $5,B33.75 28 2360501 TYPE SP 12.5 WEARING COURSE 2,C SPWEB240D 2360 TON 1,210.0 S6 B5 $]9,6]8.50 $6860 $83,248.00 $68.00 $82,280.00 $68.00 $82,280.06 29 236 02 TYPE SP 12.5 NONWEARINGCOURSE 2,8 SPNWB2308 2360 TON 605.0 $58.75 $35,543.75 $56.30 $34,061.50 $65.00 $39,325.00 $56.00 $33.880.00 30 2360.601 BITUMINOUS PATCH SO FT 1,406.0 $4.59 $6,453.54 $6.75 $9,490.50 $5.00 $7,030.00 $5.50 $],]33.00 31 2451.509 AGGREGATE BEDDING CU YD 100.0 $38.00 affloDO $1.00 $100D0 $25.00 $2,500.00 $55.00 $5,500.00 32 2502.603 4' PE PERF DRAINTILE LIN FT 1,960.0 $13.75 $26,9 .00 $11.00 $21,560.00 $12.00 $23,520.00 $7.00 $13,720.00 33 2502.603 6' PE PERF DRAINTILE LIN FT 10.0 $21 A2 $218.20 $16.00 $160D0 $25.00 $250.00 $30.00 $300.00 34 2503 11 4' PVC SDR 26 SERVICE PIPE LIN FT 85.0 $31.40 $2,669.00 $51.00 $4,335.00 $35.00 $2,975.00 $62.00 $5,270.00 35 2503 11 8' PVC SDR 35 SEWER PIPE LIN FT 378.0 $35.98 $13,600.44 $47D0 $1],]66.00 $28.00 $10,584.00 $39.00 $14.742.05 36 2503 41 12' RC PIPE SEWER DES 3006 CL V LIN FT 262.0 $3260 $8,593.60 $51.00 $13,362.00 $29D0 $7,5%.00 $38.00 $9.956.00 37 2503 41 15' RC PIPE SEWER DES 3006 CL V LIN FT 399.0 $34.90 $13,925.10 $52.00 $20,748.00 $41.00 $16,359D0 $53.00 $21 147.00 38 2503 41 18' RC PIPE SEWER DES 3006 CL V LIN FT 342.0 $35.04 $11,983.68 $53.00 $18,126.00 $44.00 $15'wm $43.00 $14.706.00 39 2503 41 21' RC PIPE SEWER DES 3006 CL V LIN FT 325.0 $MB2 $12,616.50 $59.00 $19,1 ]5.00 $49.00 $15,925.00 $48.00 $15.600.05 40 2503 41 24' RC PIPE SEWER DES 3006 CL V LIN FT 25.0 $54.38 $1,359.50 $70.00 $1,750D0 $59.00 $1,475D0 $154.00 $3,850.00 41 2503.602 CONNECT TO EXISTING STORM SEWER, PIPE TO EXISTING PIPE EACH 2.0 $800.00 $1,600D0 $820.00 $1,640D0 $1,500D0 $3,000.00 $640.00 $1,280.00 42 2503.602 CONNECT TO EXISTING STORM SEWER, PIPE TO EXISTING STRUCI EACH 3.0 $800.02 $2,400.00 $1,555.00 $4,665D0 $1,500D0 $4,500.00 $640.00 $1,920.00 43 2503.602 CONNECT TO EXISTING SANITARY SEWER SERVICE EACH 3.0 $400.0. $1,200D0 $454.00 $1,362D0 $1,200D0 $3,600.00 $300.00 $900D0 44 0.000 CONNECT TO EXISTING SANITARY SEWER SERVICE WYE EACH 2.0 $425.00 wo.ml $649.00 $1,698D0 $1,200D0 $2,400.W $350.00 $700.00 45 2503.602 8'X4'PVCSDR26WYE EACH 1.0 $201.00 $201D0 $110.00 $110D0 $1,500D0 $1,500D0 $350D0 $350D0 46 2503.602 CONNECT TO EXISTING SANITARY SEWER MANHOLE EACH 1.0 $1,900.00 $1,900D0 $850.00 $850D0 $1,800.00 $1,wom $1,500.00 $1,500.00 47 2504.601 TEMPORARY WATER SERIVCE LUMP SUM 1.0 $3,000.00 $3,000D0 $5,152D0 $5,152.00 $16,000.00 $16,000D0 $5,000.00 $5,000.00 48 2504.602 CONNECT TO EXISTING WATER SERVICE EACH 1.0 $450.00 $450D0 wam $453D0 $1,200.00 $1,200D0 $500.00 $500.06 49 2504.602 HYDRANT EACH 2.0 $3,125.00 $6,250.00 $3,863.00 $],]26.00 $4,500.00 $9,000D0 $4,800.00 $9.600.00 50 2504.602 6'GATE VALVE AND BOX EACH 2.0 $1,062.00 $2,124.00 $1,300D0 $2,600.00 $1,800.00 $3,600.00 $1,700.00 $3.400.00 51 2504.602 8' GATE VALVE AND BOX EACH 4.0 $1,466.00 $5,864.00 $1,734.00 $6,936.00 $2,400.00 $9,600D0 $2,300.00 $9.200.05 52 2504.602 12'GATE VALVE AND SOX EACH 6.0 $2,595.00 $15,570.00 $2,984D0 $17,904.00 $4,300.00 $25,800.00 $4,000.00 $24,000.00 53 2504.602 ADJUST VALVE SOX EACH 10.0 $500.00 $5,000D0 $325.00 $3,250D0 $150.00 $1,500D0 $350.00 $3,500.00 54 2504.602 WATERMAIN OFFSET EACH 3.0 $2,500.00 $7,500.00 $2,982.00 $K, 6D0 $5,500D0 $16,500D0 $5,500D0 $16,500.00 55 2504.602 1' CURB STOP & BOX EACH 1.0 $350.00 $350D0 $224.00 $224.00 $550D0 $550.00 $600D0 $600.00 56 2504.602 1' CORPORATION STOP EACH 1.0 $340.00 $340.00 $211.00 $211.00 $350D0 $350.00 $600.00 $600.00 57 2504.602 CONNECT TO EXISTING WATERMAIN EACH 7.0 $1,200.00 $8,400D0 $1,226.00 $K, 2.00 $1,200.00 $8,400.00 $1,500D0 $10,500D0 58 2504.603 6' PVC C-900 DR 18 WATERMAIN LIN FT 49.0 $32.66 $1,60- $l5.00 $2,205D0 $150.00 $],350.00 $68D0 $3,332D0 59 2504.603 8' PVC C-900 DR 18 WATERMAIN LIN FT 136.0 $34D4 $4,738.24 $49.00 $6,664.00 $29.00 $3,944.00 $69.00 $9,384.00 60 2504.603 12' PVC C-900 DR 18 WATERMAIN LIN FT 948.0 $!4.]1 $42,385.08 $55D0 $52,140.00 $45.00 $42,660.00 $69D0 $65,412.00 61 2504.604 WATERMAIN INSULATION SO YD 10.0 $38.00 $380.00 $49.00 $490.00 $45.00 wo.ml $70.00 $700.00 ABSTRACTS OF BIDS 2015 -57TH STREET & UTILITY IMPROVEMENTS CITY OF ALBERTVILLE, MN RMI 1tR1fi 196732 ITEM MNIDOT NO. SPEC NO. ITEM DESCRIPTION APPROX. UNIT QUANTITY NORTHWEST ASPHALT SHAKOPEE, MN UNIT PRICE AMOUNT S.R. WEIDEMA MAPLE GROVE, MN UNIT PRICE AMOUNT DAVE PERKINS CONTRACTING NOWTHEN, MN UNIT PRICE AMOUNT MIDWEST CIVIL CONSTRUCTORS SHAKOPEE, MN UNIT PRICE AMOUNT 621 2504.608 IPIPE FITTINGS POUND 1,311.0 $5.95 $7,800.45 $8.75 $11,471.25 $6.00 $7,866.00 $10.00 $13,110D0 63 2504.608 1' WATER SERVICE PIPE LIN FT 43.0 $3029 $1,302.47 $43.00 $1,849.00 $35.00 $1,505.00 $42.00 $1,806.00 64 2506.501 CONSTRUCT DRAINAGE STRUCTURE DES 484020 LIN FT 12.8 $248.00 $3,174.40 $427.00 $5,465.60 $250.00 $3,200D0 $410.00 $5,248.00 65 206501 CONSTRUCT DRAINAGE STRUCTURE DES 6D4020 LIN FT 5.4 $485.00 $2,638.40 $519.00 $2,]]4.40 $1,700.00 $9,248.00 $520.00 $2,828.80 66 2506.501 CONSTRUCT DRAINAGE STRUCTURE DES 484022 LIN FT 17.1 $248.00 $4,230.88 $368.00 $6,278.08 $440.00 $7,506.40 $330D0 $5,629.80 67 2506.501 CONSTRUCT DRAINAGE STRUCTURE DES 604022 LIN FT 5.2 $485.00 $2,522.00 $500.00 $2,600.00 $1,350D0 $7,020.00 $900D0 $4,680.00 68 2506.501 CONSTRUCT DRAINAGE STRUCTURE SPECIAL R-1 2k3' LIN FT 34.1 $267.00 $9,112.71 $344.00 $11,740.72 $350D0 $11,945.50 $320.00 $10,921.60 69 2506.602 CASTING ASSEMBLY STORM EACH 17.0 $475.00 $8,075.00 $434.00 $],3]8.00 $550D0 $9,3 .00 $520.00 $$S40D0 70 2506.602 ADJUST FRAME & RING CASTING EACH 5.0 $850.00 $4,250.00 $504.00 $2,520.00 $450D0 $2,250.00 $300D0 $1,500.W 71 2506.602 CASTING ASSEMBLY SANITARY EACH 1.0 $1,075.00 $1,075.00 $456.30 MEW $450D0 $450D0 $600.0O $600.00 72 2506.612 CHIMNEY SEAL EACH 3.0 $215.00 $645.00 $243.00 $729.00 $250.00 $750.00 $300.00 $900.00 73 2521.501 5' CONCRETE WALK SO FT 12,090.0 $4.38 $52,954.20 $4.35 $52,591.50 $4.00 W,moD0 $5.00 $60,450.05 74 2521.511 3' BITUMINOUS DRIVEWAY SO YD 22.0 $38.70 $851.40 $3455 $760.10 $45.00 $990D0 $35.00 $]]0.00 75 2531.501 CONCRETE CURB & GUTTER LIN FT 2,236.0 $1121 $25,065.56 $11.75 $26,273.00 $11.00 $24,5%.00 $11 m $25,714.00 76 2531.507 6' CONCRETE DRIVEWAY PAVEMENT SOFT 3,60135 $6.03 $21,716.14 $5.45 $19,6 TM $6.00 $21,6M.10 $5.50 $19,807.43 ]] 2531.604 CONCRETE VALLEY GUTTER SO FT 383.0 $4.76 $1,823.08 $5.50 $2,106.50 $6.00 $2,298.00 $7.25 $2,776.75 78 2531.618 TRUNCATED DOMES SO FT 112.0 $37.00 $4,144.00 $35.00 $3,920D0 $40.00 $4,480.00 $35.00 $3,920.00 79 25 1.601 TRAFFIC CONTROL LUMP SUM 1.0 $8,850.00 $8,850D0 $8,000.00 $B4O00DO $4,200.00 $4,200.00 $6,000.00 $6,000.00 80 2564531 SIGN PANELS TYPE C SOFT 61.0 $42.00 $2,562.00 "m $1,799.50 $35.00 $2,135.00 $51.00 $3,111D0 81 2573502 SILT FENCE, TYPE MACHINE SLICED LIN FT MOD $3.50 $1,190D0 $3.70 $1,258.00 $2.50 $850D0 $3.00 $1,020.00 82 25735W STORM DRAIN INLET PROTECTION EACH 21.0 $100D0 $2,100.00 $411D0 $8,631D0 $250.00 $5,250D0 $225D0 $4,725.00 83 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1.0 $1,OOODO $1,OOODO $1,5 TW $1,557.00 $1,200D0 $1,200D0 $3,OOODO $3,OOOD0 84 2575505 HYDROMULCH, SEED MIX 25-131, FERT TYPE 3 22-5-10 SO YD 2,055.0 $2D0 $4,110.00 $2.30 $4,726.50 $2.00 $4,110.00 $2.00 $4,110.0 85 258 02 4' BROKEN LINE YELLOW - EPDXY LIN FT 427.0 $0.80 $341.60 $0.95 $405.65 $1D0 $427.00 so S85AD 86 258 02 4' SOLID LINE YELLOW - EPDXY LIN FT 630.0 $0.50 $315.00 $0.60 $378.00 $1D0 $630D0 $0.20 $126.00 87 258 02 4' SOLID LINE WHITE - EPDXY LIN FT 1,740.0 $0.50 $870.00 $0.60 $1,044.00 $1D0 $1,740.00 $0.20 $348.05 88 258 02 24'STOPLINEWHITE-EPDXY LIN FT 131.0 $&w $1,O48D0 $9.30 $1,218.30 $9D0 $1,179.00 $SDO $1,048.00 89 2582.602 PAVEMENT MESSAGE RT ARROW EPDXY EACH 4.0 $95.00 $380D0 $110D0 $440.00 $100D0 $400.00 $100D0 $400.00 90 258 W CROSSWALK MARKING - EPDXY SO FT 990.0 $4.45 $4,405.50 $5.15 $5,098.50 $6.00 $5,940D0 $4.00 $3,960D0 TOTAL COSTSTREET IMPROVEMENTS $831454.51 $841951.0 W0,231.75 $910123.53 SCHEDULE B: PARKING AREA IMPROVEMENTS 1 2021.501 MOBILIZATION LUMP SUM 1.0 $3,890.00 $3,890D0 $10,]]0.00 $10,]]0.00 $2,000.00 $2,000.00 $15,000.00 $15,000.00 2 2101.511 CLEARING & GRUBBING LUMP SUM 1.0 $3,500.00 $3,500D0 $3,500D0 $3,500D0 $2,500D0 $2,500.00 $7,000.00 $7,000.05 3 2104.51U REMOVE CURB & GUTTER LIN FT 453.0 $4D0 $1,812.00 $3.85 $1,744.05 $3.00 $1,359D0 S3.00 $1..359.00 4 2104.501 REMOVE WOODEN FENCE LIN FT 75.0 $10.00 $750.00 $7.00 $525.00 $10.00 $750.00 $5.00 $375.00 5 2104.503 REMOVE CONCRETE PAVEMENT SO FT 1,390.0 $1D0 $1,390D0 $0.75 $1,042.50 $2.00 $2,780.00 $2.00 $2,780.00 6 2104.503 REMOVE RETAINING WALLLUMBER) LIN FT 110.0 $]DO $]]0.00 $10.00 $1,100D0 $35.00 $3,850D0 $]DO $]]0.00 ] 2104.505 REMOVE BITUMINOUS PAVEMENT SO YD 274.0 $5D0 $1,370.00 $6.45 $1,]6].30 $3.00 $822.00 $9D0 $2,466.00 8 2105.501 COMMON EXCAVATION P EV CU YD 1,351.0 $17.00 $22,96]DO $12.75 $17,225.25 $12.00 $16,212.00 $1550 $20,940.50 9 2105.533 SALVAGED AGGREGATE IN STOCKPILE LV CU YD 815.0 $6.]0 $5,460.50 $4.70 $3,830.50 $&w $6,520.00 $5D0 $4,075.00 10 2105533 SALVAGED AGGREGATE FROM STOCKPILE CV CU YD 545.0 $15.70 $K, 6.50 $9.35 $5,095.75 $&w $4,360.00 $10.00 $5,450D0 11 2211501 AGGREGATE BASE CLASS 5 CV CU YD 500.0 $27.63 $13,815D0 $29D0 $14,500.00 $25.00 $12,500.00 $28.00 $14,000.00 12 2215501 BITUMINOUS PAVEMENT RECLAMATION 6' SO YD 3,816.0 $1D0 $3,816.00 $1.30 $4,%0.80 $2.50 $9,540D0 $1.10 $4,197.60 13 2360.501 TYPE SP 9.5 WEARING COURSE2,8 SPWEA2408 2360 TON 653.0 $69 5 $45,416.15 $62 5 $40,845.15 $70.00 $45,710.00 $63.00 $41,139D0 14 236 02 TYPE SP 12.5 NON- WEARING COURSE2,8 SPNWB2308 2360 TON 653.0 $6367 $41,707.11 $6150 $40,159.50 $63.00 $41,139D0 $61.00 $39.833.00 15 2521.618 THICKENED EDGE CONCRETE WALK SOFT 55].0 $5.40 $3,00].80 $6.55 $3,648.35 $5.00 $2,785.00 $9D0 $5,013.00 16 2531.501 CONCRETE CURB &GUTTER LIN FT 300.0 $28.00 $8,400.00 $18.10 $5,430.00 $1 ].00 $5,100.00 $19.00 $5.700.00 17 2540.603 FURNISH AND INSTALL RETAINING WALL SO FT 405.0 $25.00 $10,125.00 $31.00 $12,555D0 $35.00 $14,1 ]5.00 $40.00 $16.200.00 18 2564.602 SALVAGE & REINSTALL SIGN EACH 6.0 $100D0 $600D0 $116D0 $696.00 $150D0 $900D0 $100D0 $600.00 19 2573502 SILT FENCE MACHINE SLICED LIN FT 410.0 $3D0 $1,230.00 $3.25 $1,332.50 $2.50 $1,025.00 $3D0 $1,230.00 20 257556 HYDROMULCH, SEED MIX25-131, FERTTYPE 3 22-5-10 SO YD 1,282.0 $2.75 $3,525.50 $2.30 $2,948.60 $2.00 $2,564.00 $2.00 $2,564.05 21 2582501 HANDICAP PARKING SPACE SYMBOL - PAINT EACH 8.0 $25.00 $200.00 $28.95 $231.60 $50.00 $400.00 $46.00 $368.00 22 258 02 4' SOLID LINE WHITE -PAINT LIN FT 2,-A $0.60 $1,]61.60 $0.70 $2,055.20 $1.00 $2,936.00 $0.85 $2,495.60 TOTAL SCHEDULE B: $184,0]0.16 $175,963.05 $179,9 .88 $193,555.]0 TOTAL SCHEDULE A+B: $1,015,524.67 $1,017,914.32 $1,030,258.75 $1,103,6]9.23 Nb£rtvi11e Mayor and Council Communication Small Tnw LM,,Q, StQ Cay Uf.• April 2, 2015 SUBJECT: PUBLIC WORKS - MAINTENANCE WORKER I POSITION RECOMMENDATION: It is respectfully requested that the Mayor and City Council consider the following: MOTION TO: Authorize Public Works to advertise for a full-time Maintenance Worker Level 1. BACKGROUND INFORMATION: The Public Works Department is recommending adding a full-time Maintenance Worker to Street and Parks Division. Currently Public Works staffing consists of six (6) full-time employees (Utilities — 3, Streets and Parks - 3) and temporary or seasonal help as needed. This is Anecessary addition as Public Works responsibilities have increased over the years while staffing levels have remained flat. The added work is due to several factors including added infrastructure, aging infrastructure, and improved delivery of our services. In the last decade, Public Works responsibilities have grown to include: • Five new parks (Towne Lakes, Villas, Winter, Memorial, Hunters) and additions to existing parks. The majority of time spent at parks includes mowing, field prep, and attention to the outdoor rink. • Maintenance of the CSAH 19 medians and several other green spaces throughout the community. • The department now provides in-house maintenance and repair of the City's irrigation systems. • Major vehicle and equipment repairs as well as routine maintenance are both done in- house. Public Works is also providing mechanic services for the Fire Hall and STMA Ice Arena. • The department has greatly increased its involvement with facility management and cleaning for City Hall, Fire Hall, and the two other City -owned buildings on Main Avenue NE. • Eight (8) lift stations have been added since 2001. • Sewer and water maintenance programs have been enhanced, e.g. sewer jetting. • Public Works Supervisors are performing site inspections as part of the code compliance policy. • Crack sealing and the majority of street patching are now being done in-house. • Set up for City Hall room reservations (10 plus hours per week). • Additional compost site time is provided due to the increased usage by the public. • Daytime response to fire calls by Public Works. All six full-time employees are training to assist with daytime calls. On average, 2 to 3 PW employees respond to daytime fire calls, with each call typically consuming 1 to 4 hours. M:\Public Data\City Council\Council Packet information\2015\040615\040215 PW Employee Posting RCA.doc Meeting Date: April 6, 2015 enda Page 28 Mayor and Council Communication — April 2, 2015 Maintenance Worker Position Page 2 of 2 KEY ISSUES: • This is an established position/job description with a pay range of $21.84 - $24.71/hour. • To maintain the level of service currently provided by Public Works, additional staffing is needed. • The position is included in the 2015 Budget. • The position will be advertised in the official paper and through the League's website. • Staff will develop a hiring schedule with an anticipated start date for mid -summer. • The Council will need to formally approve the staff recommended candidate. FINANCIAL CONSIDERATIONS: The 2015 Budget includes funding for this full-time position. LEGAL ISSUES: The City Council has the authority to adjust staffing, advertise positions, and hire a qualified candidate. Submitted Through: Adam Nafstad, City Administrator-PWD Documents on File: PW Maintenance Worker I Job Description Position Posting M:\Public Data\City Council\Council Packet infonnation\2015\040615\040215 PW Employee Posting RCA.doc Meeting Date: April 6, 2015 enda Page 29 �lbcrtvi11C ��ftmuft. Mayor and Council Request for Action April 2, 2015 SUBJECT: ADMINISTRATION — SUPPORT OF SCHOOL FUNDING LETTER RECOMMENDATION: It is respectfully requested that the Mayor and Council consider the following: MOTION TO: Endorse letter prepared by the STMA School Board to be sent to elected State leaders. BACKGROUND: Inequity in education funding has been a longtime issue and discussion in our communities. The STMA School District has worked tirelessly to address the state funding imbalance and the impact it has on the district and tax payers. At the recent joint governance meeting, STMA Board Chairman Birk presented the attached letter and asked for the Cities of Albertville and St. Michael to endorse the letter. Submitted Through: Adam Nafstad, City Administrator-PWD Attachments: School Funding Letter M:\Public Data\City Council\Council Packet infonnation\2015\040615\2015-04-06 School Funding Letter (RCA).doc Meeting Date: April 6, 2015 enda Page 30 State Leaders: We are writing to you on behalf of the entire St. Michael -Albertville community regarding inequity in K-12 public school funding. As you move towards the end of the legislative session, we ask that you address the issue of school funding inequity. We believe that the inequity issue is a non- partisan issue and presents significant statewide policy impacts including: (1) widening the opportunity gap between similar students in demographically similar districts; (2) inhibiting local innovation to best prepare students to be career and college ready; and (3) impacting our ability to be competitive in attracting and retaining talented teachers and administration. Adequate funding for all schools is critical to building a 21s' century state economy and spurring economic vitality throughout all the communities in Minnesota. A uniform system of public schools is a constitutional obligation. While we do not believe fixing the inequity issue necessarily requires more spending, we acknowledge that addressing this issue is easier when overall education spending is increasing. Ensuring that all schools receive adequate funding for a basic education could be addressed by spending as little as $10 million per year, or only 4%, of the $500 million commitment to education currently being discussed by legislators of both political parties and the governor, and without taking existing state funds from other districts. We intend to hold state leaders from both parties accountable for continued inaction. For years, the state legislature failed to seriously address the inequity issue due to declining or stagnant state revenues. An outcome, whereby the legislature authorizes spending a record amount of money on education while failing to take any significant measures to reduce inequity, would be devastating to our community. We sincerely appreciate your service and, as elected leaders, recognize that spending decisions are always difficult. We only ask that you carefully consider the legitimate and competing needs of all Minnesota school districts in deciding how to allocate future state funds to education. If you have any questions, please do not hesitate to call Dr. Jim Behle, Superintendent at 763497-6500 or email him at iamesb@stma.kl2.mn.us. Sincerely, STMA School Board; St. Michael City Council; and Albertville City Council. Agenda Page 31 A\Ibertvillc City Administrator's Update Small TQ— Living. Big C,ty Life, April 2, 2015 GENERAL ADMINISTRATION Joint Workshop: There is another Joint City Council and Planning Commission workshop scheduled for Tuesday, April 14 at 7:30 p.m. to continue discussion on the 2012 Visioning Study and outline priorities for 2015. STMA Ice Arena Board: At their last meeting, the Board discussed the proposed 2015 Budget and potential $5/hour rental increase to help offset increased utility expenses. Also, the STMA Youth Hockey Association presented the Board with a resolution stating the Association's commitment and desire to move forward with a second sheet of ice. This spring, Grant noticed some ice issues with the locker room roof, which we are looking into. This issue is separate from the dehumidification. Law Enforcement Update: Staff has invited Sheriff Hagerty to update the City Council on April 20. Staff is hoping to schedule the Sheriff for 6:30 p.m. between the Local Board of Appeals and Equalization and City Council meetings. Fire Department: The Fire Committee met on Wednesday, March 25. Fire Chief Bullen started work on April 1. Eric will be sworn in on April 9, 8:00 p.m. at the Fire Department's monthly business meeting. The meeting will be posted, so Council members can attend. The Department is researching command vehicles and will be providing a recommendation at a future meeting. In the meantime, the Chief will be using Utility 11. Parks Committee: The Parks Committee reviewed two letters of interest at their March 23 meeting. The Committee has recommended the appointment of Larry Boller to the Parks Committee. 2014 Annual Audit: KDV will present to the City Council on April 20 and to the Arena Board on April 13. Prairie Run HOA: A meeting of the Association has been called for April 9 to discuss and approve the modified declarations previous reviewed by Council. Tina and Mike will be representing the City. Wright County Area Transit: Trailblazer is currently working with the City of Buffalo to construct a facility in Wright County. In general, Wright County transit needs are high and Trailblazer is working to grow and meet demands. On average there are approximately 100 to 150 rides to or from Albertville per month. The next WCAT meeting will be May 19. Agenda Page 32 ENGINEERING/PUBLIC WORKS 57th Street NE/Church of St. Albert Improvement Project: If the Council approves the R/W agreement and awards the project, staff will schedule information meetings with the adjacent property owners. 54Street NE and Barthel Industrial Drive NE: The contractor is working on some erosion control issues and plans to begin restoration soon. We plan to have the project complete in its entirety by May 31. Public Works Committee: Tim and I will be setting a public works committee meeting to discuss 2015 equipment purchases/replacement and the new Public Works position. Annual Crack Sealing: Public Works crews will begin crack sealing the second week in April, weather permitting. Greenhaven Streets: I recently reviewed the condition of the two Greenhaven streets and believe it may be necessary to replace the reclaim and pave the streets this construction year. I will have more information at a future meeting. UPCOMING EVENTS and ANNOUNCEMENTS (none) Attachments: (none) City Administrator's Update Page 2 of 2 April 2, 2015 Agenda Page 33