2015 Visioning Updatee
t
a
d
p
U
g
n
i
n
o
i
s
i
V
5
1
0
2
2
ISSUES MAP
3
Marketing of existing commercial lots
Ongoing maintenance of streets &
Economic Development
Waste treatment plant
Public improvements
Industrial Land Uses
Financial incentives
Industrial traffic
Nuisance issues
Public Facilities
Soccer facility
Old City Hall
Marketing
City parks
Ice arena
utilities
e
t
Keeping up with aging infrastructure
a
family development
d
Central Business District/Main St.
Number of older vacant buildings
p
U
Trail & sidewalk connections
Access to commercial areas
Current land use patterns
g
Small Town Atmosphere
Commercial Land Uses
n
ses
Development quality
i
n
Infill development
U
Housing condition
Residential Land
Streets & utilities
o
Outdoor storage
-
Pace of Growth
i
No more multi
s
i
V
5
1
0
2
4
Goal 1: Maintain and protect Albertville’s small town atmosphere and
Community volunteerism, civic organizations,
Streetscape and redevelopment of Historic
94 Ramps
High quality commercial sites and buildings
Cedar Creek Golf Course as an enhanced
e
identity through long range planning.
Implement the 2011 Trail System Plan
r
e
-
h
Enhance community gateways (I
p
s
o
Attractive neighborhoods
m
t
A
community amenity
community events
n
w
Main Street
o
and CBD)
T
l
l
a
m
S
•••••••
5
Goal 1: Manage growth that provides quality development and does not
Maintain current commercial and industrial land use patterns and zoning
Examine redevelopment opportunity on a case by case basis
New residential development pays for its own infrastructure
Patient with future land use build out
Five Year Capital Improvement Plan
Infill development (quality homes)
fiscally burden the community.
h
t
w
o
r
G
f
o
e
c
a
P
••••••
6
Goal 1: Maintain and build attractive residential neighborhoods.
future consideration
outdoor storage
Promote quality infill development
future consideration
Vacant Building Ordinance
–
Zoning enforcement
–
Code enforcement
City Code nuisance
Driveway permits
Rental Ordinance
l
a
–
Point of Sale
i
t
n
e
d
i
CIP
s
e
R
•••••••••
7
Goal 2: Provide a variety of housing options to meet the life cycle needs of
reinvestment in multiple family housing stock
Limit future multiple family development to
Enforcement of Rental Ordinance, promote
Pursue and promote age restricted housing
High design guidelines for multiple family
guided and zoned locations
Albertville residents.
Exterior finishes
l
a
development
Open space
i
t
Parking
Garage
n
existing
e
d
i
––––
s
e
R
••••
8
Goal 1: The City will continue to promote commercial development by the
City taking advantage of its access to Interchange 94 and the growing
population of Albertville and its adjoining communities.
Support reuse of older buildings/enforce sprinkler
site and street access alternatives for
Patient with infill/quality site and building design
streetscape/redevelopment/Central Park
Follow the Future Land Use Plan to direct
requirements of Regulation 1306
development
Promote new business:
locations
l
Big Box Retail
a
Lumber Yard
i
Hospitality
commercial commercial
Investigate
c
r
e
m
-
CBD
m
–––
o
C
••••••
9
Goal 1: Promote continued industrial development in order to expand local
employment opportunities and the City’s tax base.
Continue to examine industrial zoning standards
Follow Land Use Plan to guide future industrial
Open lines of communication with location
Market City owned lots
l
a
i
industries
r
land use
t
s
u
d
n
••••
I
10
Goal 1: The Vision Committee identified commercial and industrial growth as
a priority for the community. The City will become more aggressive in its
economic development promotion efforts.
Financial incentive (tax abatement, TIF)
Define land use areas for commercial
t
n Economic Development Strategies:
e
m
p
o
l
e
Capital improvements
Preferred businesses
v
Taxes, fees, charges
industrial growth
In place expansion
e
D
Communicate
c
Advertising
i
m
o
n
&
o
c
E
•••••••••
11
City’s long range needs, facilitate development, and contribute to the quality
Goal 1: Ensure public facilities are designed and constructed to address the
Extend sewer and water to the golf course
north of the outlet mall
94/CR 19
Waste Treatment Plan improvements
Share facilities and services with
-
Complete Phase I & II of the I
s
e
i
t
of life in Albertville.
i
neighboring cities
l
Expand Ice Arena
–
Upgrade CR 19
i
c
a
F
c
i ramp
l
b
u
P
••••••
12
community.
sustaining
-
self
Goal 1: Maintain Albertville as a financially sound,
Grow the City per the Future Land Use Plan
Balance expenditures with revenues
Special assessments assign cost to
Allocate cost to services users
Pursue grants and loans
benefitted properties
Fee/charges
e
c
n
a
CIP
n
i
F
•••••••
13
14
15
16
17
18
and Otsego.
ompleted. Phase II ongoing.
Joint agreement with Wright County
Scheduled Completion
2014 Completion
2014 Completion2014 Completion2014 Completion
2014 Ongoing
Completed
STATUS:
Ongoing
c
OngoingOngoing
Phase I
2014
Fiber Optic Connections Between City Hall, Public Works, Fire Hall, Ice
Sewer and Water Extension to Golf / Jason Redevelopment
New Community Playfield North of Waste Treatment Plant
PROJECTS)
Waste Treatment Plant (Phosphorous Reduction)
Waste Treatment Plant (Digester/Reed Beds)
Street Improvements / Sewer & Water
II
County Ditch 9 Improvements / Clean Out
Trail Improvements along County Road 18
Phase
Street Storm Sewer Improvements
Waste Treatment Plant (Pond Removal)
: (2012 ORIGINAL
s
94 / County Road 19 Interchange
Green Haven Utility Improvements
Economic Development Incentives
e
i
t
i
Barthel Industrial Park Ditch
2012 Overlay and Seal Coat
r
Stormwater Pond Cleaning
o
i
County Road 19 North
r
TEN YEAR PROJECTS
Ice Arena Expansion
P
r
Main Street
a
e
Y
Arena
thth
5057
0
-
I
1
19
Economic Development Policy
Development Opportunities
Development
lots
Opportunities
Broadcasting of Meetings
City owned industrial
Development
Public Hearing Notices
9 ) West Bridge Church
Future Development
5) Old Castle Glass
lots
Feedback
facility
7) Hunters Pass
1 )Darkenwald
Prairie Run
Sector
8) Town Lakes
6) Mold Tech
Investment
Newsletter
Economic
Soccer
Current
Private
Website
Public
2) 3) 4)
Improved pedestrian crossing between Outlet Mall
Commercial (Development Considerations)
Storm Drainage/Stormwater Management
Residential (Development Considerations)
Industrial (Development Considerations)
Community Pool (Planning Commission)
Phases II and III (Planning Commission)
s
(Existing Conditions)
sidewalks
(Existing Conditions)
c
i
(Existing Conditions)
Commercial (Future Growth)
p
Residential (Future Growth)
o
)
T
Industrial (Future Growth
Waste Water Treatment
Issues
Bikeways, trails, paths,
Parks and Open Spaces
y
Facilities
t
i
Land Use/Zoning
r
o
Transportation
i
Commercial Community
r
Residential
Industrial
P
Hall
/
l
Streets
Transit
Soccer
Arena
a
City
o
G
20
Code issues with brew pubs, tap rooms,
Vision Plan Update/Workshop Follow Up
Taco John’s (Red Rooster Properties)
Closing and Final Plat
Prairie Run/Fieldstone Purchase
Prairie Run Purchase Agreement
Background check for temp PW
Transit Joint Powers Agreement
Old Castle Glass Loading Docks
Grading Permit
Cities JP
Peddle Pub Permit Request
Kassel Avenue Construction
Federated Coop Expansion
(legal review)
Sale Liquor
Fence Request
–
Trailblazer Transit
OPUS Distribution
Prairie Run Offers
Outlet Mall Signs
Brothers
–
–
Bros.
Hunters Pass
Arrangement
Fence
-
Agreement
Off
FYCC Leaseemployee
Niemeyer
…
growlers
Woby’s
OmannOmann
GentzGentz
.24.25.26.27.28.29.30.31.32.33.34.35.36.37.38.39.40.41.42.43.44.45.
23
Shoppes at Town Lakes II Letter of Credit
Precinct Review and Recommendations
Niemeyer Special Assessment Deferral
RFP, Landscape, Schedule
Plat and
Jeff O’Brien
Letter of
Warning and Informed
STMA Ice Arena Improvements Bid
Fire Pension/Relief Council Report
Lot Split Agreement
-
Hunter’s Pass 2nd Addition
STMA Ice Arena Disclaimers
Planning Commission Items
4
Fiber and Phone Upgrades
Addition
City Owned Lot Valuations
CGI, Inc. Video Production
1
–
Towne Lakes PUD/ HOA
Report
0
2
Planning Chair/Vice
s
Finance Year End
Arena Agreement
Tax Forfeited Lots
PUD Amendment
m
rd
Consent Forms
3
Cove
e
Vision Update
Users
–
t
Prairie Run
Darkenwald
I
Tennessen
a. Rental
d
MFU Fee
b. Rink
Karston
Credit
e
t
e
l
p
m
o
C
10.11.12.13.
14.15.16.17.18.19.20.21.22.
1.2.3.4.5.6.7.8.9.
21
Agreement with Wright County and Otsego 2018
STATUS:
OngoingOngoing
2015
Connection Between Outlet Mall
Street / CR 19 Intersection Dedicated Left Turn
Street Improvements / Sewer & Water
Point of Sale
Phase II
Future Development of Compost Site
Prairie Run Lots
Addition
Street
:
NEXT TEN YEAR PROJECTS
Replacement of Bituminous Trails
Project
Street Maintenance and Repair
Transportation Improvements
94 Coalition
Haus
–
th
Maintenance Code
th
North / 70
Residential Improvements
Trail Around Hunter’s Lake
Out of Hunter’s Pass
Build Out of Town Lakes 7
Street Improvement
Angels / Engel
94 / CR19 East Ramp
Pedestrian
Market and Develop
-
Third Lane / I
County Road 19
Main Street
Improved
Guardian
Housing
–
2015
Build
ththth
94
575750
--
II
22
STATUS:
Ongoing
OngoingOngoingOngoing
2020
New Community Playfield North of Waste Treatment Plant
Pool / Splash Park (Planning Commission)
Implementation / Caboose Depot
Waste Treatment Plant (Phosphorous Reduction)
Waste Treatment Plant (Digester/Reed Beds)
County Ditch 9 Improvements / Clean Out
Waste Treatment Plant (Pond Removal)
:
Green Haven Utility Improvements
NEXT TEN YEAR PROJECTS
STMA Soccer Facility Expansion
Public Facility Improvements
Stormwater Pond Cleaning
Trail Around Hunter’s Lake
Ice Arena Expansion
Central Park Plan
Community
–
2015
23
20162016
STATUS:
OngoingOngoing
--
2015 2015
ZACHMAN Property
–
Land
City Improvements to Create Additional Industrial
YEAR PROJECTS:Development IncentivesDevelopment Incentives
Commercial Improvements
Old Castle Glass Expansion
Industrial Improvements
examine Sign Code
Expansion
ZACHMAN Property
TEN
Commercial
Lots
City Owned Lots
NEXT
Darkenwald
City Owned
Mold Tech
EconomicEconomic
-
2015
Infill
-
Re