Loading...
2015-11-15 STMA Ice Arena Board Packetoily of A,lbertville STMA t. Michael 5mol To n Lkino. No Gbu M6 STMA ARENA BOARD AGENDA MONDAY, NOVEMBER 9, 2015 ALBERTVILLE CITY HALL 6:00 PM 1. CALL TO ORDER — ROLL CALL 2. ADOPT AGENDA 3. APPROVAL OF THE MINUTES OF OCTOBER 12, 2015 (pg. 1) 4. FINANCE REPORTS a) Approve the October list of claims as presented in the amount of $27,938.75 and October report (pgs. 2-4) 5. ARENA MANAGER a) Monthly report (pgs. 5-9) 6. NEW BUSINESS 7. OLD BUSINESS a) Second Sheet Discussion 8. YOUTH HOCKEY ASSOCIATION 9. ADJOURN WPublic Data\Arena\2015 STMA Ice Arena\2015 Arena Agendas\2015-11-09 STMA Ice Agenda\11092015 STMA Agenda.doc ST. MICHAEL-ALBERTVILLE ICE ARENA BOARD MINUTES October 12, 2015 6:30 p.m. Present: Chairman Chris Schumm, Members Jeff Lindquist, Gayle Weber, John Vetsch, Cody Gulick, and Walter Hudson were present. Also present: City Administrator Adam Nafstad, City Clerk Kimberly Olson, Youth Hockey Association President Josh Opiola, Roger Lucy, and Chris Hanson. The meeting was called to order at 6:30 p.m. by Chairman Schumm. Set Agenda Members Vetsch/Hudson moved to set the agenda as presented. All voted aye. Approval of Minutes Members Weber/Hudson moved to approve the minutes of the April 13, 2015 Board Meeting as presented. Aye: Schumm, Gulick, Hudson, Vetsch, and Weber. Abstain: Lindquist. Finance Reports Hudson inquired if the the budget to actual figures will eventually even out. Nafstad replied that with the summer months, they see a loss but that will be recouped with the new season. Members Lindquist/Weber moved to approve the September list of claims totaling $9,151.36 and the September Financial Report as presented. All voted aye. Arena Manager's Report Nafstad stated that work is commencing on the locker room doors. The locker room roof repair and exterior painting is complete. He stated the face of the north wall will be pressured washed. Youth Hockey Association Opiola updated the Board that hockey tryouts are over. New Business Nafstad stated the joint meeting of the cities of Albertville and St. Michael and the STMA School Board immediately follows the meeting. Hudson stated that the area of focus for him would be to see if there is consensus among each entity for a funding package. Nafstad stated that the estimated cost is a fluid figure and is based on the previously preferred concept, inflation, overhead, bleachers and concessions. Adiourn Members Lindquist/Hudson moved to adjourn at approximately 6:53 p.m. All voted aye. Attest: Tina Lannes, City Finance Director STMAArena Mtg 11/09/15 page 1 A of Ibcrtvi £ AMA t. Achael li SMOU living- 9iq lips. STMA Ice Arena Budget to Actual October 2015 (Cash Basis) Income Ice Rental (currently includes Dec Acct. Rec.Collected Concessions Other Revenues (Advertising/LMC/ins claims) Vending Open Skate/Hockey, etc Interest Misc Revenue Total Income Expenses Salaries, wages, taxes & Benefits Supplies (Office, misc) Supplies (Concession) Fuel, Misc Professional Services Sales Tax Telephone Electric Gas Water Refuse Insurance Administration Misc. Repair Maintenance — Machinery Repair Maintenance — Building Total Operating Expenses Net Income/Loss 2015 Actual Sept 2015 YTD % 2015 Budget Actual 9/30/15 Annual $271,700.00 $20,792.50 $171,146.00 62.99% $32,000.00 $2,592.25 $22,906.12 71.58% $14,500.00 $0.00 $12,500.00 86.21 % $1,000.00 $0.00 $50.00 5.00% $6,500.00 $501.00 $3,552.00 54.65% $1,000.00 $0.00 $0.00 0.00% $2,000.00 $192.00 $1,743.00 $328,700.00 $24,077.75 $211,897.12 64.47% $115,713.00 $8,146.98 $85,406.68 73.81% $1,500.00 $0.00 $1,288.56 85.90% $13,250.00 $954.24 $6,733.36 50.82% $1,800.00 $76.58 $1,074.97 59.72% $15,000.00 $37.50 $9,985.34 66.57% $2,700.00 $0.00 $1,859.00 68.85% $900.00 $79.30 $728.65 80.96% $70,000.00 $5,510.19 $38,327.37 54.75% $29,500.00 $700.74 $11,873.90 40.25% $17,800.00 $846.81 $15,355.83 86.27% $1,400.00 $76.88 $1,605.27 114.66% $9,000.00 $0.00 $9,291.00 103.23% $11,920.61 $993.34 $9,933.85 83.33% $725.00 $0.00 $478.76 66.04% $10,000.00 $0.00 $1,578.21 15.78% $27,500.00 $8,000.57 $20,134.76 73.22% $328,708.61 $25,423.13 $215,655.51 65.61% ($8.61) ($1,345.38) ($3,758.39) STMAArena Mtg 11/09/15 page 2 STMA ICE ARENA CASH BALANCES AND RECEIVABLES October 31, 2015 Cash Balance Operations Cash Balance 1/1/15 $108,337 Add Revenues (collected in 2015) $178,597 Less Expenses $215,656 Cash Balance 10/31/15 $ 71,278 Cash for operations $71,278 Total Cash Balance 10/31/15 $71,278 Accounts Receivable (invoiced) Operations October 31, 2015 - $40,950.00 Cash Balance Dedicated Capital Improvement Fund Arena Owner Dedicated Cap. Imp. Fund Beginning Balance 1/1/15-$4,784 Dehumid 2nd pmt Albert ($18,241.91 billed 4/8) $18,242 Dehumid 2nd pmt St. Mich ($18,241.91 billed 4/8) $18,242 Dehumid 2nd pmt ISD 885 ($18,241.91 billed 4/8) $18,242 Rubber Ballast Roof System-$11,750 2015 contribution rec. by St. Michael (billed 11/4/15) $0 2015 contribution rec. by Albertville (billed 11/4/15) $0 2015 contribution rec. by STMA Schools (billed 11/4/15) $0 Kraft Hockeyville - Restricted $40,000 Balance 10/31/15 $78,192 STMA Arena Mtg 11/09/15 page 3 STMA Ice Arena Vendor Check Detail Register CITY OF ALBERTVILLE October 2015 Check Amt Invoice Comment 10100 Premier Bank Paid Chk# 003956E 10/5/2015 RANDYS ENVIRONMENTAL SERVICES E 810-00000-384 Refuse/Garbage Disposal $76.88 October 2015 STMA Arena Garbage Paid Chk# 003959E 10/19/2015 COURI & RUPPE, P.L.L.P. E 810-00000-304 Legal Fees $37.50 101315 STMA Arena Paid Chk# 003964E 10/19/2015 FERRELLGAS E 810-00000-212 Motor Fuels $38.29 1088660320 STMA Arena Propane E 810-00000-212 Motor Fuels $38.29 1088787139 STMA Arena Propane Paid Chk# 003972E 10/19/2015 WRIGHT-HENNEPIN COOP ELECTRIC E 810-00000-381 Electric Utilities $27.95 STMANOV2015 STMAArena Fire Panel Monitor Nov15 Paid Chk# 034753 10/5/2015 ARAMARK UNIFORM SERVICES E 810-00000-405 Repair/Maint -Buildings $16.40 1718308473 STMAArena Mats, Mop, Laundry Bag E 810-00000-405 Repair/Maint -Buildings $16.40 1718317325 STMAArena Mats, Mop, Laundry Bag Paid Chk# 034769 10/5/2015 SCR, INC - ST. CLOUD E 810-00000-405 Repair/Maint -Buildings $660.00 304662 STMA Arena Refrig Maint Contract Paid Chk# 034778 10/14/2015 CHARTER COMMUNICATIONS E 810-00000-321 Telephone $71.39 STMAOCT15 STMAArena Phone E 810-00000-321 Telephone $7.91 STMAOCT15 STMAArena Cable TV Paid Chk# 034781 10/19/2015 ARAMARK UNIFORM SERVICES E 810-00000-405 Repair/Maint - Buildings $19.70 1718326200 STMAArena Mats, Mop Paid Chk# 034782 10/19/2015 BCBS OF MINNESOTA E 810-00000-130 Employer Paid Ins (GENERAL) $752.75 C1261100NOV1 Emp Health Ins Paid Chk# 034785 10/19/2015 CENTERPOINT ENERGY E 810-00000-383 Gas Utilities $700.74 5390131-OSEP15 STMAArena 5898 Lachman Paid Chk# 034787 10/19/2015 COCA COLA ENTERPRISES BOTTLING E 810-00000-254 Soft Drinks/Mix For Resale $954.24 188193315 STMAArena Soda & Powerade Paid Chk# 034795 10/19/2015 HIGH PERFORMANCE COATINGS, INC E 810-00000-405 Repair/Maint -Buildings $6,700.00 1902 Paid Chk# 034796 10/19/2015 HORIZON ROOFING E 811-00000-520 Buildings and structures $11,750.00 98132 Paid Chk# 034808 10/19/2015 STEP SAVER INC E 810-00000-405 Repair/Maint -Buildings $108.07 93962 STMAArena Paint Front, Powerwash, Paint Doors STMA Arena rubber ballast roof system repair STMA Arena Bulk Salt Paid Chk# 034810 10/19/2015 SUPERIOR STRIPING, INC. E 810-00000-405 Repair/Maint -Buildings $480.00 38325 STMAArena Parking Lot Striping Paid Chk# 034817 10/26/2015 XCEL ENERGY E 810-00000-381 Electric Utilities $5,482.24 STMASEPT2015 STMA Arena 5898 Lachman Ave 810 STMA ARENA $27,938.75 STMAArena Mtg 11/09/15 page 4 vo� A,lbertvillf. `\ s,enr Town Lirina- Sic Citu Ufa. "IA �T MANAGER' GENERAL UPDATE Date: November 9th, 2015 To: STMA Arena Board From: Grant Fitch, STMA Arena Manager ARENA RENTAL HOURS — OCTOBER Name Prime -time Youth Hockey 184 hours AAA Hockey 0 hours High School Boys/Girls 21.5 hours Public Skating/OH 11.25 hours Private rentals 1.5 hours Learn to Skate 0 hours Total hours 218.25 hours city of . Ilic el Off-peak Northern Exterior Wall: The exterior wall was pressure washed earlier this fall to remove the staining and mold growth. Staff will look into adding a gutter to the north wall to reduce staining. Locker Room Doors: The doors and frames have been delivered and we are waiting for the steel header. We will have the concrete contractor cut the wall openings when all materials are on site. Snow Retention (Arena Roof): Each year since we replaced the roof, the snow retention clips have broken away from the standing seams. These repairs are not covered under existing arena roof warranty. The low quote to replace the clips is $1,998, however, the manufacture is recommending adding more retention bars to prevent this problem from happening every spring. The added cost is $2,800 for a total repair cost of $4798. Ebert Construction submitted the low quote (attached). This work needs to be completed before winter. Work Experience program: I will be meeting with Jen Fox (Monticello/STMA work coordinator) in the coming weeks to discuss this program. The Work Experience program is where students gain work skills/habits in a paid or non -paid situation (it has also been called On the Job training OTJ). Staffing: We are short on part-time staff and in need of adding Zamboni Drivers (preferably 2) as soon as possible. Ideally we will find individuals with operation experience and available on weeknights and weekends. In the swing season (October thru March) these drives would be able to work about 20-25 hours per week, and potentially more. We have an ad in the local paper, on the city website, with the school, thru arena manager's association, and on the LMC website. We have not received any interest. The wage range for the position is $10 to 14 per hour, based on experience. STMAArena Mtg 11/09/15 page 5 10£99 XW'9'lllAJ,-d99-lV afINEIAV NVWHDVI 8689 JoMdgu vNalav 9DI (VW,LS) TFTlAJU99lV--19VHDlW 'IS Tv:)Idxl 9do-is 'Toold Z I Z 1W)ULL - zldo-is Aoml z 1 �z NOIINM32J MONS iV 3NII 'd,l 0 A Kit z + z z o Z. x NN X 6 zJ6 —0 0 l 0owg- zz Iz Mz 0 0 00 z 0 0- z PH (763) 498 FX (763) 498. 9951 St. Michael -Albertville Ice Arena October 29, 2015 Attn: Grant Fitch 5898 Lachman Avenue Albertville, MN 55301 RE: Snow Retention Replacement - Price #1 GENERAL SCOPE: Replace four total sections of existing snow retention that was released due to access snow loads. The four section are on the south side and include a 28' section, 16', 22, and 14' section. Note: This proposal excludes the white metal finish strip to eliminate cost. A cost can be provided if the metal white strip is required. TOTAL PROPOSAL.......................................................................$1,998.00 Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Grant Fitch or St. Michael -Albertville Ice Arena Date Ebert Construction Date Page 1 of 1 Snow Retention Price #1 .doc STMA Arena Mtg 11/09/15 page 7 PH (763) 498. 7844 FX (763) 498. 9951 (800) 627. 1669 St. Michael -Albertville Ice Arena Attn: Grant Fitch 5898 Lachman Avenue Albertville, MN 55301 RE: Additional Snow Retention - Price #2 GENERAL SCOPE: October 29, 2015 Additional snow retention to be placed above the existing based on recommendations from the manufacture. Additional retention will include the following sections one at 28', 16', 22'and 14'section. This is no guarantee based on average snow falls but would be the next step to improve the weight release factor. Note: This proposal excludes the white metal finish strip to eliminate cost. A cost can be provided if the metal white strip is required. This price is based on the install at the same time as price one replacement. The proposed cost would increase if completed at a different date. Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Grant Fitch or St. Michael -Albertville Ice Arena Date Ebert Construction Date Page 1 of 1 Additional Snow Retention Price #2 - dOC STMA Arena Mtg 11/09/15 page 8 OF www.eberteonst.com PH (763) 498. 7844 FX (763) 498. 9951 (800) 627. 1669 St. Michael -Albertville Ice Arena Attn: Grant Fitch 5898 Lachman Avenue Albertville, MN 55301 RE: Roof Jack/Boot Maintenance - Price #3 GENERAL SCOPE: October 29, 2015 Based on the inspection of the snow guards the existing roof ja(.:*s/roof boots could use new mastic sealant. Overtime the sealant around penetration will breakdown. This price is based on the install at the same time as price one replacement. The proposed cost would increase if completed at a different date. TOTAL PROPOSAL.......................................................................$290.00 Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Grant Fitch or St. Michael -Albertville Ice Arena Date Ebert Construction Page 1 of 1 Price #3.doc STMA Arena Mtg 11/09/15 page 9 www.eberteonst.com