Loading...
1989-10-25 Cc Minutes Special . . . SPECIAL rotlNCIL MEETIOO OCTOBER 25, 1989 A special meeting of the City Council was called to order by Donatus Vetsch Members of the Councl.I present included Donatus Vetsch, fub Braun and Jim Krystosek Mayor Gary Schwenzfel.er and Council member Don Cornell.us were absent Others present included Maureen Andrews, Thor Meyer and fub Sullentrop The p..u:pose of the meeting was to review the bl.ds received for the enclosing of the storm drainage ditch located in the Barthel Industrial Park The Councl.I was informed that bl.ds had been recel. ved from 10 different bidders which included B.Il1..A :BIILB l:llILG EIILI! TQTAL Latour 42,210 30 26,810 00 7,672 20 6,651 75 83.344 25 RL Larson 40,479 66 25,670 00 7,603 00 17,601 50 91,354 16 Northdale 46,809 00 30,2r20 00 9,574 00 7,504 00 94,087 00 Shurcon 47,070 00 31,802l 00 11,844 00 8,029 00 98,743 00 Volk 43,251 00 27,677 50 9,235 00 19,333 30 99,496 80 furschville 48,612 00 33,6e0.e0 8,380 00 8,922 90 99,514 90 O&P 44,206 00 28,825 00 8,612.00 19,570 00 101,213 60 fIRS 44,655.10 32,2r20 00 15,085 20 10,744 65 101,213 60 Redstone 51,882 00 34,885 00 8,316 00 11,786 25 106,869 25 B&n 51,051 00 35,445 00 11,378 00 19,397 00 117,271 00 In documentation provided by the City Engineer it was pointed out that Latour Construction was the low bidder for bids "A", "B", "C" and "n" The letter noted however that Bid "C" was for the installation of a ductile l.ron pipe (n. I P) sanitary sewer line alongside the proposed b.ll.ldrng, which was eliminated because the b.ulding has been relocated to where replacement of the existing PVC sewer would not be required It was further noted that even though bid "C" had been elimmated, Latour Constructl.on still remained the low bl.dder on bids "A", "B", and "n", with bl.d "n" berng for the earthwork required for filling l.n the ditch If bid "n" was eliminated than R L Larson would become the low bidder on bids "A" and "B" . . . There was some discussion regarding whether or not backfilhng of the dJ.tch would be required It was pointed out that at this time J.t had not been determined whether or not there would be extra fill available from the Fraser Steel Company site to be used for the covering of the drainage PJ.pe which is being installed under thJ.s contract It could only be assumed that some addi tJ.onal fill will be required even though it appears that there may be some sOJ.ls available from the Fraser Steel site After some addi tJ.onal discussion Meyer-Rohlin made rec<mnendation to accept Latour Construction as the low bidder and award BaJ.d contract on the above mentJ.oned project to the same A motion was made by Bob Braun and seconded by JJ.m Krystosek to award the 1989-3 Improvement Project to Latour ConstructJ.on J.n the amount of $15.612 05 All were in favor and the motion carried It was noted that a preconstruct ion meeting would be scheduled for the next week so that work could proceed as quickly as possible Hearing no other COD'II1ents. there was a motion to adjourn the motion was made by J 1m Krystosek and seconded by Bob Braun All were J.n favor and the motion carried '1Y\~'1~ -2-